Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Determination of the Complete Sampling Distribution for a Particulate MaterialBy G J. Lyman
The theory of sampling has progressed slowly over the last century. The concepts of correct sampling were known to mining engineers such as D W Brunton in the 19th century. It was recognised early in
Jul 29, 2014
-
Computer Aided Design System for Mineral Beneficiation, Which Allows for LiberationBy Prince R. G H, Guerney P. J, Frew J. A, Vanderkruk C. R, Wanigasekara-Mohoti D. K
This computer-aided design system for mineral processing flowsheets which are based on froth flotation, size reduction and classification combines an expert system for generating flowsheet structure
Jan 1, 1997
-
Reducing Crest Loss at Barrick Cowal Gold MineBy R Battison, R Duggan, S Esen, K Henley, P Dare-Bryan
Increased catch bench crest loss has been observed in recent years at Barrick’s Cowal Gold Mine situated in central New South Wales, Australia. A project was initiated to diagnose the cause of the cre
Aug 24, 2015
-
Application of Heterogeneity Testing to Coarse Gold OresBy S C. Dominy, R C. A Minnitt
Determination of the sampling constant and liberation diameter are of importance when applying the Fundamental Sampling Error (FSE) equation to optimise sampling protocols. The method for the direct d
Aug 21, 2012
-
The Discovery and Development of Coal in South AustraliaBy Kwitko G
Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits
Jan 1, 1992
-
Rapid Resource Modelling – A Vision for Faster and Better Mining DecisionsBy P F. Hodkiewicz
"Our understanding of mineral resources relies on three basic steps: data capture data interpretation model construction. Until recently, all three of these steps required significant time and ma
Aug 18, 2014
-
Geometallurgical Modelling – A Mineral Processor's PerspectiveBy A Stradling
For a geometallurgical program to be successful, linkage must be made between the geologists and geostaticians who understand and model the orebody, the metallurgists who determine the value that can
Sep 5, 2011
-
The Role of Benchmarking and Independent ReviewsBy D Hunter, N Cusworth, J Miller
"Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche
Mar 8, 2016
-
Leaching of Zinc from Calcined Angouran Plant Flotation Tailings Using Sulphuric AcidBy S Moradi
The aim of this study was to investigate the possibility of leaching zinc from the tailing (-2 mm) of Angouran flotation plant using sulphuric acid. The tails were first calcined at 800¦C for one hour
Jan 1, 2002
-
Development and Implementation of Spin-to-stall Resin at Anglo American’s Australian Underground Coal OperationsBy P Craig, I Canbulat, J Naylor, J Emery, A Sykes
Longwall mining is by far the most common method of underground coal extraction in Australia. Industry trends and expectations are placing increasing emphasis on the reliability and productivity of th
Nov 5, 2014
-
Eco-Efficient Gravity Separation Solutions in IndiaEco-Efficient Gravity Separation Solutions in India Sustainable development and social responsibility issues are a principal aspect of mineral processing operations around the world. With the need fo
Sep 13, 2010
-
Design of Air-Blast Plugs for a Sublevel Caving OperationThe Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav
Nov 25, 2010
-
Observations From the Magazine Dump Clay Capping TrialBy D Ray, D Brett
A clay-capping trial was established in 1996 on Magazine Dump at the Mt Lyell Copper Mine. The trial was initially constructed under the Mount Lyell Remediation Research and Demonstration Program, a c
Jan 1, 2003
-
Back to the Future - Why Change Doesn't Necessarily Mean ProgressBy P A. Tilyard
There have been enormous changes in mineral processing in the past four decades. For example grinding mill power has increased by an order of magnitude, regrinding is done to -10 microns and flotation
Jan 1, 2009
-
Improving Coal Mining Production Performance Through the Application of Total Production MangementThis paper describes the application of the Total Productive Management (TPM) technique as a performance improvement initiative for a coal mining operation. It discusses the objectives of TPM, with th
Jan 1, 1998
-
Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal ReefsBy J J. Laas, A J. S Spearing
Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Vaal
Jan 1, 1998
-
Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)By Laas JJ, Spearing AJS
Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va
Jan 1, 1998
-
Some Practical Problems in Running Statistically Valid Plant Trials, and Their SolutionOperating metallurgists spend a significant part of their time running plant trials to compare two or more conditions in order to improve the process, such as a new reagent, flow sheet or piece of equ
Jan 1, 2008
-
Yallourn North Extension Open Cut Interim RehabilitationBy Pilkington T, Noy A
The Yallourn North Extension (YNX) open cut mine ceased mining operations in early 1989. YNX may be used again for coal supply at the discretion of the Coal Corporation Of Victoria (CCV); this has res
Jan 1, 1992
-
Incorporating controls and automation into mining engineering curriculumBy S J. Schafrik, M Long
There are several factors that are increasing the need for new graduates to be ready to design and manage more autonomous operations at mines. Autonomous controls and systems range from the start-up,
Sep 1, 2024