Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Drillling Patterns and Ore Reserve Assessments

    By Watson D. F

    Armstrong's (1983) criticisms of PhiIip and Watson's (1982b) note on optimal drilling patterns are based on misinterpretation, supported by errors in geometry. Furthermore, Armstrong argues

    Jan 1, 1984

  • AUSIMM
    State and Development Trends of EDP-Based Operation Monitoring and Remote Control in the Coal Mining Industry of the Federal Republic of Germany

    By Stuedel J

    Starting from comprehensive programme systems for monitoring tasks of any kind, this paper follows the steps of the programme system hierarchy from top to bottom. The monitoring and control centres fo

    Jan 1, 1985

  • AUSIMM
    An Investigation of the Corrosive Impact of Groundwater on Rock Bolts in Underground Coalmines

    By P Craig, A Crosky, P C. Hagan, E Elias, B Hebblewhite, S Saydam, D Vandermaat

    "Premature failure of rock bolts has been recorded at twelve underground coalmines over the past 15 years in Australia. Over the last four years, UNSW Australia has been conducting an Australian Resea

    Nov 5, 2014

  • AUSIMM
    Presidential Address (b179f219-258b-42e8-92fe-9c28ebd7b814)

    As this is the first occasion I have had, and probably will be the only opportunity I shall have, of addressing such a large gathering of members and of student members of the Institute, I desire to-

    Jan 1, 1937

  • AUSIMM
    Total Deposit Knowledge – Geology, Underground Mass Mining and the Future – A Mining Engineer’s Perspective

    By G Chitombo

    Mass mining methods have become the mining industry’s preferred way of extracting most of the world’s most important metal and mineral commodities. Given the rapidly increasing global demand for commo

    Aug 22, 2011

  • AUSIMM
    Classification and Nomenclature of Ore Reserves

    In 1953, Dr. N. H. Fisher of the Bureau of Mineral Resources, acting on behalf of the Society of Economic Geologists, which is considering the sponsoring of a uniform system of nomenclature for ore re

    Jan 1, 1955

  • AUSIMM
    The Effect of Grinding Media on Copper and Gold Flotation in the Presence of Clay Minerals

    By R Wei, Y Peng, D Seaman

    This study addresses a widespread problem confronting the mining industry: the deleterious effect of clay minerals in flotation. This problem is seemingly exacerbated by the presence of iron contamina

    Sep 26, 2013

  • AUSIMM
    The Casposo Gold-Silver Project – Process Selection and Design

    By D Connelly

    Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi

    Aug 8, 2011

  • AUSIMM
    Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLAC

    By B Ghahreman‐Nejad, M Munro

    Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an

    Jul 1, 2021

  • AUSIMM
    Decreasing Operating Costs and Soluble Loss in Copper Hydrometallurgy With Use of Innovative Solvent Extraction Circuits

    By A Nisbett

    The largest single operating loss in many hydrometallurgical plants is the poor recovery of leached product in the solids sent to tailings. Any reduction in the concentration of the valuable species i

    Jan 1, 2005

  • AUSIMM
    Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case Study

    By A Campbell

    Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en

    Nov 8, 2011

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    The Mine Labour Problem-Wages, Contract or Tribute

    The labour question is one that has caused mine managers much thought and anxiety and is likely to continue to do so as long as human beings exist. The difficulty is to devise some arrangement whereby

    Jan 1, 1901

  • AUSIMM
    The Development of a Procedure for the Inspection of Unlined Rock Service Tunnels

    By D Lees, D Gilchrist

    Sydney has hundreds of kilometres of sewer tunnels. Many of these are over 50 years old and some have been in service for more than 100 years. The tunnels are predominantly constructed in Hawkesbury S

    Sep 17, 2014

  • AUSIMM
    Optimisation of Slope Angles at Rosario Mine, Collahuasi

    By A R. Bonani, M P. Pe±a

    The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p

    Jan 1, 2007

  • AUSIMM
    Sublevel Caving - Today's Dependable Low-Cost 'Ore Factory'

    Much of the theory upon which the Sublevel Caving (SLC) method is based was developed in Scandinavia many years ago. It was based mainly on æbinÆ theory and æellipsoid of drawÆ configurations derived

    Jan 1, 2000

  • AUSIMM
    The Importance of Data Collection to the Blasting Process

    By J Hutchings

    An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat

    Nov 8, 2011

  • AUSIMM
    Non-Ideal Shock Energy Factor versus Powder Factor for Open Pit Blast Design – ANFO and Chemically-Sensitised Emulsions

    By K G. Fleetwood

    This paper proposes an approach to determine the influence of non-ideal detonation characteristics related to the charge diameter, explosive type and confinement conditions on the available shock ener

    Nov 8, 2011

  • AUSIMM
    The R67 Refrigeration Plant at Enterprise Mine, Mount Isa ù The WorldÆs Largest Bulk Air Cooler

    The 3.5 million tones per annum Enterprise mine is the newest underground copper mine at Mount Isa in northern Australia. At a depth of up to 2000 metres, it is the hottest and deepest mine in Austral

    Jan 1, 2002

  • AUSIMM
    Preparing for Uncertain Mineral Futures - A Survey of AusIMM Members on the Future Issues and Drivers for the Australian Minerals Industry

    By C Mason, A Littleboy

    This paper presents the results of a large scale survey of The Australasian Institute for Mining and Metallurgy (AusIMM) membership. This survey aimed to understand and define the key issues and drive

    Jan 1, 2009