Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimum Determination of Sub-Grade Stockpiles in Open Pit Mines

    Depending on material commodity market conditions, material contained in open pit waste disposals can hold potential value, Segregating subgrade material into separate disposals i.e. 'sub ore&apo

    Jan 1, 1988

  • AUSIMM
    Ore Reserve Reporting Practices of Major Australian Mining Companies

    In recent years stricter requirements imposed variously by the Companies Acts, auditors and the Stock Exchanges have resulted in annual financial statements of mining companies becoming more detail

    Jan 1, 1981

  • AUSIMM
    Reactions Occurring at the Anode During Aluminium Electrolysis

    By Welch B. J

    Results obtained from linear sweep voltammetry at a graphite anode in cryolite-alumina melts are presented, together with those obtained from a chronopotentiometric investigation of the influence of d

    Jan 1, 1976

  • AUSIMM
    Influence of Investment in Machine Repairing on Machine Life

    This paper suggests the models for determination the optimum life of machines on the basis of sum and difference of investment and maintenance costs. The economic-mathematical models are based on comp

    Jan 1, 2003

  • AUSIMM
    Optimising Grade Control Procedures in Large and Small Open Pit Mines

    By Khosrowshahi

    A scientific approach to analysing grade control has been applied at a number of mining operations. By dividing the grade control process into the various stages of data collection and interpretation,

    Jan 1, 1992

  • AUSIMM
    The Effect of Surfactants on the Dewatering of Fine Coal

    An experimental study of the influence of surface active agents on the dewatering of fine coal was undertaken with a view to evaluating the usefulness of such materials in reducing the residual moistu

    Jan 1, 1976

  • AUSIMM
    Copper Tank House Technology Reviewed and Assessed

    The present practices in electro-refining of copper are shown to be the result of piecemeal and gradual improvements and innovations as metallurgists responded to changing cost pressures and the avail

    Jan 1, 1985

  • AUSIMM
    Recent Developments in Chloride Hydrometallurgy

    By Canterford JH, Ritcey GM

    With the development of new technology and materials of construction, chloride-based hydrometallurgical routes have gained accept- ance as a viable alternative to sulphate-based routes. A number of

    Jan 1, 1984

  • AUSIMM
    Production of Zirconia from Zircon Sands

    By Sinha NH

    ICI Australia and CSIRO have developed a novel process for extraction of zirconia from zircon sands. The two stage process involves a high temperature step and a wet chemical processing step. A pilot

    Jan 1, 1986

  • AUSIMM
    Slope Stability Analysis at Granite Quarry With Complex Geological Structure ù Case Study at Granite Quarry, Karimun Island, Indonesia

    By B Sulistianto, D Carrugan a, R K. Wattimena

    Geological structure at PT Karimun Granite Quarry, in Karimun Island û Indonesia, has three primary joint sets that cross between them. These primary joint sets are the principal factor influencing th

    Jan 1, 2003

  • AUSIMM
    GRD Macraes Limited ù Over a Decade of Sustainable Development in New Zealand

    GRD Macraes Limited, owners and operators of the Macraes and Reefton Gold Project in New Zealand, have taken up the challenge of sustainably producing in excess of 300 000 ounces per annum within five

    Jan 1, 2002

  • AUSIMM
    Chemical Optimisation of Smelting Processes

    By Floyd JM

    Conventional smelting reactor systems were designed to recover only one main element from their feedstocks. They did not possess sufficient flexibility to allow optimisation of co-production of multip

    Jan 1, 1985

  • AUSIMM
    Excavation Design and Ground Support of the Gyratory Crusher Installation at the DOZ Mine, PT Freeport Indonesia

    By A Mulyadi, J Barber, R Golden

    The Deep Ore Zone (DOZ) underground mine will be a 25 000 tpd mechanised block cave operation starting production in 2000. The ore handling system consists of a direct truck dumping 54 +74 gyratory cr

    Jan 1, 2000

  • AUSIMM
    Servicing the Mining Industry - The Mt. Newman Experience

    To the layman or the casual in- vestor, the critical problems in the mining industry appear to rest on the questions of finding and developing an orebody. The high cost of finding a major orebody

    Jan 1, 1975

  • AUSIMM
    Adsorption of Organic Dye Depressants on Carbonaceous Sulphide Ores

    Organic dyes such as nigrosine and sun yellow act as depressants for carbonaceous particles in the, flotation of sulphide ores. Depression is achieved when initially hydrophobic organic surfaces are

    Jan 1, 1975

  • AUSIMM
    Process Control Developments at Queensland Alumina

    The completion of the 3rd expansion at Queensland Alumina added 725,000 t.p.y. capacity to what was already the world's largest alumina refinery. Rated design capacity is now 2.0 million t.p.

    Jan 1, 1974

  • AUSIMM
    Non-Ideal Explosive Performance Prediction Using the CPEX Model

    By Minchinton A

    CPeX is a non-ideal explosive performance prediction model. The model takes into account the rate of energy release, the extent of chemical reac- tion and the effect of confinement on energy release.

    Jan 1, 1988

  • AUSIMM
    MSR Implementation and Progress

    By Ellicott C, Webb N

    In November 1996 the NSW Minister for Mineral Resources, Hon Bob Martin MP, commissioned ACiL Economics and Policy Pty Ltd to conduct a wide ranging review of safety within the New South Wales mining

    Jan 1, 1998

  • AUSIMM
    Latest Developments in HPGR Technology ù Results of a Field Trial

    By N Patzelt, T C. Logan, I B. Klymowsky

    In 2003, NEWMONT MINING CORPORATION, the worldÆs largest gold producer, set out to prove that High Pressure Grinding Roll (HPGR) technology is sufficiently robust and reliable to be considered for the

    Jan 1, 2004

  • AUSIMM
    Risk Assessment for New Technology in the Open Cut - Wambo Dragline

    By Lumley G. I, Duffy W. J

    The risk involved with incorporating new/unfamiliar technology into mines has, in the past, largely been evaluated by the supplier of the technology. The implications on safety and productivity has be

    Jan 1, 1992