Wallaby - The Horizontally Challenged Opportunity

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
3008 KB
Publication Date:
Jan 1, 2008

Abstract

Barrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the development of the reserves immediately below the pit and is now currently entering a production ramp-up phase for mining of these two initial surfaces below the pit. With increasing gold prices the owner has been forced to re-evaluate the underground project and has decided to investigate the potential of a deep level mine. This deep level underground mine presents a collection of challenges with the most notable being exploitation of a series of well separated near horizontal lodes ranging in thickness from less than 1 to 20 m. A variety of room and pillar mining methods are employed for extraction with careful consideration to resource recovery and pillar design for long-term stability. Compounding these deep level challenges is a need to accelerate mine level development to maintain the production profile of the mine. This paper describes the challenges, key learnings and outcomes of the studies undertaken to date associated with this project.
Citation

APA:  (2008)  Wallaby - The Horizontally Challenged Opportunity

MLA: Wallaby - The Horizontally Challenged Opportunity. The Australasian Institute of Mining and Metallurgy, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account