Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Determination of the Complete Sampling Distribution for a Particulate Material

    By G J. Lyman

    The theory of sampling has progressed slowly over the last century. The concepts of correct sampling were known to mining engineers such as D W Brunton in the 19th century. It was recognised early in

    Jul 29, 2014

  • AUSIMM
    Computer Aided Design System for Mineral Beneficiation, Which Allows for Liberation

    By Prince R. G H, Guerney P. J, Frew J. A, Vanderkruk C. R, Wanigasekara-Mohoti D. K

    This computer-aided design system for mineral processing flowsheets which are based on froth flotation, size reduction and classification combines an expert system for generating flowsheet structure

    Jan 1, 1997

  • AUSIMM
    Reducing Crest Loss at Barrick Cowal Gold Mine

    By R Battison, R Duggan, S Esen, K Henley, P Dare-Bryan

    Increased catch bench crest loss has been observed in recent years at Barrick’s Cowal Gold Mine situated in central New South Wales, Australia. A project was initiated to diagnose the cause of the cre

    Aug 24, 2015

  • AUSIMM
    Application of Heterogeneity Testing to Coarse Gold Ores

    By S C. Dominy, R C. A Minnitt

    Determination of the sampling constant and liberation diameter are of importance when applying the Fundamental Sampling Error (FSE) equation to optimise sampling protocols. The method for the direct d

    Aug 21, 2012

  • AUSIMM
    The Discovery and Development of Coal in South Australia

    By Kwitko G

    Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits

    Jan 1, 1992

  • AUSIMM
    Rapid Resource Modelling – A Vision for Faster and Better Mining Decisions

    By P F. Hodkiewicz

    "Our understanding of mineral resources relies on three basic steps: data capture data interpretation model construction. Until recently, all three of these steps required significant time and ma

    Aug 18, 2014

  • AUSIMM
    Geometallurgical Modelling – A Mineral Processor's Perspective

    By A Stradling

    For a geometallurgical program to be successful, linkage must be made between the geologists and geostaticians who understand and model the orebody, the metallurgists who determine the value that can

    Sep 5, 2011

  • AUSIMM
    The Role of Benchmarking and Independent Reviews

    By D Hunter, N Cusworth, J Miller

    "Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche

    Mar 8, 2016

  • AUSIMM
    Leaching of Zinc from Calcined Angouran Plant Flotation Tailings Using Sulphuric Acid

    By S Moradi

    The aim of this study was to investigate the possibility of leaching zinc from the tailing (-2 mm) of Angouran flotation plant using sulphuric acid. The tails were first calcined at 800¦C for one hour

    Jan 1, 2002

  • AUSIMM
    Development and Implementation of Spin-to-stall Resin at Anglo American’s Australian Underground Coal Operations

    By P Craig, I Canbulat, J Naylor, J Emery, A Sykes

    Longwall mining is by far the most common method of underground coal extraction in Australia. Industry trends and expectations are placing increasing emphasis on the reliability and productivity of th

    Nov 5, 2014

  • AUSIMM
    Eco-Efficient Gravity Separation Solutions in India

    Eco-Efficient Gravity Separation Solutions in India Sustainable development and social responsibility issues are a principal aspect of mineral processing operations around the world. With the need fo

    Sep 13, 2010

  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • AUSIMM
    Observations From the Magazine Dump Clay Capping Trial

    By D Ray, D Brett

    A clay-capping trial was established in 1996 on Magazine Dump at the Mt Lyell Copper Mine. The trial was initially constructed under the Mount Lyell Remediation Research and Demonstration Program, a c

    Jan 1, 2003

  • AUSIMM
    Back to the Future - Why Change Doesn't Necessarily Mean Progress

    By P A. Tilyard

    There have been enormous changes in mineral processing in the past four decades. For example grinding mill power has increased by an order of magnitude, regrinding is done to -10 microns and flotation

    Jan 1, 2009

  • AUSIMM
    Improving Coal Mining Production Performance Through the Application of Total Production Mangement

    This paper describes the application of the Total Productive Management (TPM) technique as a performance improvement initiative for a coal mining operation. It discusses the objectives of TPM, with th

    Jan 1, 1998

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs

    By J J. Laas, A J. S Spearing

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Vaal

    Jan 1, 1998

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)

    By Laas JJ, Spearing AJS

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va

    Jan 1, 1998

  • AUSIMM
    Some Practical Problems in Running Statistically Valid Plant Trials, and Their Solution

    Operating metallurgists spend a significant part of their time running plant trials to compare two or more conditions in order to improve the process, such as a new reagent, flow sheet or piece of equ

    Jan 1, 2008

  • AUSIMM
    Yallourn North Extension Open Cut Interim Rehabilitation

    By Pilkington T, Noy A

    The Yallourn North Extension (YNX) open cut mine ceased mining operations in early 1989. YNX may be used again for coal supply at the discretion of the Coal Corporation Of Victoria (CCV); this has res

    Jan 1, 1992

  • AUSIMM
    Incorporating controls and automation into mining engineering curriculum

    By S J. Schafrik, M Long

    There are several factors that are increasing the need for new graduates to be ready to design and manage more autonomous operations at mines. Autonomous controls and systems range from the start-up,

    Sep 1, 2024