Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Use of a Range of Compact Diesels for Original and Re-Engining Applications

    This paper reviews the use of MTU diesel engines in uses such as Off-Highway Vehicles, Rail traction, Generating Sets, Marine Propulsion and Defence Applications, and focuses on a central theme of

    Jan 1, 1986

  • AUSIMM
    Development Of, And Experience With, Underground Electric Loaders

    By Sillet R, Corin P. J, Wilson G

    Zinc Corporation of Broken Hi11 had some long hole stopes coming into use which could not be mined using diesel loaders, because of ventilation restrictions. In preference to use of pneumatic load

    Jan 1, 1977

  • AUSIMM
    New Tailings Dam at Ardlethan Tin N.L.

    In May 1977 a new dam was commissioned for disposal of 600,000 metric tonnes/year of tailings. Design basis, costs and construction problems are described. Problems arose, assoc- iated with lack of

    Jan 1, 1978

  • AUSIMM
    Lubrication Oil Refining

    Although a small quantity of lc,;v viscosity index ' (L.V.I.) oils are presently manufactured in. Australia, lubricating oil refining methods are assuming gxeater significance since in 1964 Austr

    Jan 1, 1962

  • AUSIMM
    Longhole Open Stoping Practice at the CSA Mine Cobar

    By Jackson GS

    Since 1983 Cobar Mines Pty Ltd has madea concerted effort to improve the performance of its long hole open stopes, especially in the areas of dilution and fragmentation.This has resulted in modificati

    Jan 1, 1985

  • AUSIMM
    Mineralogy Controlling Metallurgy at Ernest Henry Mining

    By Barns K. E, Munro P. D, Brindley S. K

    Ernest Henry Mining Pty Ltd started production in August 1997. The Ernest Henry orebody consists of two distinct parts, a complex supergene ore zone overlying a primary ore zone. The economic copper

    Jan 1, 1998

  • AUSIMM
    Application of a Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model for Subsidence Prediction

    By Chugh Y. P

    A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the

    Jan 1, 1992

  • AUSIMM
    An Approach to Coping with Unstable Pit Walls

    In any open pit mine some slope instability may be expected. This can range from small scale sliding on individual benches to large scale overall slope failure. This paper presents two case histori

    Jan 1, 1986

  • AUSIMM
    Grade Distribution and Grade Control Procedures, Great Lady Gold Deposit, Eastern Goldfields, WA

    The Great lady gold deposit presented the challenge of providing a new grade control system for an usual type of orebody in the Eastern Goldfields. Mineralisation occurs as secondary enrichment about

    Jan 1, 1990

  • AUSIMM
    Establishing a Sustainable Competitive Position at Hilton Mine

    Mount Isa Mines' Hilton Mine was brought into large-scale production in 1990/91 at a time of sharply falling metal prices. To ensure the operation's survival and eventual prosperity there

    Jan 1, 1993

  • AUSIMM
    E.A. Weinberg and the Australian Smelting Industry

    Weinberg, born and educated in Germany, worked in'the American West for 10 years as a mining engineer and metallurgist. He was the first head of the Queensland Smelting Co. and from 1889 through

    Jan 1, 1985

  • AUSIMM
    Pressure Filtration of Hellyer Concentrates

    By Francis R. S, Campbell J. J

    Aberfoyle's Hellyer Division has filtered very fine flotation concentrates using two different makes of pressure filter. At the Luina concentrator a Larox pressure filter was used to treat a c

    Jan 1, 1989

  • AUSIMM
    Wirralie Gold Mine A Case Study

    By Goode A, Belby P, Wardell-Johnson M

    Within a short time frame of just over two years Wirralie Gold Mine has been developed from a virgin geological discovery to an operating gold mine with a mine life of six years and a production r

    Jan 1, 1989

  • AUSIMM
    Environmental Planning And The Mount Gunson Operation

    By Warren R. P

    When the original Mount Gunson joint venture, between CSR and United Uranium ceased operations in December 1971, an intensive ex- ploration campaign was launched to prospect for more ore in the Mou

    Jan 1, 1976

  • AUSIMM
    The Mechanical Property of Coal Containing Gas

    By Shining Z

    The strength and deformation of more than two hundred coal samples have been tested in the condition of triaxial compression. The regression equation showing the relationship between coal strength

    Jan 1, 1992

  • AUSIMM
    Using Electronic Detonators to Improve Fragmentation, Diggability and Crusher Throughput

    This paper reports on the field results of using electronic detonators to improve blast outcomes. OricaÆs electronic detonator, the i-konTM Digital Energy Control System, allows exact and precise timi

    Jan 1, 2003

  • AUSIMM
    Ignition of Elura Lead Concentrate Under Flash Drying Conditions

    By Turner T. M, Jorgensen F. R A

    The tendency of the concentrate to ignite was studied using four techniques, namely, laminar flow furnace, fluid bed, thermal analysis and boat-in-furnace. Exothermic activity occurred at two temp

    Jan 1, 1987

  • AUSIMM
    On Structural Analyses of Oriented Bore Cores from the West Wallsend No.2 Colliery Holding

    Structural analyses of oriented bore core sections from the West Wallsend No.2 Colliery Holding together with investigations in adjac- ent collieries and on the surface delineated structural phenome

    Jan 1, 1972

  • AUSIMM
    Ulan Highwall Project

    HIGHWALL MINING - DECISION TO MINEUlan had completed operations in the first Open Cut area due to high stripping ratios and the presence of geological features which destroyed a significant portion of

    Jan 1, 1998

  • AUSIMM
    A Formal Approach to Economic Analysis of Pit Slope Design

    By Coates D. F, Neil T. J, O&apos

    A proper economic analysis of pit slope design must reflect the trade-off between the benefits and the increased risks of slope fail- ure inherent in steeper slope angles. However, no formal framewo

    Jan 1, 1977