Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Developing a TSF design concept – experience helps but numbers don’t lie

    By L D. Munro, S A. Jackson

    This paper provides a logical approach to developing a TSF design concept through: • Identifying key properties of tailings and containment structures; • Reviewing underlying principles for effective

    Jul 1, 2021

  • AUSIMM
    Tungsten-Carbide Drilling Investigations at Morning Star (G.M.A.) Mines N.L.

    By Clarke P. E

    At the end of the recent war, reports became available from Europe of the use of tungsten-carbide inserts in percussion rockdrill bits. These bits were used with small size rockdrills, so that the onl

    Jan 1, 1950

  • AUSIMM
    Mount Isa Cut and Fill (MICAF) Stoping

    ABSTRACTMechanised cut and fill stoping in the Racecourse orebodies between II and 9 levels was started in 1964.Five stopes are in progress over the two level interval, extracting the full strike leng

    Jan 1, 1968

  • AUSIMM
    Economic Evaluation - It is Time we Cleaned-Out and Smartened-Up our Discipline

    Completion of a project requires two separate money-focused activities, namely economic evaluation of the cash flows underlying the project (before financing) and if the economics look promising, how

    Jan 1, 2009

  • AUSIMM
    Filtered tailings – an iron ore experience

    By L Vimercati, R Williams

    Transitioning to a green future requires the mining industry to adopt sustainable practices. Filtered tailings are become a key expectation of the communities we operate in and are growing in a number

    Sep 18, 2023

  • AUSIMM
    Current Mining Practice At Cleveland Mine Of Abminco N. L.

    The Cleveland Mine has an annual ore production of 400,000 tonnes at a grade of 0.79 per cent tin and 0.30 per cent copper. It is achieved by an open stoping method, mechanised overhead sub-level b

    Jan 1, 1977

  • AUSIMM
    Direct Estimation of Sampling Variance From Time Series Measurements ù Comparison to Variographic Analysis

    By M Paakkunainen

    Sampling is often the most critical part in process analysis. When the mean of a continuous lot, such as a process stream within a given time interval, is estimated by calculating the mean of several

    Jan 1, 2005

  • AUSIMM
    Magnesia from Magnesite by Calcination/Carbonic Acid Leaching: Solubility of Magnesium and Iron

    By Moorrees C, Everson P

    A detailed examination of carbonic acid leaching of crude iron-containing magnesia derived from Savage River magnesite shows that the rate and extent of magnesium and iron dissolution are affected by

    Jan 1, 1983

  • AUSIMM
    Separation Of Magnetic Minerals By A Linear Motor Device (550d76f3-26bc-4160-b0b2-e11bb8a40ec4)

    By Grader F. E

    A linear motor properly wound can serve as a mechanism for separating paramagnetic sulphide minerals, like pyrrhotite, from other sulphides and associated gangue minerals. The effective- ness of se

    Jan 1, 1980

  • AUSIMM
    Gas reservoir and emission modelling to evaluate gas drainage to control tailgate gas concentration and fugitive emissions

    By D J. Black

    The process of longwall coal extraction coal causes fractures in the overlying and underlying strata and these fractures become pathways for gas released from adjacent coal seams to flow into the mine

    Aug 28, 2017

  • AUSIMM
    Design of Paste Backfill Plant and Distribution System for the Cannington Project

    Safety bulletins and stickers issued for the paste backfill plant at Cannington read as follows: æCannington Paste Fill Plant, First of ItÆs Kind in AustraliaÆ. We could even dare to state that the Ca

    Jan 1, 1998

  • AUSIMM
    Effect of Dynamic Loading and Tunnel Support in Deep Level Mines

    By K Le Bron

    Fatalities that occurred because of rock falls in off-reef excavations (excluding shafts) over the last three years range between ten per cent and 20 per cent of the total number of fatalities that ha

    Jan 1, 1999

  • AUSIMM
    Managing Environmental Impact Assessments of Heavy Mineral Projects in Africa ù Potential Pitfalls and Proactive Planning

    Determining the environmental consequences of green field projects is becoming an increasingly important component of new projects. Feasibility studies are regarded by potential investors as incomplet

    Jan 1, 2001

  • AUSIMM
    Understanding Ore Characteristics and Equipment Selection

    By K T. Broekman, R L. Koenig

    "The Braemar Iron Formation is atypical ore when compared to the current magnetite ores being processed. In attempting to process and economically recover the vast quantities of iron ore stored within

    Aug 12, 2013

  • AUSIMM
    The Role of the Exploration Geologist in the Initial Establishment of Harmonious Landowner Relations

    Two events during the past decade have combined to effectively alter the role of the geologist working in Papua New Guinea. The gold boom of the 1980s resulted in a substantial increase in the gen

    Jan 1, 1991

  • AUSIMM
    Wellington Gold (A Brief Review of the Gold Mining History of the Wellington District, New Zealand)

    Alluvial gold was found in the Terawhiti area, West of Wellington, in the 1850s. This led to the discovery of reef gold. Periods of minor 'gold fever', company flotations, and mining activit

    Jan 1, 1993

  • AUSIMM
    Rediscovery and Development of the Kambalda-St Ives Gold Deposits

    By Gresham J. J

    The rapid and successful development by Western Mining Corporation Limited (WMC) of a gold mining industry based on the deposits of the Kambalda-St Ives group, was the final chapter in a story that

    Jan 1, 1991

  • AUSIMM
    Digital mapping for rock mass discontinuities – opportunities and challenges

    By J Leem, S Mehrishal, J Kim, A Fereshtenejad, J Song

    Rock mass discontinuity mapping plays a crucial role in developing a reliable Discrete Fracture Network (DFN), providing insights into the distribution of geometrical and mechanical properties of disc

    Sep 1, 2024

  • AUSIMM
    Minimising Mineral Project Risk - New Zealand in a Global Context

    Mining ventures are essentially risky businesses. Explorers and project developers (plus their investors and financiers) attempt to minimise the risks involved or at least manage them. Core considerat

    Jan 1, 2005

  • AUSIMM
    Building better bow-ties – common pitfalls in risk analysis

    By B Beale

    Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective

    Apr 16, 2024