Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sensible Cost Cutting for Resource Projects

    By D Connelly

    As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c

    Aug 8, 2011

  • AUSIMM
    Chemical and Physical Control of Mineral Slurry Processing

    By White L. R, Boger D. V

    The paper describes the surface chemistry and particle physics that control the fundamental flow properties (Theology) of mineral particle slurries. We further address, through a series of case stud

    Jan 1, 1992

  • AUSIMM
    Safety and Financial Value Created by Good Slope Management Strategies and Tactics

    By A R. Bye, T R. Stacey

    Anglo PlatinumÆs Potgietersrust Platinums (PPRust) operates three open pits and plans to excavate 90 Mt of rock in 2007. With pit slopes expected to reach a height of 400 m, the geotechnical departmen

    Jan 1, 2007

  • AUSIMM
    High-voltage pulse pre-concentration study using a low-grade copper-gold ore

    By F Shi, W Huang, D Seaman, K Runge

    High Voltage Pulse (HVP) technology is a novel process that could potentially be the step-change needed in ore processability in the mining industry. The propensity of high voltage pulses towards mine

    Aug 29, 2018

  • AUSIMM
    The Benefits of Mine Scale Three-Dimensional Structural Modelling at Macraes Mine, Central Otago – A Case Study

    By A J. Daniels

    Macraes Mine is a large-scale open-cut and underground gold mine located in Central Otago, on the South Island of New Zealand. This paper presents the role of geological mapping in the grade control p

    Aug 22, 2011

  • AUSIMM
    Ore Selection Optimisation for an Iron Ore Deposit Using Linear Programming

    By M Aros, L Reilly

    Iron ore is normally sold in bulk at certain specifications. These include iron grade and specific contaminant grades, typically silica, alumina, phosphorous and sulfur. These target grades are normal

    Nov 24, 2014

  • AUSIMM
    Underground Information Technology Infrastructure - A Sound Basis for Efficient Future Mining Operations

    By M Schmid

    German hard coal mining operations have decreased for more than 40 years. Current political decisions are leading to a discontinuation of subsidised black coal mining by the year 2018. This decision w

    Jan 1, 2008

  • AUSIMM
    Cooling Pathways for Deep Australian Longwall Coal Mines of the Future

    By B Belle, M Biffi

    Cooling of coal mines in the Bowen Basin, characterised by steep geothermal gradient, is presently achieved mostly through rental surface bulk air cooling in summer months. This paper argues that futu

    Jul 1, 2013

  • AUSIMM
    A guide to maximising ball mill circuit classification system efficiency (CSE), for operators and equipment designers

    By O Arafat, R E. McIvor, K M. Bartholomew

    It is well known in the industry that good classification system performance is vital to efficient ball mill circuit performance. But what is meant by good classification system performance, and how i

    Aug 29, 2018

  • AUSIMM
    Mine to Tunnel Scale Discontinuum Simulation of Repeated Dynamic Loading of Mine Excavations

    Underground excavations are subjected to complex stress changes caused by nearby mining, but may also be affected by repeated dynamic loading from blasting and seismic events. In some cases, the combi

    Nov 25, 2010

  • AUSIMM
    Resource Modelling and Mine Design at Obuasi Mine, Ghana

    By C K. Boafo, J Visser

    Obuasi Mine in Ghana, with more than 100 years of mining history, developed from a surface operation into a deep >2000 m underground gold mine. The challenge is to extract value from narrow veins l

    Jan 1, 2008

  • AUSIMM
    Testing new estimation techniques – rank and replace: a stockwork case study

    By D Finn, D Kentwell

    Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-

    Sep 20, 2017

  • AUSIMM
    Method Selection for Large-Scale Underground Mining

    As has been the case since the early Phoenician traders, the minerals used by modern man come from deposits scattered around the globe. The price received is more and more being set by worldwide suppl

    Jan 1, 2000

  • AUSIMM
    The Application of Value Engineering Principles to Mining Studies

    By T Schrimpf, I Bryan

    The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the

    May 24, 2012

  • AUSIMM
    Forecast the mineral processing destinations based on spatial interpolation of geometallurgical variables

    By N Madani, Y Abildin, E Topal

    Mine planning is a crucial part of all mining industry projects, and nowadays, geometallurgical mapping through advanced computer technologies provides an opportunity to involve metallurgical response

    Nov 21, 2018

  • AUSIMM
    Glencore Mount Isa lead zinc flotation circuit – experiences from the implementation of model predictive control

    By A Price, D Okle, K Brooks

    The operation of flotation plants has been improved over the years by use of fundamentally based design techniques, a better understanding of reagent chemistry, online metal analysis and the use of di

    Aug 29, 2018

  • AUSIMM
    Value in Use ù Developing an Improvement Program for Success

    By M Gill, A Mathias

    The mining industry has always been cost-focussed but in recent times mining companies have moved towards obtaining a competitive advantage through the implementation and sustainability of best practi

    Jan 1, 2004

  • AUSIMM
    Geostatical Production Grade Estimation in Mount Isa's Copper Orebodies

    This paper describes a detailed geostatistical study of producing copper orebodies at Mount Isa Mines Limited in Queensland, Australia. As a result of this work, kriging has been adopted for grade est

    Jan 1, 1982

  • AUSIMM
    Direct observation of the fayalite slag formation behaviour from large SiO2 grains

    By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami

    The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea

    Jun 19, 2024

  • AUSIMM
    Upgrading Low-grade Gold Ore Stockpiles by Preconcentration Using Ore Sorting – an Assessment of the Economic Impact and Viability

    By A N. Parry, G van Wyk

    "Sensor based automatic ore sorting technologies are used in the minerals industries to efficiently remove waste and submarginal grade material from crushed and screened run-of-mine (ROM) ore, produci

    Oct 10, 2016