Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Double Drum Separator for Triboelectric Separation of Very Fine Materials

    By K Schonert, K Eichas

    Electrostatic separation of non-conductive materials can be accomplished by triboelectric charging. The efficiency of convential separators becomes worse in the size range below about 100 ¦m. These

    Jan 1, 1993

  • AUSIMM
    Quartz Vein Styles in Turbidite-hosted Mesothermal Gold Deposits of Western South Island (New Zealand), Victoria (Australia) and Nova Scotia (Canada)

    By P K. Smith, R J. Ryan, W R. H Ramsay, D C. Arne, F P. Bierlein

    Turbidite-hosted, mesothermal lode gold deposits in Paleozoic metasedimentary rocks of the Buller Terrane, western South Island have a similar geological history and genesis to the Paleozoic lode gold

    Jan 1, 1999

  • AUSIMM
    Development of an Aquatic Habitat and Water Resource in Closing Out the Enterprise Pit

    By Fawcett M

    Pine Creek Goldfields Limited (PCG) is rehabilitating the Enterprise Pit to an aquatic habitat and potential water resource. This paper discusses the development and implementation of that plan. Pin

    Jan 1, 1994

  • AUSIMM
    State-of-the-Art in Monitoring Respirable Mine Aerosols

    By E E. Hall, S, E D. Thimons, R J. Timko

    The heart of mine ventilation science and technology is the protection of the life and health of the miner. Lung diseases that result from overexposure to various mine aerosols can largely be prevente

    Jan 1, 2005

  • AUSIMM
    Coal Mine Ventilation and the Law

    By M Parcell

    "Ventilation risks in an underground mine have essentially remained the same for centuries, yet theevidence suggests that there are many coal mines that have failed to adequately control these risks.T

    Jun 1, 2012

  • AUSIMM
    Preparing Effective Specifications for Occupational Health and Environmental Noise Objectives in Mining Project Design and Delivery

    By C Tickell

    Achieving occupational health and environmental noise objectives is a major consideration in the planning or operational phase of resource development and industrial projects to meet the needs of the

    May 9, 2016

  • AUSIMM
    Where New Zealand Fits Internationally

    New Zealand depends on foreign investment for economic development. This also applies to the development of New Zealand's mineral resources. For this foreign investment to happen there must be so

    Jan 1, 2000

  • AUSIMM
    Cutter Mining – Crossover Technology from Civil Engineering to Mining

    By S K. Schwank

    Trench cutter systems have been used in civil engineering for the least 30 years for the installation of deep cut-off walls, retaining walls and foundation systems. The systems are constantly advanced

    Nov 4, 2015

  • AUSIMM
    Flotation Optimisation Studies of the Perilya Broken Hill Lead Circuit

    By B Kilgariff

    Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at

    Jan 1, 2005

  • AUSIMM
    The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR

    By A Hoyle, P Walker, D Bennett

    The Phu Kham copper-gold operation located in Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited, based in Brisbane Australia, holds a 90 per cent

    Sep 7, 2015

  • AUSIMM
    Shifting the comminution workload from the primary ball mill to TowerMill circuit

    By H Ishikawa, R Halomoan, S Palaniandy

    The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,

    Aug 29, 2018

  • AUSIMM
    Impact of Mining on the Lower Ngakawau River

    By M Pizey, M Kingsbury

    Since 1950 Stockton Open Cast Mine has excavated over 60 million tonnes of Brunner Coal Measures overburden sandstones and mudstones. The current operator, Solid Energy New Zealand, recognises that ac

    Jan 1, 2003

  • AUSIMM
    Plant Design for Closure

    By D P. Murphy, R F. Dewhirst

    Traditionally closure has been seen by the Resource sector solely as a green or an environmental issue, focused primarily on the requirement to rehabilitate the site following cessation of production

    Jan 1, 2006

  • AUSIMM
    Australian Iron & Steel Pty Ltd Experience with Ladle Injection

    A pilot steel ladle injection facility designed to assist in the production of high quality steels suitable for use in pipelines has been built and commissioned at the Basic Oxygen Steelmaking (BOS) p

    Jan 1, 1983

  • AUSIMM
    The QSL Lead Process

    The QSL continuous lead smelting process incorporates two basically different pyro- metallurgical operations: roast-reaction, smelting of galena concentrate, followed by carbothermic reduction of s

    Jan 1, 1984

  • AUSIMM
    Geochemical Prospecting of the Bureau of Mineral Resources

    Geochemical projects in progress or recently completed in the Bureau of Mineral Resources, Geology, and Geophysics (BMR) cover a wide range of topics and include research projects, regional studies, a

    Jan 1, 1970

  • AUSIMM
    Simulation for Dependable Mining Automation

    A discussion on simulation tools to aid the development of robotics platforms is presented. The focus of the work is towards mining robotics platforms where operations are typically in unstructured, u

    Dec 6, 2010

  • AUSIMM
    Reducing the Effect of Wind on Airblast Measurement During Blasting

    By K Henley

    One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic

    Aug 24, 2015

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Managing Mining Contracts

    Contractors have penetrated all areas of the Australian mining industry over the last 15 years. The process started in the WA gold and nickel mines and has since spread around the nation to iron ore,

    Jan 1, 1998