Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Paper No. 171. Some Air Compressor Tests.

    SINCE writing the above-mentioned paper, some further indicator cards have been taken from the No. 1 machine, and the writers believe that a reproduction of these cards will be interesting as illustra

    Jan 1, 1909

  • AUSIMM
    "A Geometallurgical Proxy for Nickel Laterite Heap Leaching"

    By J Li, A McFarlane, J Yu, L L. Kuhar, R Meakin, N Chapman

    "Column leach tests are used frequently to predict recoveries and reagent consumption for nickel laterite heap leaches. These column leaches often run for more than 100 days and therefore require long

    Jun 15, 2016

  • AUSIMM
    Mine Rehabilitation for Sustainable Landcare: Cost-Effective Strategies

    By R Simcock

    Why Rehabilitate? Legislative Requirement Land rehabilitation is a condition of resource consents for mining. Clause 17 (1) of the Resource Management Act 1991 (duty to avoid, remedy, or mitigate adve

    Jan 1, 1997

  • AUSIMM
    Selective Open Pit Gold Mining at Harbour Lights

    Gold mining commenced at Telfer in Western Australia in 1977. Ore mining was carried out by owner equipment and personnel with waste stripping by a contractor. Initial ore reserves were in predominant

    Jan 1, 1986

  • AUSIMM
    The Extraction of Useful Values from Studies

    By Rintoul AH

    Studies of many types and purposes are being carried out constantly by mining, minerals processing and other operating companies. Frequently, the staff requirements and special skills lie outside t

    Jan 1, 1975

  • AUSIMM
    Technical Note - Rapid Production of High Quality Polished Sections for Automated Image Analysis of Minerals

    By Wittenberg J. C, Reid A. F

    A method is described for the rapid and effective production of polished section mounts of ore and mineral particulates to the standards required for automated image analysis. This requires mounting w

    Jan 1, 1984

  • AUSIMM
    Groundwater Search Management In Desert and Arid Terrain - A Case History Telfer, Great Sandy Desert, Western Australia

    During the intial two years (1972 - 1974) of exploration at Telfer, water require- ments were limited to supporting a 50 man camp and diamond drilling to verify thickness and grade of the strataboun

    Jan 1, 1988

  • AUSIMM
    Paper No. 192. The Great Fitzroy Mines Limited. Surface Equipment.

    THE following description of the surface plant of the Great Fitzroy Mines is to be understood as having been compiled by a mechanical engineer, who concerns himself more with the various appliances us

    Jan 1, 1911

  • AUSIMM
    On-Line Particle Sized Analysis of Fine Mineral Slurries

    By Millen M. J, Rainey S, Sowerby B. D

    The control of size reduction in grinding machines and circuits may be enhanced by a continuous and accurate measurement of the particle size of solids in appropriate process streams. This paper pre

    Jan 1, 1997

  • AUSIMM
    A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine

    By M Brockman, M Cowan, A Robeson

    "Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and

    Nov 15, 2016

  • AUSIMM
    Delivery of Effective Plant Shutdowns

    Delivery of effective plant shutdowns is primary to the business success of mining and processing plant operations. This paper sets out a methodology that starts with understanding the business object

    Jan 1, 2004

  • AUSIMM
    Stabilisation of Large Scale Spoil Piles in Deep Open Strip Coal Mines

    By Eckersley J, Boyd G

    A brief review is presented of the mechanisms and causes of spoil pile failures which have occurred at the Goonyella Mine. In particular, the results of a recent geo- technical investigation of the

    Jan 1, 1981

  • AUSIMM
    Comminution of Minerals on a Laboratory-size Choke-fed High-Pressure Roll Mill

    By Gutsche O, Kapur PC

    Experimental data on the production of fines as a function of specific grinding energy consumption show that in general the energy utilisation in a choke fed high-pressure roll mill is higher than i

    Jan 1, 1993

  • AUSIMM
    From Operational to Strategic Management

    Mining companies in Australia have grown in size and complexity over the past 20 years. The same period has seen exten- sive changes in the operating environment, with greater competition and intens

    Jan 1, 1980

  • AUSIMM
    Case Study of Iron Ore Value Chain Optimisation

    By J Foo, T Kleinschmidt, B Reynolds, K Kennewell

    The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the

    Jul 13, 2015

  • AUSIMM
    Applying Risk Management to the Mining Industry

    By Neville WE, Parkinson J

    One of the earliest recorded risk management schemes was implemented by the boatmen of the Yangtze river some 4,000 years ago.. Between them they arranged for shipments to be split up in such a wa

    Jan 1, 1986

  • AUSIMM
    Sampling Practice at Prestea Goldfields Ltd of Ghana

    By Baafi EY, Appiah HK

    The Prestea Goldfields Ltd of Ghana, West Africa has produced over 170 t of gold with average grade of 11 g/t since 1912. The deposits occur in a wide shear zone which closely follow the Birimian-Tark

    Jan 1, 1976

  • AUSIMM
    A Practical Trial to Increase the Coal Recovery in Highwall Auger Mining in Australia

    By T Ueda an, T Sasaoka, A Yabuki, H Shimada

    The basic concept of auger mining is to extract coal beyond the economic limits of surface mining technology by drilling holes of an appropriate diameter size into the exposed seam of the highwall as

    Jan 1, 2003

  • AUSIMM
    The Geology Of The fitzpatrick Area North Broken Hill Limited, Broken Hill, NSW

    In August, 1975, North Broken Hill Limited announced that an intersection of 37.3 m of high grade lead-silver-zinc mineralisation, assaying 26.2 per cent Pb, 495 g/tonne Ag and 21.2 per cent Zn ha

    Jan 1, 1983

  • AUSIMM
    Blair Anthol Coal Mine Project a Case History in Planning and Management

    By Maxwell HW

    Pacific Coal Pty Limited (a wholly owned subsidiary of CRA Limited) managed the interests of six members of a joint venture formed to mine and export eight million tonnes of export quality steamin

    Jan 1, 1986