Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Some Metallurgical and Engineering Aspects of the Rum Jungle Water Treatment Plant

    The reasons for including treatment of water in Whites and Intermediate open cuts in the overall rehabilitation strategy are given in the introduction. The target quality of the treated water also

    Jan 1, 1984

  • AUSIMM
    Flotation Reagents ù A Critical Overview From an Industry Perspective

    By S A. Ravishankar

    An overview of flotation reagents used in sulfide and non-sulfide separations, from an industrial perspective, is given in this presentation to highlight the current applications knowledge. The histor

    Jan 1, 2005

  • AUSIMM
    Electrolytic Chlorine at Mount Morgan, Queensland

    As the Mount Morgan electrolytic chlorine plant is the first of its kind installed in Australia, and as the details of this method of producing chlorine have, up to the present time, been kept more or

    Jan 1, 1911

  • AUSIMM
    Reflections of a Mine Scheduler

    Scheduling mine development and underground construction has been the bane of most mine managersÆ lives at one time or another. Even though scheduling software has developed significantly over the las

    Jan 1, 2000

  • AUSIMM
    Copper Concentrator Practice at Mount Isa Mines Limited, Mount Isa, Qld

    By Hare S. M, Griffin P. T, O&apos

    Chalcopyrite ore and converter slag treatment to produce copper concentrates is undertaken at the Copper Concentrator of Mount Isa Mines Limited. This concentrator was commissioned in May 1973, replac

    Jan 1, 1993

  • AUSIMM
    Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997 (b215405e-1e90-4b21-837b-f227a5480b5d)

    By Greenwood AG

    Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include

    Jan 1, 1998

  • AUSIMM
    An Investigation of Ammonium Nitrate Loss to Mine Discharge Water at Diavik Diamond Mines

    By G MacDonald, B Forsyth, D Corkery, T

    An investigation was carried out at Diavik Diamond Mines Inc (DDMI) to identify and quantify the mechanisms through which ammonium nitrate (AN) was entering the mine discharge water. The goal was to d

    Jan 1, 2007

  • AUSIMM
    Novel Flotation Technique for Carbonate Mineral Flotation

    By H El-Shall, R Stana a

    An innovative process for the separation of carbonaceous minerals from bulk ores is presented. In this process, the surface of carbonate minerals is reacted with acid used to nucleate CO2 bubbles at t

    Jan 1, 2005

  • AUSIMM
    Methane-INFO - Graphical, Three-Dimensional Planning and Information System for the Simulation and Prediction of the Methane Emission of Mine Design

    By Ruschitzka C

    The productivity and economic success of a German hard coal mine is attributed to the high productivity of a small number of operation points; however high rates of production are associated with in

    Jan 1, 1995

  • AUSIMM
    Prospects for Alternative Leaching System for Gold: A Review

    A survey of leaching systems for the dissolution of gold has been undertaken and their advantages and disadvantages evaluated both from their effectiveness at leaching and their compatibility with c

    Jan 1, 1982

  • AUSIMM
    Telfer Underground - A Difficult Mine and the Associated Problems

    Teller Underground Mine was established to extract ore from the Middle Vale Reef located on the eastern flank of Telfer Main Dome.The mine is located below a 150 m deep open pit operation. The ore bod

    Jan 1, 1993

  • AUSIMM
    A Mine Planning Model to Satisfy Long-Term Grade Targets

    By M Rimes

    This paper describes a technique to predict achievable head grades and likely variances from target grade for the Shovelanna Iron Ore Project, in the Pilbara region of Western Australia. The block mod

    Jan 1, 2007

  • AUSIMM
    Restoring the Site - L&M Mining Limited - Waikaka Alluvial Gold Mining Project, Southland

    By D Manhire, G Hogan, M Ryan, S Whiteley

    Site restoration at the L&M Mining Limited alluvial gold mining project at Waikaka near Gore, Southland is described. In 2000 mining operations started to recover alluvial gold beneath historical

    Jan 1, 2003

  • AUSIMM
    The Application of the Environmental Assessment Prodedures to Licensing for Minerals, Petroleum and Geothermal Energy

    By Thorburn D

    This paper reviews the history of environmental assessment in New Zealand with reference to mineral developments. Emphasis is given to larger more controversial projects particularly metal mines. The

    Jan 1, 1990

  • AUSIMM
    Kinetics and Mechanism of Zircon Chlorination

    By Glastonbury J. R

    The kinetics of the direct chlorination of, zircon in the presence of carbon was studied at temperatures between 9000C and 12000 C. From the experimental data it is prop- osed that the most likely me

    Jan 1, 1973

  • AUSIMM
    A Case Study Of Reserves Estimation For A Strip Coal Mine

    Utah Development Company began prospecting for coking coal in 1961 and Blackwater Mine became a reality in June 1967. Exploratory and develop- ment drilling has been a continuing effort and reserves

    Jan 1, 1979

  • AUSIMM
    Application of the Split Shell Concept to Open Pit Design

    By M S. Gallagher

    In todayÆs high tech world, systems are getting bigger, faster, better. To remain at the leading edge, in any business, depends on accuratebut flexible design thereby allowing operational managers to

    Jan 1, 2001

  • AUSIMM
    Automatic Control of Agglomeration and Smelting Processes

    By Denholm WT

    Current control practice is reviewed for agglomeration processes, including pelletising, sintering and induration; and for smelting processes, including blast and reverberatory furnaces, flash smeltin

    Jan 1, 1985

  • AUSIMM
    Rainfall Patterns Rather than Climate Classification Control Cover Design for Closure

    By T Baumgartl, B Richards

    Covers on waste rock and tailings remain the primary choice for closure planning where the purpose is to create an environment where water ingress into reactive material can be controlled and/or preve

    Jun 28, 2016

  • AUSIMM
    Hydrocarbon Potential of Duplex Structures, Pleasant Creek Arch, Adavale Basin Queensland Australia

    The Adavale Basin and Warrabin Trough are remnants of a much more extensive Devonian to Carboniferous depression which evolved through four tectonic stages; an initial period of rifting and three peri

    Jan 1, 1990