  • AUSIMM
    The Continuing Evolution of Gas Drainage in Australia

    By E Yurakov, D J. Ashelford, M I. Slate

    The push for increasing coal production rates continues to place increasing demands on mine management to safely and effectively control seam gas. Gas drainage strategies applied vary in both effectiv

    Jan 1, 2005

  • AUSIMM
    Migration of Gold During Boring

    The following data cover a phase in the systematic testing of gold deposits which does not appear to have been specificalIy investigated.In boring either secondary or primary deposits, gold, by virtue

    Jan 1, 1950

  • AUSIMM
    Latest fifth generation (Mk V) gyratory crushers with focus on safety and maintenance features

    By W Malone, J Garrett

    FLSmidth (FLS) has spent the last 15 years, working with customers and engineering houses to deliver innovative improvements in crusher safety, coupled with the latest, maintenance friendly, crusher d

    Sep 18, 2023

  • AUSIMM
    Fire Modelling in Underground Mines using Ventsim Visual VentFIRE Software

    By D J. Brake

    The risk from fire remains one of the most serious of underground mine disaster scenarios. The impacts of mine fires on the underground ventilation system and the production of toxic gases have been d

    Jul 1, 2013

  • AUSIMM
    Accelerated degradation and modified slake durability testing of clay mineral-rich coal mine spoil

    By B Miles, D J. Williams, J Ahn, T A. Vangsness

    The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act

    Jul 23, 2018

  • AUSIMM
    Improving Drive Stability through Efficient Development Blasting Design and Practices

    By P Klaric

    Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th

    Aug 24, 2015

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    Solomon Iron Deposits – Continued Growth and Development

    By C Simpson

    In 2011 the forecasted world demand for iron ore continues to grow, and during this time Australia is looked upon as a reliable supplier of high quality ore. The expansion of the current Australian mi

    Jul 11, 2011

  • AUSIMM
    Starting-Up the Ernest Henry Underground Mine – Thermal and Occupational Hygiene Challenges

    By O van Baalen

    The Ernest Henry Mine is a copper-gold open pit operation situated in northwest Queensland, Australia. It is owned and operated by Xstrata Copper, with a current throughput of 11 Mtpa, however, open p

    Mar 21, 2011

  • AUSIMM
    Improved Cleaner Circuit Design for Better Performance Using the Jameson Cell

    By R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro

    In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily

    Sep 1, 2014

  • AUSIMM
    The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold Mines

    By D Hillier, A Giblett, K Parker, V Ramsell

    Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo

    Oct 29, 2012

  • AUSIMM
    The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning

    By T Berryman, C Adams, L Griesel, C Buxton

    The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g

    Aug 18, 2014

  • AUSIMM
    How to Manage Machine Duty to Sustain High Production Rates

    By P Meehan, R McAree, Z Guan

    Equipment maintenance is 30 - 50 per cent of the operating costs for a typical mining company. While this is substantial, its importance is beyond its significance as a cost heading. Modern mining req

    Jan 1, 2002

  • AUSIMM
    Safety impact of increased shaft ventilation on rope guided conveyances

    By R S. Hamilton, S R. Grobler, M E. Greenway

    The progressive development of underground mines frequently requires increased ventilation flow rates through mine shafts that were originally designed for lower rates. Where these shafts are equipped

    Aug 28, 2017

  • AUSIMM
    Modelling and Analysis of Dimensionless Variables in Air-Sparged Hydrocyclone (ASH) Flotation for Fine Coal Cleaning

    By Miller JD, Ye Y

    The Air-Sparged Hydrocyclone (ASH) has been developed for the fast and efficient flotation of fine mineral particles in a centrifugal field during the past decade at the University of Utah. Over the

    Jan 1, 1993

  • AUSIMM
    Heat Load Estimation from Conveyor Systems in Mass Mines

    By R Moreby, J Kok, L van den Berg

    The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems

    Aug 31, 2015

  • AUSIMM
    A Capitals Based Approach – Leading Innovation in Planning for Life-of-Mine Sustainability

    By L Dyer, A Keith, G D. Corder

    As mining activity moves to remote and less developed locations globally, a holistic approach to mine development is fundamental for achieving a balance between strong financial returns and corporate

    Jul 16, 2014

  • AUSIMM
    Through Seam Blasting – Leighton Wahana Experience

    By S Agdaca

    Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500&#16

    Nov 8, 2011

  • AUSIMM
    Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio story

    By J P. Evert

    Didipio gold-copper mine operation is situated in the island of Luzon, approximately 270 km north of Manila in the Philippines, in an area of high seasonal rainfall. The hydrogeological water flow mod

    Mar 29, 2023

  • AUSIMM
    Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat Basins

    By R Strand, L Reading, G Keir

    A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart

    Nov 26, 2013