Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Properties of Surface Films on Chalcopyrite and Pyrite and their Influence in Flotation

    By Chander S

    Properties of surface films on chalcopyrite and pyrite differ due to variations in the mechanism of oxidation of the two minerals. In the case of chalcopyrite the first step in the oxidation is the

    Jan 1, 1993

  • AUSIMM
    Pre-Splitting - Wall Control for Surface Coal Mines

    By Cocker A

    Pre-splitting for smooth highwall formation is conducted in around 75 per cent of surface coal operations within Australia. The CMTE (Centre for Mining Technology and Equipment) in conjunction with

    Jan 1, 1995

  • AUSIMM
    The Mount Leyshon Gold Mine (NE Queensland), an Intrusive Breccia and Igneous Complex

    By Orr T. O H, Hodkinson I. P

    The Mount Leyshon breccia complex is located on an east-west trending contact between Cambrian metasediments (Puddler Creek Formation) and the Ordovician Mt. Leyshon granite, within the Lolworth-Rav

    Jan 1, 1991

  • AUSIMM
    From Production to Sustainability Reporting - Towards Quantifying Sustainable Gold Mining

    Gold mining in Australia and globally has a long and variable history. In recent years, due to ongoing public concern over long-term environmental impacts, the mining industry globally has been moving

    Jan 1, 2007

  • AUSIMM
    Technology Based Innovation - The Next Decade

    The minerals industry focus over much of the past twenty years has been on cost reduction and production growth supported, but not driven, by technology improvements. Mergers and acquisitions, and the

    Sep 13, 2010

  • AUSIMM
    The Sams Creek Peralkaline Granite Hosted Gold Deposit, Northwest Nelson, New Zealand û Evolution of the Host Granite and Mineralising System

    By K Faure

    At Sams Creek a gold-bearing, peralkaline granite pophyry dyke intrudes Ordovician-Silurian metapelite and quartzite. The granite porphyry dyke has a thickness of up to 40 m, extends discontinuously f

    Jan 1, 2004

  • AUSIMM
    Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) Mine

    By K Rozlapa, P Waters, H Middlemis

    A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s

    Jan 1, 2006

  • AUSIMM
    Overcoming Mine Design and Production Challenges at the Sinclair Underground Nickel Project

    By M J. Ireland, D P. Horne, S J. Simpson

    The Sinclair Nickel Project, wholly owned by Xstrata Nickel Australasia (XNA), includes an underground mine, a concentrator, a village, an all-weather airstrip and associated mine infrastructure. The

    Mar 26, 2012

  • AUSIMM
    Addressing the Root Causes of Deviations in Reconciliation and Value Tracking

    By W van der Westhuizen

    Mining professionals recognise the need and application for reconciliation and value tracking. It is necessary however to examine our current reality, and evaluate the following. Do our reconciliation

    Jan 1, 2002

  • AUSIMM
    Geoscience Rating for Valuation of Exploration Properties - Applicability of the Kilburn Method in Australia and Examples of its Use

    By Eupene GS

    The valuation of exploration properties which contain no identified resources or reserves is the most subjective of all valuation tasks likely to be carried out by a geologist. The geoscience ratin

    Jan 1, 1994

  • AUSIMM
    Construction Costs

    By Cerutty L

    To those who have been engaged in the construction of mining and metallurgical plants during the war and post-war periods, it is quite unnecessary to point out the large increases and violent fluctuat

    Jan 1, 1922

  • AUSIMM
    Laboratory Experiments of As(V) and As(III) Sorption Onto Pit-Lake Sediments From Three Different Orebody Types

    By D L. Decker, G C. Miller, C Papelis

    Arsenic, often associated with precious metals ore deposits, is a major contaminant released during large-scale gold mining. Because of the complex oxidation/reduction and sorption behaviour of As, pr

    Jan 1, 2003

  • AUSIMM
    Design of a Steel Fibre Reinforced Concrete Segmental Tunnel Lining - City West Cable Tunnel Project, Sydney, Australia

    By A Kuras

    Segmental tunnel linings are becoming more common in Australia. One current project employing a segmental lining is the City West Cable Tunnel (CWCT) in Sydney. The project has been commissioned by En

    Jan 1, 2008

  • AUSIMM
    The Youga Gold Project - A West African Project Financing Case Study

    The Youga gold mine in Burkina Faso, West Africa, is scheduled to produce first gold in the third quarter of calendar 2007. The project is expected to produce 540 000 oz of gold over 6.5 years, from a

    Jan 1, 2007

  • AUSIMM
    Seismic Monitoring at the Fimiston Open Pit Kalgoorlie Consolidated Gold Mines (KCGM)

    By J J. Jiang, M Reimnitz

    The Kalgoorlie Consolidated Gold Mines (KCGM) Fimiston Open Pit is mining through a dense network of disused level workings and open stopes of greatly varying sizes. The condition of the stope crowns

    Jan 1, 2003

  • AUSIMM
    Hot Strip Mill at Australian Iron and Steel Limited, Port Kembla

    The completion of the Hot Strip Mill at the Port Kembla works of Australian Iron & Steel Ltd., makes possible the production of steel plates and wide strip of a quality and in quantities not possi

    Jan 1, 1956

  • AUSIMM
    The Geology of the Bowen and Galilee Basin Coalfields

    The economically significant seams in the Bowen Basin fall into four age groups, two in the Lower Permian and two in the Upper Permian. Coal deposition in the Galilee Basin did not commence until lat

    Jan 1, 1975

  • AUSIMM
    On-Line Cyanide Analysis and Control

    Cyanide is a significant contributor to the cost of producing gold. Any reduction in cyanide consumption that is achieved through more reliable measurement, and/or more efficient management of cyanide

    Jan 1, 1997

  • AUSIMM
    using Simulation to Assess the Impact of Improvements in Drill and Blast on Down Stream Processes

    A simulation model of the load and haul process where the loader cycle has been subdivided into its individual components is used to consider the benefits derived from improved drill and blast metho

    Jan 1, 1998

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian mining industry, possibly as a consequence of the downturn in mar

    Jan 1, 1999