Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Carpenter’s Journey through Forty Years of Underground Mining, Leaders and Leading

    By J Nixon

    I have to say that my story is not too much different to many others who grew up and worked in the great mining fields like Broken Hill, Mt Isa, Rosebery, Kalgoorlie or Kambalda and any one of them co

    Mar 21, 2011

  • AUSIMM
    Shear strength of compacted clay liner at McArthur River Mine

    By Y Xu, J Hacker, D J. Williams

    Shear strength parameters of compacted clay liners are needed to analyse the stability of mine waste dumps containing compacted clay liners as sealing layers for potentially acid forming waste rock. A

    Jul 23, 2018

  • AUSIMM
    Greater Use of Geoscan On-belt Analysis for Process Control at Sepon Copper Operation

    By T D. Jolly, L A. Balzan, A R. Harris, Z Bauk

    "The availability of real-time data in any process control system is critical for effective management of that system. At MMG LXML Sepon Copper Operation in Lao PDR, controlling the copper grade of th

    Oct 10, 2016

  • AUSIMM
    Effect of mud farming on the dewatering of bauxite residue

    By D J. Williams, C Zhang, F E. Herrera Cabrera

    Farming on bauxite residue using screw propelled equipment (SPE) has been commonly practised to accelerate dewatering and as it promotes consolidation and enhances storage capacity. However, it is unc

    Jul 1, 2021

  • AUSIMM
    Simulation of the Effects of Inertisation of Fires on Mine Ventilation Systems

    By A M. Wala, H W. Wu

    A research project incorporating a number of mine site exercises to reduce the effects of fire incidents and possible consequent health and safety hazards has been undertaken focused on the applicatio

    Jan 1, 2005

  • AUSIMM
    Logistics in Mining Towards 2000 'The Low Cost Provider'

    A combination of the needs of business, employee desires and safety and health considerations is stimulating increasing attention to the time spent by people at work and the timing of that work. Pa

    Jan 1, 1996

  • AUSIMM
    Growth Prospects Through Innovation Systems for Utilising Mineral Wastes in Production

    Mineral formations, accumulated during technogenic activities greatly influence an economic and ecological situation in the Kola North. On the one hand, the dumps from extraction of mineral resources,

    Jan 1, 2002

  • AUSIMM
    Pairing Magnetic and E-field through-the-Earth Communication Systems Based on Mine Site Conditions

    By S J. Schafrik, E S. Gilliland, E C. Jong, J Waynert, C W. Weiss

    Two commercially available through-the-Earth (TTE) communications systems were evaluated at an active underground longwall mine in West Virginia. One system utilises magnetic field (H-field) antennae

    Nov 4, 2015

  • AUSIMM
    Study of Bauxite Separation by Using Flotation Column

    Study of Bauxite Separation by Using Flotation Column

    Sep 13, 2010

  • AUSIMM
    Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse Reject

    Coal washery wastes comprise tailings, finer than 0.5 to 0.1 mm depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings slurr

    Jan 1, 1998

  • AUSIMM
    BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and Future

    By M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken

    "BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to

    Sep 29, 2013

  • AUSIMM
    Stability of Hydraulic Backfill Barricades (eefd356e-6d40-4b19-af58-7f0537046a1f)

    Hydraulic backfill is generally retained in slopes using permeable barricades. Mitchell et a! (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades e

    Jan 1, 1998

  • AUSIMM
    The necessary role of the geologist in geotechnical data gathering

    By P B. Hills

    Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t

    Sep 20, 2017

  • AUSIMM
    Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with Reflux

    By Iley J. D, Siviour N. g, Moffatt R. J

    The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p

    Jan 1, 1989

  • AUSIMM
    State-of-the-Art in Tunnel Ventilation Systems Design – Applicable Options to Meet Fire-Life-Safety Code Requirements

    By P C. Miclea

    Transportation networks extend every day around the world, requiring safe and well-maintained structures for efficiency and for users’ safety. Due to specific features of the infrastructure, such as l

    Mar 8, 2011

  • AUSIMM
    Diavik Diamond Mine north country rock pile – an example of integrated mine planning for successful progressive reclamation

    By G Stephenson, G MacDonald, A Yeomans, S Sinclair, V Knott

    Rio Tinto has actively committed to progressive reclamation, concurrent with commercial operations, at its Diavik Diamond Mine. The most significant piece of progressive reclamation undertaken at Diav

    Aug 2, 2023

  • AUSIMM
    Enhancing the fairness in LoRa-Based linear wireless mesh networks in underground mining

    By A Seneviratne, Y Li, N Udugampola, X Ai, B Li

    LoRa (Long Range) is a low-power, long-range wireless communication technology that has gained significant research interest for its potential use in multi-hop linear wireless sensor networks (LWSNs)

    Sep 1, 2024

  • AUSIMM
    How progressive waste rejection should transform your mining business

    By M Pyle, R Ch, T Vizcarra, ramohan, G Lane, G Ballantyne

    Preconcentration, through gravity separation (Wallace et al, 2015), magnetic separation and particle size (Clout, 2013), has been used in many historical projects to convert low grade material into or

    Nov 10, 2020

  • AUSIMM
    Innovations in the Northbridge Tunnel, Perth - Exploiting the Aardvark Principle

    The Graham Farmer Freeway Project in Perth, Western Australia, is the largest urban infrastructure project ever carried out in the State. At a project cost of over $360 million, it also ranks as one o

    Jan 1, 1999

  • AUSIMM
    Targeting dilatancy in upstream construction

    By A Simmons, J Chan, A Li, Q Gu, D M. Brett

    The paper presents an example of field density achievements using thin layer deposition and solar drying and compares this with compaction data from laboratory testing and field trials of mechanical d

    Jul 1, 2021