Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Continuing Evolution of Gas Drainage in AustraliaBy E Yurakov, D J. Ashelford, M I. Slate
The push for increasing coal production rates continues to place increasing demands on mine management to safely and effectively control seam gas. Gas drainage strategies applied vary in both effectiv
Jan 1, 2005
-
Migration of Gold During BoringThe following data cover a phase in the systematic testing of gold deposits which does not appear to have been specificalIy investigated.In boring either secondary or primary deposits, gold, by virtue
Jan 1, 1950
-
Latest fifth generation (Mk V) gyratory crushers with focus on safety and maintenance featuresBy W Malone, J Garrett
FLSmidth (FLS) has spent the last 15 years, working with customers and engineering houses to deliver innovative improvements in crusher safety, coupled with the latest, maintenance friendly, crusher d
Sep 18, 2023
-
Fire Modelling in Underground Mines using Ventsim Visual VentFIRE SoftwareBy D J. Brake
The risk from fire remains one of the most serious of underground mine disaster scenarios. The impacts of mine fires on the underground ventilation system and the production of toxic gases have been d
Jul 1, 2013
-
Accelerated degradation and modified slake durability testing of clay mineral-rich coal mine spoilBy B Miles, D J. Williams, J Ahn, T A. Vangsness
The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act
Jul 23, 2018
-
Improving Drive Stability through Efficient Development Blasting Design and PracticesBy P Klaric
Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th
Aug 24, 2015
-
A case study in managing a high consequence geotechnical risk in a Queensland coalmineBy K Young, M Martin, D Payne
This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor
Nov 29, 2022
-
Solomon Iron Deposits – Continued Growth and DevelopmentBy C Simpson
In 2011 the forecasted world demand for iron ore continues to grow, and during this time Australia is looked upon as a reliable supplier of high quality ore. The expansion of the current Australian mi
Jul 11, 2011
-
Starting-Up the Ernest Henry Underground Mine – Thermal and Occupational Hygiene ChallengesBy O van Baalen
The Ernest Henry Mine is a copper-gold open pit operation situated in northwest Queensland, Australia. It is owned and operated by Xstrata Copper, with a current throughput of 11 Mtpa, however, open p
Mar 21, 2011
-
Improved Cleaner Circuit Design for Better Performance Using the Jameson CellBy R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro
In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily
Sep 1, 2014
-
The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold MinesBy D Hillier, A Giblett, K Parker, V Ramsell
Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo
Oct 29, 2012
-
The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term PlanningBy T Berryman, C Adams, L Griesel, C Buxton
The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g
Aug 18, 2014
-
How to Manage Machine Duty to Sustain High Production RatesBy P Meehan, R McAree, Z Guan
Equipment maintenance is 30 - 50 per cent of the operating costs for a typical mining company. While this is substantial, its importance is beyond its significance as a cost heading. Modern mining req
Jan 1, 2002
-
Safety impact of increased shaft ventilation on rope guided conveyancesBy R S. Hamilton, S R. Grobler, M E. Greenway
The progressive development of underground mines frequently requires increased ventilation flow rates through mine shafts that were originally designed for lower rates. Where these shafts are equipped
Aug 28, 2017
-
Modelling and Analysis of Dimensionless Variables in Air-Sparged Hydrocyclone (ASH) Flotation for Fine Coal CleaningBy Miller JD, Ye Y
The Air-Sparged Hydrocyclone (ASH) has been developed for the fast and efficient flotation of fine mineral particles in a centrifugal field during the past decade at the University of Utah. Over the
Jan 1, 1993
-
Heat Load Estimation from Conveyor Systems in Mass MinesBy R Moreby, J Kok, L van den Berg
The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems
Aug 31, 2015
-
A Capitals Based Approach – Leading Innovation in Planning for Life-of-Mine SustainabilityBy L Dyer, A Keith, G D. Corder
As mining activity moves to remote and less developed locations globally, a holistic approach to mine development is fundamental for achieving a balance between strong financial returns and corporate
Jul 16, 2014
-
Through Seam Blasting – Leighton Wahana ExperienceBy S Agdaca
Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500
Nov 8, 2011
-
Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio storyBy J P. Evert
Didipio gold-copper mine operation is situated in the island of Luzon, approximately 270 km north of Manila in the Philippines, in an area of high seasonal rainfall. The hydrogeological water flow mod
Mar 29, 2023
-
Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat BasinsBy R Strand, L Reading, G Keir
A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart
Nov 26, 2013