Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Important Considerations in the Design of Mechanical Flotation MachinesBy L D. Redden, M G. Nelson
Mechanical flotation machine design is typically based on hydrodynamic analysis, with scale-up calculated by geometric proportionality. End users often specify and purchase machines on the basis of re
Jan 1, 2005
-
Learnings from review of drawpoint management across New South Wales minesBy X Hill
Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ
Oct 16, 2017
-
The Business Case for Mine Closure Planning and an Overview of Anglo AmericanÆs Mine Closure Toolbox ApproachBy P R. Botha
Mining has played a significant role in human development and without the mining sector, society would not enjoy a large number of the benefits that it does today. However, mining has also carried wit
Jul 10, 2012
-
Working in Metallurgy ResearchWhen studying minerals degrees at university, all the emphasis is towards sending the graduates into the bush to work at a remote mine; however, that is not the only option available to new graduates.
Jan 1, 2006
-
Engaging Generation Y with the Minerals IndustryFollowing a decline in direct and indirect employment in the minerals industry between 2000 and 2003, the situation reversed in 2004 and employment rose by 12 per cent. Furthermore, there are forecast
Jan 1, 2005
-
Simulation of Flotation Feed Pre-ClassificationBy J Arola, B Kettunen, W M. Bond
Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s
Jan 1, 2005
-
Risk Assessment in Mine Rehabilitation Planning: Using the Option of an Above Ground Tailings Containment at Ranger Uranium Mine as an ExampleBy Riley S. J
Ranger Uranium Mine is located within the Alligator Rivers Region of the Northern Territory of Australia and surrounded by the World Heritage listed Kakadu National Park (Figure 1). The mining oper
Jan 1, 1994
-
Application of Block Caving System in the Tongkuangyu Copper MineBy Song Yongxue
During the design and operation stages of a block caving project, a large amount of research and development work has been undertaken in the Tongkuangyu Copper Mine. This paper presents the research a
Jan 1, 2000
-
Secondary Ventilation as a Value Proposition – A Case StudyBy A Golsby
Both primary and secondary ventilation is important in underground mining. Secondary ventilation refers to the provision of ventilation to development ends, stopes and services facilities, which const
Aug 31, 2015
-
Determining Gold Particle Size in Gravity Ores for Sampling and Metallurgical Characterisation - Discussion and Test ProtocolSampling protocols and metallurgical flow sheets should be designed to suit the style of mineralisation in question. In support, the a priori need for evaluation programs is the characterisation of th
Aug 1, 2010
-
Optimisation of the Sepon Copper Milling CircuitBy A Jakowetz
OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho
Jan 1, 2006
-
Legume and Grass Revegetation of Mine TailingsBy C P. C David, J P. T Domingo
Addressing nutrient deficiency, among other factors, is vital to the growth and establishment of plants in mine spoils and tailings ponds. Although several organic amendments are available for this pu
Jul 16, 2014
-
Effect of Carbon Type on Adsorption of Cu, Zn, Ag and Au from Mixed Cyanide SolutionBy S Lakemond, L I. Ku, J Vaughan
Conventional processing of poly-metallic gold containing flotation concentrates are challenging for a number of reasons. One reason is that substantial copper and zinc in the cyanide leach solution co
Sep 26, 2013
-
Improved Trigger Action Response Plan Development Based Upon Mine-specific DataBy D Cliff, B Belle
Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a
Aug 31, 2015
-
Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade"Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even
Mar 8, 2016
-
Estimating Mineralogy in Bulk SamplesBy R Berry
This paper looks at two ways to estimate the bulk mineralogy of the rocks for assay intervals. The aim is to find an efficient indicator of the most common minerals in the rock. Phase (modal) analysis
Sep 5, 2011
-
The use of collaboration and management to turn-around the performance of a failing copper mineBy M Jacobs
This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo
Jun 22, 2022
-
Evaluation of Complex Systems to Develop Key Water Quality Influences at the DeBeers Snap Lake Diamond ProjectBy R L. Verburg, R Johnstone
DeBeers Canada Mining Inc (DeBeers) recently submitted an Environmental Assessment (EA) for its proposed Snap Lake Diamond Mine located in Northwest Territories, Canada. As part of the EA process, a s
Jan 1, 2003
-
Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mineBy S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi
Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine
Aug 2, 2023
-
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production SchedulingGenerating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The
Dec 6, 2010