Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    "Development of a Real-Time Adherence to Mine Plan Tools as Part of an Integrated Remote Mine Control Centre"

    By S D. Dessureault

    In one of North AmericaÆs largest mines, which contains more than six active coal-producing faces, mine controllers must meet the complex challenge of adhering to the mine plan while also ensuring cus

    Sep 26, 2011

  • AUSIMM
    "Geometallurgy – Driving Innovation in the Mining Value Chain"

    "Geometallurgy is a discipline that seeks to improve the sustainability of the extraction of metals and minerals by promoting the smarter use of non-renewable resources, better energy efficiency and g

    Jun 15, 2016

  • AUSIMM
    2001 is Here Now - Teleoperation and Automation of UG Vehicle

    Teleoperation is one method by which an operator can remotely control and monitor a vehicle. The operator monitors the status and progress of the remote vehicle by watching the video transmitted from

    Jan 1, 1998

  • AUSIMM
    2020 Vision ù The Manager of the 21st Century

    By E Hondros

    Innovation and Business Skills Australia (IBSA) commissioned The Boston Consulting Group (BCG) to undertake a study into how the role of AustraliaÆs senior managers is likely to change between now and

    Jan 1, 2006

  • AUSIMM
    21st century relining – the path to greater mine site profitability

    By P Rubie, J Russell

    This paper looks at the past, present and not too distant future of grinding mill relining.Since the adoption of autogenous grinding (AG) mills and semi-autogenous grinding (SAG) mills as the primary

    Aug 29, 2018

  • AUSIMM
    3D Blast Design for Ring Blasting in Underground Mines

    Through partnering with mining customers, DYNO has been able to develop some specific technologies that benefit blasting operations particularly in underground mining. Some of these areas are: 1. Co

    Jan 1, 1995

  • AUSIMM
    A Brief Resume of the Smelting Plant

    THE Company's smelting equipment consists of three blast furnaces, supplied with blast from two sets of vertical piston blowers, each capable of delivering 8000 cub. ft. of air per minute at a pr

    Jan 1, 1918

  • AUSIMM
    A Case History of the Crusher Level Development at Henderson

    By W D. Rech, K W. Keskimaki

    As an integral part of the conversion from rail haulage to conveyor haulage at Henderson, over six kilometres of drifting and several large complex openings were mined. The deepest of these areas was

    Jan 1, 2000

  • AUSIMM
    A comparison of opportunity and risk in deep-sea and terrestrial mining projects

    By I Lipton

    The existence of metalliferous mineral deposits on the deep-sea floor has been known since manganese nodules were discovered in the Arctic Kara Sea in 1868. Modern exploration to define commercially v

    Nov 21, 2018

  • AUSIMM
    A Decade of Gravity Gold Recovery

    By A Bax, G Wardell-Johnson, W P. Staunton, J McGrath, J J. Eksteen

    Since 2001, the AMIRA P420 gold processing technology project series has been studying the recovery of gold using gravity devices, with particular emphasis on the centrifugal units, Knelson and Falcon

    Sep 26, 2013

  • AUSIMM
    A geometallurgical approach towards the correlation between rock type mineralogy and grindability – a case study in the Aitik mine, Sweden

    By R Schmitt, Y Ghorbani, I McElroy, N J. Bolin, M Parian

    Aitik is a large copper porphyry type deposit located in northern Sweden, currently exploited at an annual rate of approximately 45 Mt. The ore’s exceptionally low head grade of 0.25 per cent Cu and v

    Aug 24, 2022

  • AUSIMM
    A Geometallurgical Study of the Witwatersrand Gold Ore at Carletonville, South Africa

    By D L. Reid, G Nwaila, J Petersen, J-P Franzidis, Y Ghorbani, M Becker, F C. de Beer, L C. Bam

    Traditional methods of gold extraction have involved comminution and processing via cyanide leaching, all of which are associated with energy, cost and environmental implications. Subsequently, numero

    Sep 29, 2013

  • AUSIMM
    A Managed Approach to Project Insurance

    Historically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th

    Jan 1, 2007

  • AUSIMM
    A Mining Company for the 21st Century

    I am honoured to be given the opportunity to share with you my thoughts on what will be the essential characteristics of æThe Mining Company for the 21st CenturyÆ. For me the 21st century is all about

    Jan 1, 2000

  • AUSIMM
    A Multibody Simulation Solution to Analyse Attachment Kinematics of Hydraulic Excavators andáOther Linkages

    By M Dietrich

    The paper describes an efficient method for analysing the different attachment kinematics of excavators and other linkages by taking into account digging forces, the workspace and the stability of the

    Sep 26, 2011

  • AUSIMM
    A Non-Technical Perspective to Collecting Consistent and Representative Samples in the Mining Industry

    There are many compelling reasons why correct sampling schemes should be standard practice in the mining industry, yet there are numerous examples where poor sampling practices are known to exist in t

    Mar 1, 2010

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    A Platform for Managing and Analysing Atmospheric Data in Underground Coalmines

    By S J. Schafrik, Z Agioutantis, E C. Jong, K Luxbacher

    Real-time monitoring of mine operating parameters is available at most mines. However, access to these data for an individual operation is typically underutilised by mine managers and technical person

    Nov 4, 2015

  • AUSIMM
    A Practical and Rigorous Approach for Integrating Sustainability Principles into Decision-Making Processes at Minerals Processing Operations

    By D Tuazon, M Powell, M Ziemski, G D. Corder

    Although mining companies have made broad corporate-level commitments to adopt sustainability, there continue to be problems when attempts are made to adopt higher-level sustainability aspirations and

    Jul 10, 2012

  • AUSIMM
    A Practical Approach to Truck Dispatch for Open Pit Mines

    By D M. Silva, J C. Alves

    According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck di

    Sep 26, 2011