Commissioning the Liddell Colliery LongwallThe Liddell longwall equipment consists of 118 four leg supports, a shearer and armoured face conveyor of 170mm length. The equipment was supplied to Coal & Allied Operations Pty Limited (Coal an
Jan 1, 1986
-
The Impact of the Five Point Safety System on the Underground Sections of the Zinc Corporation, Limited and New Broken Hill Consolidated LimitedSince the introduction of the Neil George Five Point Safety System, to the underground sections of The Zinc Corporation, Limited and New Broken Hill Consolidated Limited mines in March, 1969, the D
Jan 1, 1975
-
Experiments with a Cylinder-Cyclone System for Classification at Coarse SizesBy Restarick C, Jowett A
A cylinder-cyclone system, fitted with a flow control valve between the cylinder and cyclone plus in some tests a variable cyclone spigot, has been used to achieve classifier separations at unusual
Jan 1, 1978
-
Surface and Borehol Microseismic Monitoring of Longwall Faces; their Potential for Three-Dimensional Fracture Imaging anf the Geomechanical Implications.By Bishop I, Toon S
To determine whether 130 felt earth tremors around Edwinstowe, Nottinghamshire U.M, which also experienced severe surface fissuring, were caused by coal extraction, a surface seismometer array was
Jan 1, 1992
-
Gold Mineralisation along the Nam Xiang Fault, Vieng Kham Project, North-east LaosBy M J M Cunningham, M Greentree, J H Liu
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Palaeozoic rocks of north-eastern Laos are an attractive target for gold explorers due
Mar 18, 2015
-
Geology of Western Australian Tin DepositsWestern Australian tin deposits are similar to those of other Precam- brian terrains in that they are mainly associated with rare-metal pegmatites, in which cassiterite is found with minerals conta
Jan 1, 1973
-
Electronic Detonators ù Banking the BenefitsElectronic detonators bring a fundamental and radical change to the potential of rockbreaking operations. The immense technical challenge of safely merging electronic systems with explosives has been
Jan 1, 2004
-
The Energy EquationAs I drove in from the airport on Sunday somebody said `On the right you will see Dun- troon, which is the military training school of Australia.' So I asked the driver, where did they get tha
Jan 1, 1978
-
Inpit Crushing System the Future Mining OptionIn-pit crushing systems have been known in the mining industry for many decades. The question whether in-pit crushing is a viable option has often been asked. More than 200 mobile and semi mobile crus
Jan 1, 2003
-
The Role of the Environmental ConsultantThe new field of environmental investiga tions introduces new problems of ethics, res- ponsibility, conflict of interest and technical procedures. Such investigations involve four elements: develope
Jan 1, 1975
-
Froth Flotation of Coal Fines at Coal Cliff CollieryBy Atkinson D
This paper briefly outlines the develop ment of the froth flotation plant at Coal Cliff Colliery. The plant was superimposed onto the original flow sheet in which fines were merely thickened and fil
Jan 1, 1974
-
Secondary Breakage Practice at the DOZ Block Cave MineBy A Sinuhaji, H Kalangi, T B. Setyoko
Ore fragmentation at the DOZ block cave mine is highly variable, both as a function of rock type and column height of draw. Initially, the mine was constructed and equipped with limited capability to
Jan 1, 2005
-
Optimisation of Cut-Off Grade at Mount Isa Mines Limited Æs Enterprise MineBy G MacSporran, I Sheppard
The practical application of LaneÆs theory on optimum cut-off grade policy has to date proved difficult for selective stoping in large-scale underground mining. The key to determining an optimum cut-o
Jan 1, 2003
-
A Practical Method of Approach to the Problems of Mineral FlotationResponse of a mineral to anionic and cationic flotation reagentsvaries with the nature of the mineral and the particle size. A ruleis deduced for the selection of the correct type of reagent, which le
Jan 1, 1963
-
The Steep Angle Conveying Option for Large Open Pit MinesTraditionally trucks have dominated haulage in open pit mines. Only recently have conveyors begun to be used in the long haul and high lift duties of surface mines. Steep angle conveyors are proven ve
Jan 1, 2003
-
Sulphide Orebodies and Structure: Mapping Within an Orebody and What It Can Tell You - An Example from Broken Hill NSWTraditionally, the Lead Lode at Broken Hill has been represented on presentation plans, cross sections and diagrams in scientific papers as a solid black mass, around which the more 'interesting&
Jan 1, 1993
-
Constraints on the Dynamics of Rifting and Denudation on the Eastern Margin of Australia: Fission Track Evidence for Two Discrete Causes of Rock Cooling (95e85735-3d90-4a78-b6e4-557395ba00bb)By Gleadow AJW, Foster DA, Kohn BP, Raza A
A large and increasing data base of apatite fission track results from sedimentary and granitic rocks exposed within the southeastern highlands and along the continental margin of Australia provides
Jan 1, 1995
-
The Effect of Detonator Strength on the Initiation of Small Diameter Emulsion ExplosivesBy Kerr I. D, Kennedy M
Flash X-radiographs were obtained of commercial electric No 6 and No 8* strength aluminium tube detonators in small-diameter cartridges of emulsion explosive at various times after fusehead operatio
Jan 1, 1990
-
Floatation of Ok Tedi PyritePyrite is a significant gangue sulphide mineral in the Ok Tedi copper ore. Its presence in the flotation concentrate is not entirely desirable since it lowers the grade of the final copper concentra
Jan 1, 1997
-
A Probabilistic Approach to the Design Optimisation of Overburden Slopes at Morwell Open CutBy Rieniets S, Somerville J. L
In Morwell Open Cut brown coal mine, the overburden 'firehole' materials which have resulted from ancient coal fires vary-from hard baked clays to firm laminated lacustrine clays. The need