VertiMill« - Development of Circuit Survey and Performance Evaluation Protocols

The Australasian Institute of Mining and Metallurgy
S Palaniandy M Powell MáHilden K Kermanshahi J Allen S Mwansa
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
14
File Size:
2859 KB
Publication Date:
Jul 15, 2013

Abstract

Approximately 420 VertiMills« (VTM) have been installed in mineral processing plants throughout the world, mainly in tertiary and regrind applications plus several in secondary grinding duties. Metso Minerals (Metso) and the Julius Kruttschnitt Mineral Research Centre (JKMRC) have commenced a collaborative research program in stirred milling technology focusing on mill performance evaluation, model development and scale-up methodology. Industrial VTMs are being assessed using a consistent circuit survey protocol to evaluate the performance of VTMs in comminution circuits. The survey protocol includes identification and modification of sampling points, appropriate sampling techniques, controlled circuit stability, and best sample analysis practice. To initiate this study four surveys were conducted in the tertiary grind circuit in the Ridgeway Concentrator at Cadia Valley Operations (CVO) that treats the full circuit throughput of over 800 tph. To deal with the high feed rate the site opted to lead the world in the application of stirred mills by installing the largest VTM, at 3000 hp (2240kW) in closed circuit with a hydrocyclone bank. On average the operating work index was 13.1 kWh/t, reducing the secondary grind product by 40 - 50 ¦m to the required 80 to 100 ¦m range. The applied specific energy is relatively low in these low-intensity stirred media mills at 2.7 kWh/t. The size specific energy was 24.2 kWh/t-75¦m. Based on the survey and operating data the VTM circuit is performing well in this high-throughput tertiary grinding application, producing a sub-100¦m product.CITATION:Palaniandy, S, Powell, M, Hilden, M, Kermanshahi, K, Allen, J and Mwansa, S, 2013. VertiMill« - Development of circuit survey and performance evaluation protocols, in Proceedings MetPlant 2013 , pp 162-175 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation

APA: S Palaniandy M Powell MáHilden K Kermanshahi J Allen S Mwansa  (2013)  VertiMill« - Development of Circuit Survey and Performance Evaluation Protocols

MLA: S Palaniandy M Powell MáHilden K Kermanshahi J Allen S Mwansa VertiMill« - Development of Circuit Survey and Performance Evaluation Protocols. The Australasian Institute of Mining and Metallurgy, 2013.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account