Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dust and diesel characterisation in underground coalmines

    By N LaBranche

    The resurgence of Silicosis and Coal Worker’s Pneumoconiosis (CWP) in coalmines has placed the spotlight back on the management of worker exposure to particulate matter across all mining sectors (Coal

    Oct 12, 2022

  • AUSIMM
    Planning for (not so) final land use

    By J Durbin

    To effectively plan for closure, we must have an end-point in mind. To undertake meaningful rehabilitation, a post-mine land use (or uses) must be known. However, it is becoming more apparent that th

    Jul 25, 2018

  • AUSIMM
    Doing the Right Things Right ù Identifying and Implementing the Mine Plan That Delivers the Corporate Goals

    By B Hall

    The authors have undertaken many independent mine optimisation and operational improvement projects at Australian and international mining operations over the past decade. This work has provided an un

    Jan 1, 2006

  • AUSIMM
    Accreditation

    David Pollard will raise this matter in more aetail in a later paper, but mere are some obvious points that I wish to make. It is a relatively straightforward exercise to assess the competency at a l

    Jan 1, 1994

  • AUSIMM
    Effect of Dynamic Pressure on Electronic Detonator Timing

    By R Ibarra, H Solis, G Teowee, B E. Papillon

    The authors have previously described a piezoelectric-based system to measure the dynamic pressure during actual detonation in the field. This technique is used in a water hammer test set-up where a d

    Aug 24, 2015

  • AUSIMM
    Improving tungsten recovery through the reuse of mine wastewater

    By Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen

    Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the

    Aug 24, 2022

  • AUSIMM
    The Design and Installation of a Booster Fan at Tahmoor Colliery

    By M Ogle

    "Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the

    Jun 1, 2012

  • AUSIMM
    Iron RoadÆs Prediction of Magnetite Concentrate Production from the Central Eyre Iron Project

    By P J. Marsh, P J. Bartsch, N J. Semler

    Iron Road Limited is currently studying the feasibility of producing 20 Mt/a of high-grade (67 per cent Fe) magnetite concentrate from a 2.6 Bt resource (JORC) located at Warramboo on the central Eyre

    Aug 12, 2013

  • AUSIMM
    A Practitioners View of DCF Methods in Mineral Valuation

    Discounted cash flow (DCF) methods are well suited and recommended as a primary valuation method for mineral assets for which there are at least indicated resources and some form of feasibility stu

    Jan 1, 1994

  • AUSIMM
    The Compilation and Presentation of The Description of Operations with Particular Reference to Cyanide Operations

    The Queensland Department of Mines believes it is in the best interests of the gold mining industry to reduce and control the environmental impacts from gold mining since that is the community expecta

    Jan 1, 1986

  • AUSIMM
    Recovery of the northern mining block at Cliffs Nickel Mine

    By M Hopkins, A Mutale, A E. Vidal da Silva

    The Cliffs Nickel Mine extracts a narrow near vertical nickel vein using a mining method of underhand bench stoping with paste backfill. In 2014, at a depth of 400 m below surface, the Northern block

    Mar 15, 2021

  • AUSIMM
    Physical and Technical Evaluation of Possibility Using Low-density Explosives in Smooth Blasting

    By I Y. Maslov, S A. Gorinov

    It was demonstrated that the stable propagation of the explosive process is possible in low-density emulsion explosives (EEs) obtained through mixing of emulsion with a significant amount of expanded

    Aug 24, 2015

  • AUSIMM
    The Influence of Surface Geometry on the Load Transfer Mechanisms of Grouted Bolts - A Laboratory Study

    By B Indraratna, A Dey

    The surface geometry of a rock bolt plays a very important role in the rock/resin/bolt load transfer mechanism. Very little work has so far been reported on the influence of the bolt surface geometry

    Jan 1, 2000

  • AUSIMM
    A Numerical Model to Simulate the Effectiveness of Remedial Measures Aimed at Reducing Acidity and Metal Concentrations in the Ngakawau River and its Tributaries Near Stockton Coal Mine, West Coast, New Zealand

    By P Lindsay

    A numerical model has been developed to simulate the effectiveness and costs of a number of conceptual remedial measures aimed at reducing acidity and metal concentrations in the Ngakawau River and it

    Jan 1, 2006

  • AUSIMM
    Analysis and Management of Loads on Paste Backfill Barricades

    By M Fahey, A B. Fourie

    Over the past ten years, the mining industry has witnessed the introduction of a new and innovative mine filling technique known as paste fill, which consists of placing full stream tailings with smal

    Jan 1, 2008

  • AUSIMM
    Mechanical Agitation in the Carbon-in-Pulp Process

    By McDonough RJ

    Mechanical agitation is the preferred system for Carbon-in-Pulp processes. Agitator design requires an understanding of the relationships between energy, shear and flow and the nature of shear rates

    Jan 1, 1982

  • AUSIMM
    Application of Leading Practice Spontaneous Combustion Assessment to Exploration at the Doyles Creek Project

    By J Edman, RáBeamish, G Cambourn, B Beamish

    Moist Adiabatic Benchmark (MAB) and R70 testing have been applied to core samples of a multiple seam sequence from a borehole at the Doyles Creek Project. The coal samples range in rank from high vola

    Jul 1, 2013

  • AUSIMM
    Experience with FloCEP® Slurry Flow Conditioning at Evolution Mining’s Edna May Operation

    By S H. Algie, D P. Taplin, S G. Doig

    "Suboptimal performance of clusters of hydrocyclones (cyclones), relative to the performance of the individual cyclones that comprise the cluster, is a common phenomenon. The primary cause is well kno

    Oct 10, 2016

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016

  • AUSIMM
    The Theory and Operation of a Laboratory Electrostatic Separator

    The process of electrostatic separation was developed in the late 19th century, but did not make much headway for about 25 years. High dc voltages, of the order of 20 kilovolts, are involved, and the

    Jan 1, 1950