Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Trident Underground Gold Mine – The First Three Years
By J Howard
Following discovery in October 2004, commencement of development in February 2007 and first ore production in mid 2007, the Trident gold deposit, located in the Eastern Goldfields of Western Australia
Mar 21, 2011
-
The use of the Main Ramp as a Mine Exhaust at the Kencana Mine, Indonesia
By D J. Brake
Faced with the need to improve workplace conditions in both its development and production headings in its existing K1 orebody, as well as its new K Link and K2 orebodies, the Kencana mine in Indonesi
Mar 21, 2011
-
A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate Perspective
By A E. A Northcote
The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou
Mar 21, 2011
-
Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine
By G B. Smith
Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot
Mar 21, 2011
-
Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine
By J Foster
The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte
Mar 21, 2011
-
Ernest Henry Underground Mine – Access and Support Infrastructure Design
By P Christen
The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in
Mar 21, 2011
-
Development of the Ernest Henry Underground Mine – The Challenges and the Solutions
By T Purvis
Xstrata Copper is extending the Ernest Henry Mine with a 6 Mtpa sub-level cave (SLC) mine being constructed under the pit. The SLC mine will maintain the EHM operation until 2024 after the pit is comp
Mar 21, 2011
-
Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft
By N Herault
PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro
Mar 21, 2011
-
Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons Learnt
By P Marlow
Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su
Mar 21, 2011
-
Implementing and Improving the Mine Plan at the Mt Wright Project
By D MacKay
The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of
Mar 21, 2011
-
Starting-Up the Ernest Henry Underground Mine – Thermal and Occupational Hygiene Challenges
By O van Baalen
The Ernest Henry Mine is a copper-gold open pit operation situated in northwest Queensland, Australia. It is owned and operated by Xstrata Copper, with a current throughput of 11 Mtpa, however, open p
Mar 21, 2011
-
Fine-Tuning Raise Bore Stability Assessments and Risk
By W A. Peck
Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug
Mar 21, 2011
-
How Leadership Can Create an Enduring Safety Culture
By J Ross
The foundation of effective leadership is communication. You can have all the leadership theories, models and training you want, but in the end it is all about leaders talking to, listening to and und
Mar 21, 2011
-
Mine Shafts – Planning, Optimising and Constructing
By D J. Kilkenny
Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq
Mar 21, 2011
-
Ground Support Design and Application for Developing in Pastefill at BHP Billiton – Cannington Mine
By J Li
Cannington Mine has been developing through paste backfilled stopes since the year 2000. These paste drives have been used as either production drill accesses or long-term bypasses. Prior to this stud
Mar 21, 2011
-
Improved Technology – Selection of a Suitable Underground Concrete Transport Vehicle
By S Mitchell
Jetcrete Australia Pty Ltd, shotcrete contractor took the initiative in 2008 to discontinue the use of ‘road registerable’ concrete trucks for all underground works in Australia and internationally.Th
Mar 21, 2011
-
Mining Reconciliation in Long Hole Open Stopes at George Fisher Mine
By J J. Grobler
The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified
Mar 21, 2011
-
Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support
By V Louchnikov
Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th
Mar 21, 2011
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations
By G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011
-
Developing the Ridgeway Deeps Project with an Operations Attitude
By C Jones
Ridgeway Deeps is a block cave (BC) located down dip of the operating Ridgeway sublevel cave (SLC) mine. The BC is located approximately 210 m vertically below the lowest SLC level and approximately 1
Mar 21, 2011