Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Advanced visual perception in mining – multimodal fusion and enhancement

    By C Xu, B Li

    Multi-sensor fusion visual perception technology significantly enhances visual perception capabilities in complex and harsh environments by combining visual data from different sensors. This technolog

    Sep 1, 2024

  • AUSIMM
    Rapid Logging of Different Magnetic Phases in Banded Ironstones Using a Travelling Three-component Vector Magnetometer

    By C A. Foss, K Leslie, C Arnold

    Magnetic susceptibility measurements provide rapid, non-destructive testing of drill core, but cannot directly map magnetite and/or hematite content. Combined magnetic susceptibility and magnetisation

    Jul 13, 2015

  • AUSIMM
    Analysis of jig behaviour in coal preparation plants in China

    A wide-ranging base of jig data was collected from various types of commercial jigs in 9 coal preparation plants in China, and a complete data analysis was made. It was found that the sharpness ofsepa

    Jan 1, 1986

  • AUSIMM
    Reducing Mining and Mineral Processing Plant Fatality Rates

    By N Cann

    In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali

    Aug 8, 2011

  • AUSIMM
    Noise Reduction in Compressed Air Driven Fans

    The development of a noise attenuated compressed air driven fan is described. The fan, which employs the jet reaction principle, possesses blade extension pieces which penetrate into an acoustically t

    Jan 1, 1973

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021

  • AUSIMM
    Proper Tyre Management Reduces Tyre Costs (8cc3f990-94b6-4b55-8abb-8c65d8f8d45b)

    By Gordon DM

    Tyres account for 25-30 per cent of the operating costs of large capacity haul units as used in open-cut mines.Tyre operating costs can be substantially reduced and often contained in real terms by ap

    Jan 1, 1983

  • AUSIMM
    A Cubanite Ore From The North Mine Broken Hill, N.S.W.

    The mineralogy and textures of a portion oC ore from the 25 level northern orebody, North mine, Broken Hill are described. This ore, in places, contains up to 70 per cent cubanite (CuFe2S3 ) which has

    Jan 1, 1969

  • AUSIMM
    Age-dependent Changes in Post-cracking Performance of Fibre-reinforced Concrete for Tunnel?Segments

    By E S. Bernard

    Toughness testing of fibre reinforced concrete (FRC) at 28 days age is typically undertaken as part of quality control for the many applications where fibres are used in concrete, including shotcrete,

    Sep 17, 2014

  • AUSIMM
    Thermodynamics of Metal-Interstitial Solutions

    Thermodynamic properties of the solutions of hydrogen in metals and carbon in austenite were investigated and it is possible to predict the interstitial solubility in these systems over relatively wid

    Jan 1, 1970

  • AUSIMM
    Presidential Address, 1979: The Mining Industry-the Key to Social Change

    Perhaps one of the most important conferences or symposia which our Institute has conducted, was the joint Aus. LM.M./AJ.M.E. meeting held in Canberra in May 1978, with the theme International Resourc

    Jan 1, 1979

  • AUSIMM
    High Speed Development Work at Emperor Mine, Vatukoula, Fiji

    With the exhaustion of orebodies close to the main haulage shaft of the Emperor mine, an increased rate of development, aimed at earlier investigation of values disclosed by exploration drill holes ha

    Jan 1, 1966

  • AUSIMM
    An Example of Low Working Costs

    THE following brief paper is submitted with a view to encouraging the exploitation of hitherto neglected 10w~ grade ore-bodies which are suitable for extraction by open-cut methods.The Corinthian Nort

    Jan 1, 1915

  • AUSIMM
    Recovery of Tin from Tinhouse Scruff Metal

    A modified liquation technique was developed for recovering tin from tinhouse scruff metal or hardhead containing about 10 per cent iron and 15 per cent occluded flux, palm oil, and moisture. This was

    Jan 1, 1969

  • AUSIMM
    Examination of Bit Wear in Rock Drilling Through Wavelet Analysis

    Laboratory tests were conducted to study the effects of thrust or pull-down force and rotary speed on the vibration signatures of a particular drill in a known rock type, and to determine how the vibr

    Jan 1, 2000

  • AUSIMM
    Physical modelling of tailings dam breach: exploring overtopping following shear failure

    By W A. Take, M McKellar, A Walsh, S McDougall, S G. Evans

    Recent tailings dam failures have heightened public awareness of the hazard posed by storage facilities for mining waste, illustrating the need for a more critical examination of tailings dam breach m

    Jul 1, 2021

  • AUSIMM
    Improvement in Iron Ore Agglomeration Through Design Modification in Coke Crushing Plants

    By B K. Da, S A. Balaji, G P. Roy, T K. Dutta

    The raw material handling complex at the Durgapur steel plant provides iron ore, crushed coke and flux to two sinter plants. Either some facilities were not envisaged or not properly designed before t

    Jan 1, 2005

  • AUSIMM
    Driving Future Tunnels with Mechanical or Explosion Energy - A Blasting Engineer's View

    The current drill-and-blast method of tunnelling is cyclic and, for this reason above all others, has a future application potential which is lower than that of continuous methods. There is scope

    Jan 1, 1987

  • AUSIMM
    Estimation of Flyrock Travel Distances: A Probabilistic Approach

    By M F. L Gibson

    The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f

    Jan 1, 2001

  • AUSIMM
    Mine Stores

    The following data are put together to assist those who are responsible for ordering stores for mines and works. When making out a list of mine stores for a new plant, one can hardly be expected to re