Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    "Computer Simulation of the Direct Iron Reductionin MIDREX Ovens"

    By A T. Bernardes

    Using the cellular automata computational technique it was possible to simulate the generation and discharge of an iron ore pellet pile inside a direct iron reduction oven, as well as to calculate the

    Sep 26, 2011

  • AUSIMM
    Capital Expenditure Modelling for Strategic Mine Scheduling

    By L Blackwell

    Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea

    Nov 24, 2014

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Planning for Commercial Operation of the Honeymoon ISL Uranium Project

    A recoverable uranium resource, shown to be suitable for in situ leaching, was discovered at Honeymoon in South Australia in 1971. Exploration of the deposit was carried out during the period from 197

    Jan 1, 2002

  • AUSIMM
    Acousto Ultrasonic-Echo (AU-E) and Ultrasound Technology ù Determination of the Lining and Cooling Element Condition of Operational Furnaces

    By A Sadri, S Smith

    In the metal and mineral industry, different empirical techniques are used to estimate the remaining thickness of the lining within an operating furnace. The disadvantage and costly factor when using

    Jan 1, 2006

  • AUSIMM
    A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning

    By C Niemann-Delius

    The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new

    Sep 26, 2011

  • AUSIMM
    Understanding Trends in Performance of Open Cut Mining Equipment

    By G Lumley

    PlannersÆ optimism (or maybe commercial necessity) means that most mine plans use equipment rates that are rarely achieved (Lumley and Beckman, 2009). This lack of understanding of what equipment actu

    May 24, 2012

  • AUSIMM
    Project Selection and Process Development for Mining Juniors

    By L Lorenzen, H Muller

    "Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th

    May 24, 2012

  • AUSIMM
    "Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"

    By A Esfahanipour, M Osanloo

    Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en

    Sep 26, 2011

  • AUSIMM
    Comparison of Excavation Methods in Different Ground Conditions with the Decision Aids for Tunnelling

    By F Sandrone, J-P Dudt, J Zhao, E Paltrinieri

    Tunnel boring machines (TBMs) excavation is nowadays more and more considered a valuable alternative to conventional tunnelling. As a matter of fact, thanks to its advantages such as greater rate of a

    Sep 17, 2014

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    Screen Media Aperture Size Measurement Using MetsoÆs Screen Tracker

    By G van Niekerk, M Wortley

    Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.

    Sep 26, 2011

  • AUSIMM
    Dingo – an optimisation tool to solve complex short interval control at Telfer underground mine

    By S Graskoski

    The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont

    Oct 16, 2017

  • AUSIMM
    Reproduction of inequality constraint between iron and silica for accurate production scheduling

    By N Madani, S Abulkhair, N Morales

    Conventional geostatistical algorithms cannot reproduce bivariate complexities such as inequality constraint, nonlinearity and heteroscedasticity. Poor reproduction of these features may decrease the

    Nov 8, 2021

  • AUSIMM
    Bowen Basin Coalmine Spoil Classification for Improved Mine Rehabilitation Outcomes

    By T Baumgartl, J Burgess, B Emmerton, P D. Erskine

    Large-scale open cut mining in the Bowen Basin has been undertaken for over 40 years. During this period, improved mechanical capability and economics have allowed extraction to greater depths, result

    Jun 28, 2016

  • AUSIMM
    Blast Fragmentation Impacts on Downstream Processing at Goldfields Cerro Corona

    By D La Rosa, K Caron, H Mamani, W Valery, R Diaz

    The Gold Fields Cerro Corona copper-gold deposit in Peru has heterogeneous rock characteristics in terms of its mineralogical, geological and geotechnical properties. Blast design variations in these

    Aug 24, 2015

  • AUSIMM
    Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation

    By C A. Myburgh, S Craig, K Deb

    In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen

    Nov 24, 2014

  • AUSIMM
    Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk Quantification

    By M W. N Buxton, M T. Bootsma, J Benndorf, C Alford

    Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti

    Nov 24, 2014

  • AUSIMM
    Developing Mineral Reporting Competency

    By J Coombes

    The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma

    Aug 22, 2011

  • AUSIMM
    A Modified Software Tool for Mine Waste Rock Dump Planning

    By Z Fu, E Topal, O Erten

    "Mine waste rock management involving waste rock movement and placement, is a critical aspect in the planning of open pit mining operations, as the waste rock haulage cost can be the largest portion o

    Nov 15, 2016