Using Operational Readiness and Plant Trials to Successfully Implement a Process Flowsheet Change

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 16
- File Size:
- 661 KB
- Publication Date:
- Jan 1, 2018
Abstract
"In 2015 Vale’s Clarabelle Mill began the process change to enable a higher degree of Cu separation. The flowsheet modification was part of a complete divisional flowsheet change being implemented in Vale’s Sudbury Operations. This paper will centre on some of the Operational Readiness (OR) work, culminating in the commissioning of the circuit in March 2017. The emphasis will be on the implementation of an integrated test plan to prepare for the process flow change through the mill.BackgroundClarabelle Mill (CBM) began making a saleable Cu concentrate in 2006 with the installation of the Cu separation circuit. Typical separation rate was 35-40% of Cu in feed reporting to Cu concentrate based on a target Ni concentrate Cu:Ni target of 0.7-0.8. The remainder of the recovered Cu (55-60%) reported to Ni concentrate and was smelted through the Copper Cliff Smelter.In 2013 a capital project, Surface Facility Upgrade (SFU), was implemented to focus on matching the surface plants capacities with the future mine plan to maximize revenues. This was to be achieved by redistributing the metal flow, specifically Cu, through CBM to increase metal unit content through the Smelter. The amount of redistribution of Cu was determined to be based on maintaining a stable Cu to Ni ratio (Cu:Ni) in the Ni concentrate.The change in Cu:Ni ratio in the Ni concentrate would affect the Sudbury divisional flowsheet, and required process changes across the all of the surface plants. The detail that surrounds the flowsheet changes as a whole will not be discussed, but the outcome of the decisions plays a large role in the operational readiness interactions between the mill, its suppliers and its downstream customers."
Citation
APA:
(2018) Using Operational Readiness and Plant Trials to Successfully Implement a Process Flowsheet ChangeMLA: Using Operational Readiness and Plant Trials to Successfully Implement a Process Flowsheet Change. Canadian Institute of Mining, Metallurgy and Petroleum, 2018.