Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Copper Deposits of Australia

    Copper was first produced in Australia in 1844, at the Kapunda Mine in South Australia, and, by 18i>0, production exceeded 2,000 tons of copper a year. Output increased ,steadily, reaching a peak o

    Jan 1, 1943

  • AUSIMM
    Seminar Keynote Address

    To reflect on the early history of mining in South Australia requires considerable imagination and rashness. The people who were the chief actors in the scene have long since passed away. Accounts

    Jan 1, 1987

  • AUSIMM
    Complex Strombolian and Phreatomagmatic Volcanism of Rothenberg Scoria Cone, East Eifel Volcanic Field

    By Schmincke H-U

    The Pleistocene basanite-tephrite Rothenberg cone complex was built by an alter- nation of strombolian and phreatomagmatic phases of explosive eruption. Two main centres, on a one km long NNE-trend

    Jan 1, 1987

  • AUSIMM
    Legal Aspects Of Environment Planning And Mine Rehabilitation

    In recent years rehabilitation of mine sites has become a principal focus of mining legislation in Victoria. In previous eras, managed rehabilitation commenced, if at all, towards the end of mining op

    Jan 1, 1992

  • AUSIMM
    Recent Consenting of Mining and Quarry Developments Under the Resource Management Act: Case Examples

    Increasing attention is being focussed worldwide on the strategic environmental assessment of mining projects, including consideration of cumulative environmental effects. In New Zealand there is now

    Jan 1, 2005

  • AUSIMM
    Short Term Mine Management Systems û An Integrated Approach to Blast Design, Grade Control, Stockpile Management and Reconciliation

    An integrated computer system (the Short Term Mine Management System) has recently been developed by B.H.P. Steel Long Products Division in Whyalla, South Australia for use in their open pit iron ore

    Jan 1, 1990

  • AUSIMM
    Process developments at Bouganville Copper Limited

    The original design of the Bougainville Copper Limited (BCL) concentrator took cognisance of the constraints imposed by the topography, the need to minimise capital cost, and the need to allow for pla

    Jan 1, 1986

  • AUSIMM
    A Detailed Assessment of Concentrator Performance at Broken Hill South Limited (a6fcafc6-c375-4bcb-a3c6-c657d3498196)

    By Restarick C. J & Stewart P S B, Kelsall D. P

    Over a four-hour period of steady plant operation samples were taken at regular intervals from points within the grinding and flotation circuits. Size fractions of each composite sample were analyse

    Jan 1, 1980

  • AUSIMM
    The Interactive Effect of Flowsheet Design on Beneficiation of Complex Sulphide Ores

    By Newman D, Wyslouzil DM

    Different conventional and non-conventional flowsheet configurations were examined for the treatment of a number of refractory lead-zinc and copper-lead-zinc ores containing carbonaceous pyrite, flo

    Jan 1, 1993

  • AUSIMM
    Computer Simulation of Underground Room and Pillar Mining

    By Szymanski J

    The problems associated with underground mining continue to grow in size and complexity. As a result mine management is becoming aware of the benefits that can be achieved through the use of compute

    Jan 1, 1995

  • AUSIMM
    Research and the Mining Industry

    My message to you today is simple. The mining industry in Australia has a proud record of successful research and innovation. If it is to continue to provide this country with its major exports tha

    Jan 1, 1994

  • AUSIMM
    Limitations and Requirements of Gas Control Methods for High Production Longwall Mining

    By Mitchell G, Clarke C

    The high oas emissions which are associated with high production lonowall mining have provided a need to investigate the limitations and reouirements of the various gas control methods. The major

    Jan 1, 1988

  • AUSIMM
    Geotechnical Studies for Open Pit Mines - West Australian Operating Experience

    Recent operating experience from West Australian open pit gold mines has shown that geotechnical input into initial design is rare. As a result, ground stability is poor - almost half the pits designe

    Jan 1, 1990

  • AUSIMM
    Delay Variability-The Measurement, Analysis and Implication on Rockj Blasting

    By Mckenzie CK

    Delay scatter, although widely recognised, has rarely been studied with the aim of critically reviewing blast designs. With current trends towards increased deck charging, and the effect on the numb

    Jan 1, 1988

  • AUSIMM
    How to Develop a Project

    The most critical step in the development of any mining project is the completion of a feasibility study. The feasibility study has one primary goal; to demonstrate that the project is economically

    Jan 1, 1997

  • AUSIMM
    Polypropylene Membrane Filters

    Filter Presses are used in a wide range of process industries where high quality filtration at elevated pressure is required. This is mainly due to the fact that modern presses are fitted with poly

    Jan 1, 1989

  • AUSIMM
    The Mufultra Sandplant

    By Russell F. M

    Following the accident in the Peterson section of Mufulira mine in September, 1970, a method had to be found of extracting up to 300 000 tonnes of ore per month from this area without inducing cavin

    Jan 1, 1973

  • AUSIMM
    Some Factors Influencing the Design of a Coal Preparation Plant

    Before commencing design of a coal prepar ation plant, it is essential to have detailed information of the raw coal to be treated to- gether with a clear understanding of the products required. Pred

    Jan 1, 1974

  • AUSIMM
    Mining A 100 Million Tonne Orebody Without Subsidence (1eceb353-235c-4b84-8df9-2b3937c9c8f3)

    The major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There w

    Jan 1, 1980

  • AUSIMM
    Surface to Underground - Making the Transition

    The growth of the mining industry around Australia over the last ten years has seen many open cut mines developed on shallow oxide reserves. Most of these have been gold operations, although there

    Jan 1, 1997