Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
"Computer Simulation of the Direct Iron Reductionin MIDREX Ovens"By A T. Bernardes
Using the cellular automata computational technique it was possible to simulate the generation and discharge of an iron ore pellet pile inside a direct iron reduction oven, as well as to calculate the
Sep 26, 2011
-
Capital Expenditure Modelling for Strategic Mine SchedulingBy L Blackwell
Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea
Nov 24, 2014
-
The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisationBy X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones
Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla
Jun 22, 2022
-
Planning for Commercial Operation of the Honeymoon ISL Uranium ProjectA recoverable uranium resource, shown to be suitable for in situ leaching, was discovered at Honeymoon in South Australia in 1971. Exploration of the deposit was carried out during the period from 197
Jan 1, 2002
-
Acousto Ultrasonic-Echo (AU-E) and Ultrasound Technology ù Determination of the Lining and Cooling Element Condition of Operational FurnacesBy A Sadri, S Smith
In the metal and mineral industry, different empirical techniques are used to estimate the remaining thickness of the lining within an operating furnace. The disadvantage and costly factor when using
Jan 1, 2006
-
A New Metaheuristic Algorithm for Long-Term Open Pit Production PlanningBy C Niemann-Delius
The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new
Sep 26, 2011
-
Understanding Trends in Performance of Open Cut Mining EquipmentBy G Lumley
PlannersÆ optimism (or maybe commercial necessity) means that most mine plans use equipment rates that are rarely achieved (Lumley and Beckman, 2009). This lack of understanding of what equipment actu
May 24, 2012
-
Project Selection and Process Development for Mining JuniorsBy L Lorenzen, H Muller
"Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th
May 24, 2012
-
"Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"By A Esfahanipour, M Osanloo
Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en
Sep 26, 2011
-
Comparison of Excavation Methods in Different Ground Conditions with the Decision Aids for TunnellingBy F Sandrone, J-P Dudt, J Zhao, E Paltrinieri
Tunnel boring machines (TBMs) excavation is nowadays more and more considered a valuable alternative to conventional tunnelling. As a matter of fact, thanks to its advantages such as greater rate of a
Sep 17, 2014
-
Optimum Dig Lines for Open Pit Grade ControlBy I Treloar, T Elenbaas, E Isaaks
Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t
Aug 18, 2014
-
Screen Media Aperture Size Measurement Using MetsoÆs Screen TrackerBy G van Niekerk, M Wortley
Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.
Sep 26, 2011
-
Dingo – an optimisation tool to solve complex short interval control at Telfer underground mineBy S Graskoski
The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont
Oct 16, 2017
-
Reproduction of inequality constraint between iron and silica for accurate production schedulingBy N Madani, S Abulkhair, N Morales
Conventional geostatistical algorithms cannot reproduce bivariate complexities such as inequality constraint, nonlinearity and heteroscedasticity. Poor reproduction of these features may decrease the
Nov 8, 2021
-
Bowen Basin Coalmine Spoil Classification for Improved Mine Rehabilitation OutcomesBy T Baumgartl, J Burgess, B Emmerton, P D. Erskine
Large-scale open cut mining in the Bowen Basin has been undertaken for over 40 years. During this period, improved mechanical capability and economics have allowed extraction to greater depths, result
Jun 28, 2016
-
Blast Fragmentation Impacts on Downstream Processing at Goldfields Cerro CoronaBy D La Rosa, K Caron, H Mamani, W Valery, R Diaz
The Gold Fields Cerro Corona copper-gold deposit in Peru has heterogeneous rock characteristics in terms of its mineralogical, geological and geotechnical properties. Blast design variations in these
Aug 24, 2015
-
Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade OptimisationBy C A. Myburgh, S Craig, K Deb
In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen
Nov 24, 2014
-
Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk QuantificationBy M W. N Buxton, M T. Bootsma, J Benndorf, C Alford
Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti
Nov 24, 2014
-
Developing Mineral Reporting CompetencyBy J Coombes
The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma
Aug 22, 2011
-
A Modified Software Tool for Mine Waste Rock Dump PlanningBy Z Fu, E Topal, O Erten
"Mine waste rock management involving waste rock movement and placement, is a critical aspect in the planning of open pit mining operations, as the waste rock haulage cost can be the largest portion o
Nov 15, 2016