Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Special Problems of Management General Report

    The papers to be presented in this Session show an interesting range of subject matter. Three discuss specific problems associated with existing mines, one deals with hydrogeological risk evaluatio

    Jan 1, 1988

  • AUSIMM
    Bauxitic Laterites of the South Western Part of Western Australia

    In the Ora Banda area of the Eastern Gold- fields, the ultramafic rocks tend to be more deeply lateritized than most of the surrounding rock types, and lateritic nickel concentrations have been for

    Jan 1, 1973

  • AUSIMM
    Dewatering and Depressurization of a Multi-Aquifer Groundwater System at Loy Yang Open Cut, Victoria, Australia

    By Gibson I, Somerville J

    Three main confined aquifers occur in interseam sediments beneath the planned excavation for the Loy Yang Brown Coal Open Cut. Sub-artesian groundwater pressures occur in all aquifers necessitating

    Jan 1, 1988

  • AUSIMM
    Outburst Experience at Tower Colliery

    By Doyle R

    Underground operations commenced at Tower Colliery in late 1978 and the early prevailing mining conditions in the worked seam were considered poor as a result of high stress and geological disturb

    Jan 1, 1986

  • AUSIMM
    Keeping Geologists, Production Personnel and Contractors Happy - An Integrated Approach to Blasting at Boddington Gold Mine, WA

    By McBride N

    Location The Boddington Gold Mine (BGM) is located approximately 120 km south east of Perth, Western Australia. (Figure 1). Located within the picturesque Darling Ranges, the land was previously us

    Jan 1, 1995

  • AUSIMM
    Systems Approach to Production Planning of Underground Coal Mines Under Multiple Objective Environment

    The excessively high cost of production in underground coal mines has made the survival of many coal mines around the globe economically non-viable. The global competitive coal market speaks itself

    Jan 1, 1995

  • AUSIMM
    Mine Evaluation-Myth and Reality

    The word "mine" means different things to different people. To a professional in the mining industry, it may mean trucks and shovels, overburden dumps, headframes, mill buildings, and the other c

    Jan 1, 1982

  • AUSIMM
    Purity Systems Inc. Metals Capture Technology for Copper, Nickel and Cobalt Recovery

    By K Kellett, A V. Metzner

    From its discovery in 1845 ion exchange has continually improved technically to an extent where it is now in wide use commercially in many industries including mining and environmental. Purity Systems

    Jan 1, 2002

  • AUSIMM
    Hydraulic Transportation Of Coal-N.S.W. Coal Industry The Need, Current Research And Potential

    The need for the hydraulic transportation of coal in the New South Wales coal industry, both from the coal face to the surface and from the coal mine to the consumer or the port for export, is exp

    Jan 1, 1980

  • AUSIMM
    The Evolution of Cut and Fill Mining at Isa Mine

    By Wright J

    Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t

    Jan 1, 1988

  • AUSIMM
    The Proving of Coal Deposits Preparatory to Underground Mine Planning

    In the exploration of an area proposed for the establishment of an underground colliery, consideration of all land and mining titles and consents has early priority. Environmental aspects have bec

    Jan 1, 1976

  • AUSIMM
    Recent Drilling and Blasting Developments Groote Eylandt Mining Company Pty. Limited

    By Fitter JF

    Drilling and blasting practices at Groote Eylandt are undergoing a period of rapid change. Practices over the last ten years are reviewed and some specific blasting problems currently being faced

    Jan 1, 1982

  • AUSIMM
    Design of Mine Winding Systems

    By Deutsch G. P

    The output of an underground mine often depends entirely on the mine winding system. -Decisions made--at the design stage affect the economy and operation'of the mine'.througb -its entir

    Jan 1, 1973

  • AUSIMM
    Financing the Smaller Mining Project can the Banks help?

    The smaller mining company with full ownership of, or participation in, a mining project is generally unable to obtain funding as easily as the major mining house. While the equity market remains t

    Jan 1, 1984

  • AUSIMM
    Hydrological Analysis of Water Inflows to Mines and its Methods

    The article presents methods of testing and recording of water amount pumped out in surface mining. The authors describe necessary recommendations how to carry out measurements so that one can separat

    Jan 1, 2003

  • AUSIMM
    Financial Rewards for Innovators and Risk-Takers

    By Warren M

    Many Australian tunnelling and mining companies regularly investigate different methods or equipment in an attempt to keep ahead of their competition. Sometimes the result is a new approach or process

    Jan 1, 1993

  • AUSIMM
    Development and Application of the SHOTPlan TM Blast Sequence Design Software

    By Evans R, McCallum P

    Modem blast initiation systems allow users many options for connection and application in the field, and have resulted in more innovative and complex uses of sequencing to influence blast outcomes.

    Jan 1, 1995

  • AUSIMM
    Structural Design of Precast Concrete Linings for Bored Tunnels - Example from the Design of an Urban Mass Rapid Transit System

    By A R. A Gomes

    The Metropolitan Rapid Transit Authority (MRTA) Initial System Project (ISP) - Underground Structures North, UGN, is the northern section of the blue line, which is the first stage of an underground m

    Jan 1, 1999

  • AUSIMM
    Mineralisation of the Morobe Goldfield, Morobe Province, Papua New Guinea (888bc9dd-2413-4b17-98cf-f01418ee929d)

    By Mowat BA, Leach TM

    The Morobe Goldfield in Papua New Guinea has produced in excess of 120 tonnes of gold from predominantly alluvial sources. Hardrock gold has been mined historically at Wau (23t) and Edie Creek (40 an

    Jan 1, 1995

  • AUSIMM
    Lead Smelting at Mount Isa Mines Limited, Mount Isa, Qld

    By Clift N

    Lead concentrate from the Isa and Hilton lead-zinc concentrators of Mount lsa Mines Limited is smelted at Mount Isa to produce a lead-silver bullion. This bullion is cast into four tonne blocks and sh

    Jan 1, 1993