Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Real time assessment of water content in icy regolith by analysing drilling parameters

    By D Joshi, J Rostami, M Karakus, A Eustes

    The first target of mining activities on the surface of the moon is to find and extract water from the icy regolith on the moon. A test drilling unit was designed and fabricated under a NASA Early Sta

    Sep 1, 2024

  • AUSIMM
    The Future of Petrochemicals in Australia

    Truly launched during the 1939-45 war, b¬,osted since by huge increases in demand for food, shelter and manufactures of ill kinds, petrochemicals have rocketed into prominence' all'oVer&apos

    Jan 1, 1962

  • AUSIMM
    O and C Isotope Study of Bastnäs-type Rare Earth Element Mineralisation, Bergslagen, Sweden

    By F Sahlström, E M. Jolis, V R Troll, E Jonsson, K Högdahl, C Harris

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Bastnäs-type magnetite-skarn-hosted rare earth element (REE) mineralisations are locate

    Mar 18, 2015

  • AUSIMM
    Macraes Gold Mine - Continuous Improvement of a Refractory Gold Treatment Plant

    By S R. La Brooy, T Giraudo, I C. Ritchie

    The treatment plant at the Macraes Gold Project in New Zealand processes a carbonaceous, refractory sulphide gold ore. Since its commissioning in 1990, there has been a programme of continuous improve

    Jan 1, 1998

  • AUSIMM
    Determination of the handleability index of adhesive bulk materials

    By M Carr, K Williams, W Chen, J Plinke

    The depletion of iron ore deposits at the face of the mine site dictates the necessity for the exploitation of formerly less attractive orebodies to meet the demand of the modern world. These orebodie

    Jul 24, 2017

  • AUSIMM
    Electrochemical Behaviour of Massive Chaclopyrite Bioleached Electrodes in Presence of Acidithiobacillus ferrooxidans and Acidithiobacillus caldus

    Electrochemical Behaviour of Massive Chaclopyrite Bioleached Electrodes in Presence of Acidithiobacillus ferrooxidans and Acidithiobacillus caldus In this work, the monitoring of bacterial and chemic

    Sep 13, 2010

  • AUSIMM
    Reoxidation of Al-killed ultra-low C steel by FetO in CaO-Al2O3-MgOsat.- FetO slag representing RH slag by experiment and kinetic modelling

    By Y-B Kang, W-Y Cha, Y-M Cho

    Molten slag used in the secondary refining process (RH process) for the production of Ultra-Low C (ULC) steel is typically composed of CaO-Al2O3-MgOsat.-FetO with minor constituents. FetO in the RH sl

    Jun 19, 2024

  • AUSIMM
    Study on Ball Mill Grinding of a Cassiterite-Polymetallic Sulfide Ore

    Study on Ball Mill Grinding of a Cassiterite-Polymetallic Sulfide Ore

    Sep 13, 2010

  • AUSIMM
    Revegetation Of Mine Wastes And Disturbed Areas In An Arid Environment

    By Trudinger J. P

    Concern for the environment by the public and by mining companies, has led to many recent attempts to revegetate areas disturbed by mining activities. The problem of successfully revegetating dist

    Jan 1, 1976

  • AUSIMM
    Central Refrigeration Plants in German

    German coal mining suffers from rock temperatures up to 600C which are the same as in South Africa at 3000 - 4000 m of depth. Therefore cooling plants have increased in the last decade and today a

    Jan 1, 1983

  • AUSIMM
    Effect of Clay Rheology on Flotation of a Refractory Gold Ore

    By L Basnayaka, N Subasinghe, B Albijanic

    "It has been recognised that the presence of clay minerals in ores adversely affect flotation performance. In this study, changes in rheological properties of the flotation pulps under normal operatin

    Oct 10, 2016

  • AUSIMM
    West Works-Mount Morgan Chlorination

    THE treatment by chlorination of the Mount Morgan Gold Mining Company's ores was first accomplished, early in 1886, by a works having a capacity of 25,000 tons per annum. Shortly afterwards anoth

    Jan 1, 1910

  • AUSIMM
    Cementation of Copper with Zinc from Dilute Aqueous Solutions

    A rotating disc geometry was used to provide a uniformly accessible surface for a kinetic study of copper cementation with zinc in sulphate solution. For copper concentrations of the order of 10 p.p.m

    Jan 1, 1970

  • AUSIMM
    A Computer Based Ore Reserve System-Its Achievements and Potential

    The Ore Reserve System implemented at Mount Isa for Mount Isa Mines Limited is a comprehensive' computer system designed to process assay, geological, structural and survey data for Isa and Hi

    Jan 1, 1974

  • AUSIMM
    Managing the Impact of Environmental Law on Major Resource Development Projects

    Ensuring the success of a major resource development project, whether in the Gippsland Basin or elsewhere, is typically both a complex and costly process. It is therefore imperative from the point o

    Jan 1, 1992

  • AUSIMM
    Evolution of Subaerial Magmatic-Hydrothermal Systems: A Comparative Study Between Koryu Au-Ag Deposit and Toyoha Polymetallic Deposit at Sapporo-Iwanai District, Hokkaido, Japan

    Sapporo-Iwanai district is located at the intersection of the northeast Japan arc and Kuril arc, associated with the subduction zone. This area is characterized by Miocene submarine volcanism followed

    Jan 1, 2005

  • AUSIMM
    A Real-Time GPS kinematic-Positioning System for Automatic Mining Vehicle Guidance

    By Kubik K

    Recent significant advances in the Global Positioning System (GPS) have contributed to making real-time kinematic/dynamic process for decimetre to centimetre-level positioning more reliable and read

    Jan 1, 1997

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011

  • AUSIMM
    Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes

    By M Lovitt, T Hewitt

    The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside

    Jan 1, 2005

  • AUSIMM
    Company Growth û Its Implications for Personnel Management and the Community

    By Jury C. G

    A decade of expansion and high production targets have led to changes in the number and structure of the Mount Isa Mines Limited work- force. Falls in labour turnover and absenteeism are correlated

    Jan 1, 1974