Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Better Ideas-Brighter Future

    By Hedley TP

    Success for underground coal mine operators in the 1990's and beyond will be dependent upon better understanding of the dynamics of their operating environment, and extension of emerging tech

    Jan 1, 1987

  • AUSIMM
    Systems and Protocols of Geological Information Management at Telfer Gold Mine, Western Australia

    By G R. Howard, G Back

    Management of information systems for data collection is essential to maintain data integrity and continuity, and manage loss control on a large world-class mine such as Telfer Gold Mine. This paper a

    Jan 1, 2000

  • AUSIMM
    Reconciliation Towards an Ideal Process

    Information obtained from a reconciliation system provides fundamental indicators to an operations performance and is often neglected as a key performance indicator when developing a business plan or

    Jan 1, 2002

  • AUSIMM
    Drilling and Blasting Cost Estimation

    Drilling and blasting are an essential part of most mining operations, and are commonly major operating cost centres. The effectiveness of blasting can have a significant influence on all subsequent

    Jan 1, 1990

  • AUSIMM
    Closure Liabilities – Where Are We at?

    By M Slight, H Lacy

    In recent times, with the global mining industry’s focus on sustainable development there has been a significant focus on mine closure and rehabilitation performance and reporting through the developm

    Jun 28, 2016

  • AUSIMM
    University Mining Education

    Mining education has received almost continuous discussion since its inception and most people engaged in the mining industry and in mining education feel at some time the urge and necessity to expres

    Jan 1, 1959

  • AUSIMM
    Project Sustainability Assessment - Matching Method to Enterprise Size

    Project Sustainability Assessment - Matching Method to Enterprise Size Sustainable development requires managing natural resources, including minerals, in a way that is conducive to long-term wealth

    Sep 13, 2010

  • AUSIMM
    Mining Heritage

    It is extraordinary that while Australia depends heavily on mineral wealth for its economic well-being, most Australians have no appreciation of the traditions and principles which drive and govern th

    Jan 1, 1993

  • AUSIMM
    The Corex Process Hot Metal Production by Coal Reduction

    By Kepplinger W

    The COREX process is a technology for production of liquid hot metal on the basis of coal (without the use of a coking plant) developing by VOEST- ALPINE AG, Austria and its subsidiary company Kor

    Jan 1, 1987

  • AUSIMM
    A New Design of Pulp Lifter for Grate Discharge Mills

    By Morrell S

    As more and more autogenous and semi-autogenous mills are run in closed circuit with cyclones the limitations that can be imposed by poor grate and pulp lifter design are becoming increasingly appar

    Jan 1, 1997

  • AUSIMM
    Simulation of Grinding and Mineral Liberation Processes in Industrial Circuits: A Non-Linear Model

    A universal grinding circuit model suitable for an arbitrary structure of flowsheet has been suggested. In this model classifiers and mills are described in a most general form. What puts the model

    Jan 1, 1993

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    Application of SLon Magnetic Separators in Modernising the An Shan Oxidised Iron Ore Processing Industry

    The An Shan iron ore deposit is the biggest low-grade oxidised iron deposit in China. Over the past ten years, about 120 SLon verticalring-pulsating high gradient magnetic separators units have been i

    Jan 1, 2009

  • AUSIMM
    Blast Movement Modelling and Measurement

    By D Thornton

    Geologists use large data sets and spend many hours and much computing time modelling the distribution of minerals throughout a rock mass. Significant investments in drilling, assaying and quality ass

    Sep 26, 2011

  • AUSIMM
    The Role of On-Line Analysis and Control in Sustainable Minerals Processing

    By B D. Sowerby, N G. Cutmore

    Improved process control can be achieved through the accurate and reliable on-line measurement of critical process parameters in real time. Over the past few decades on-line analysis techniques have b

    Jan 1, 2002

  • AUSIMM
    Lead-Smelting Practice at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    By Hughes J. C

    THE smelting plant consists of five large furnaces operating in the treatment of current flintered material, and one small furnace operating periodically in the treatment of copper dross and antimonia

    Jan 1, 1922

  • AUSIMM
    An Integrated Neural Network and Machine Learning Model for Multi-Dimensional Mineral Resource Assessment

    The potential of the developed multi-dimensional analysis system to assist interpretation from large data sets through derived digital mapping models is presented accompanied by preliminary results.

    Jan 1, 1995

  • AUSIMM
    Air Flow and Respirable Dust Distribution on Longwall Faces

    By Liu Y

    Ventilation, air leakage, and various cutting, loading and support movement operations all have a role in dust distribution on longwall faces as shown by the results of a large number of dust measurem

    Jan 1, 1995

  • AUSIMM
    Determination of the Sampling Liberation Diameter in a High-Grade Coarse Gold Ore by High-Resolution X-ray Computed Tomography

    By I M. Platten, Y Xie, R-M F. Bell, S C. Dominy, L E. Howard, R C. A Minnitt

    For any resource evaluation program, the collection and processing of representative samples for assaying is critical. Sampling, sample preparation and assay protocols must be designed to suit the sty

    Aug 21, 2012

  • AUSIMM
    Development Practice and Ground Support Installation at Northparkes E26 Mine

    The Northparkes E26 Mine is AustraliaÆs first block cave mine. This paper presents an outline of the design and construction philosophies that drove the project development and details the excavation,

    Jan 1, 1999