Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A quantitative risk assessment tool for geothermal outbursts at Lihir Gold Mine

    By M Zoorabadi, Y Zhang, D Bringemeier, S Nicoll, N Kerr

    Lihir operations of Newcrest Mining Limited (NML) are on Lihir Island (PNG) which is located approximately 900 km north-north-east of the national capital Port Moresby. The mine is located within the

    Nov 29, 2022

  • AUSIMM
    Pillar Extraction and its Relation to Surface Movement

    Surface subsidence caused by coal mining operations was the subject of a very successful symposium organised by the Illawarra Branch of The Australasian Institute of Mining and Metallurgy in February,

    Jan 1, 1980

  • AUSIMM
    Predictive spatial modelling of rock mass properties using machine learning techniques

    By J Q. Shi, M Karakus, Y Liu

    Predicting the spatial distribution of rock mass properties in cave mining is a critical challenge. In this study, we introduce a novel machine learning-based model to advance our comprehension of roc

    Sep 1, 2024

  • AUSIMM
    Processing Copper-Gold Ore at Ok Tedi

    By Kanau JL, Kilgour I

    This paper describes the metallurgical processes at the 80 000tpd Ok Tedi Mining Limited concentrator, which treats copper- gold ore by single-stage crushing, SAG and ball milling and flotation to

    Jan 1, 1991

  • AUSIMM
    Towards an understanding of production costs at Australia’s underground gold mines

    By A Trench, S Ulrich, S Hagemann

    A synthesis of reported All-In Sustaining Costs (AISC) for 57 Australian gold mines in the period 2014–2016 reveals for the first time the clear influence of grade upon cost performance, most evident

    Oct 16, 2017

  • AUSIMM
    Conceptual Design of a Dry-stacked Coal Rejects Facility in a Subtropical Climate

    By A M. Barrett, P J. Chapman

    As filtering technology improves and there is an increased focus on environmental impacts, the concept of managing fine coal rejects by filtering, mixing with coarse rejects and dry stacking them is b

    Jul 27, 2015

  • AUSIMM
    A Proposed Modification of the Square Set

    By A. J. MOORE

    When the writer first saw the square-set timbering, he was at once impressed with the fact that the frames made by the sets, along the lode and across it, were composed of panels with rectangular open

    Jan 1, 1912

  • AUSIMM
    Reaping the First Fruits – Infrared Spectroscopy: the New Standard Tool in BHP Billiton Iron Ore Exploration

    By M Haest, O Dominguez, D Mittrup

    With the current focus in the mining industry on reducing costs, while simultaneously improving ore quality, infrared spectroscopy is a tool that can potentially assist companies to meet both challeng

    Jul 13, 2015

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 2

    By N Clarke, J Hunt, A Barros, N Guerrero, L Keeney

    Grade Engineering® (GE) involves a range of integrated technologies and operating protocols for improving effective feed grade through early rejection of low value material prior to costly processing

    Nov 10, 2020

  • AUSIMM
    Direct Chill Casting of Aluminium and its Application at Comalco Aluminium (Bell Bay) Limited

    Over half of the molten aluminium produced at the 52,000 tons/ year eapacity plant operated by Comalco Aluminium (Bell Bay) Limited in Tasmania is cast into saleable produets by the direct chill proce

    Jan 1, 1967

  • AUSIMM
    Roof Bolting Practice in the Collieries of Australian Iron and Steel Pty. Ltd.

    Present roof bolting practices in the collieries of Australian Iron and Steel Pty. Ltd. are outlined. Roof support has been improved since introducing roof bolts and it is hoped to increase the reliab

    Jan 1, 1961

  • AUSIMM
    An Examination of Some Trace Elements in South Wales Coals

    By Pooley F. D

    The coal measures of the South Wales coalfield contain at least 50 horizons at which coal seams are known, to occur. More than 300 samples of coal were collected from these coal measures and this pape

    Jan 1, 1977

  • AUSIMM
    Flotation of Lithium and Beryllium Pegmatites (427a6d82-fb39-4583-b35b-3c6431d40947)

    By Moskovits E. E

    Spodumene was recovered from pegmatite by flotation in laboratory and pilot-plant tests using an anionic collector emulsion. A similar process applied to beryl pegmatite gave encouraging results.INTRO

    Jan 1, 1963

  • AUSIMM
    Good Delay Timing-Prerequisite of Efficient Bench Blasts

    Variations in delay timing can have a marked influence on blasting effectiveness and, hence, on total production costs. In single-row bench blasts, delay firing is invariably more effective than simul

    Jan 1, 1977

  • AUSIMM
    Probability Analysis of Rock and Soil Slopes in a Complex Geology Environment

    In the stability assessment of open pit walls, geotechnical engineers have to deal with uncertainty related to structural geology, rock mechanical parameters, groundwater and so on. This uncertainty

    Jan 1, 1997

  • AUSIMM
    Production and Ventilation Management Towards in Integrated Mine Information System

    By Ward M

    The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.

    Jan 1, 1995

  • AUSIMM
    Uranium-Molybdenum Mineralization at Ben Lomond, Hervey Range, North Queensland, Australia

    By Cocquio D. S, Bauchau C

    In the course of an integrated airborne survey in 1975, a uranium-molybdenum deposit was discovered by Minatome Australia Pty Limited in North Queensland, Australia, approximately 70 km by road west o

    Jan 1, 1980

  • AUSIMM
    A SAG Mill Circuit Simulator Based on a Simplified Mechanistic Model

    By Magne L, Barria J, Castro O, Menacho J, Gonzalez GD

    An extensive experimental campaign was developed in a continuous 6 x 2' (D x L) pilot scale SAG mill. The effect of the feed flow rate, feed solids concentration, ball filling fraction and feed

    Jan 1, 1993

  • AUSIMM
    A Cubanite Ore From The North Mine Broken Hill, N.S.W.

    The mineralogy and textures of a portion oC ore from the 25 level northern orebody, North mine, Broken Hill are described. This ore, in places, contains up to 70 per cent cubanite (CuFe2S3 ) which has

    Jan 1, 1969

  • AUSIMM
    Study on Rational Process Flow Sheet for Beneficiating Low-Grade Cu, Mo, Bi, S, W Polymetallic Ore

    Study on Rational Process Flow Sheet for Beneficiating Low-Grade Cu, Mo, Bi, S, W Polymetallic Ore

    Sep 13, 2010