Feasibility to Mine Completion – The Real Impacts on Project EconomicsBy J Ranford, A Harris, K Laughton
The Angas Zinc Mine (Angas) is a poly-metallic, underground mine in the Adelaide Hills that has been developed through arguably one of the most volatile financial time periods in living memory. From b
Mar 24, 2014
-
Production Capacity Optimisation in the Presence of Grade UncertaintyGrade uncertainty can have a number of important implications for a mining operation. One of the most significant risks in not considering grade uncertainty in planning is the over or under allocation
Dec 6, 2010
-
Eight competencies of safety leadership excellenceBy A Gibbs
Culture and leadership go hand in hand, especially when it comes to investing in safety. But the reality is that most safety leaders haven’t been taught the fundamental soft skills needed to lead effe
May 5, 2022
-
Fatal Flaws in Technical Due DiligencesBy A J. H Newell
The background and the basis for conducting a Technical Due Diligence are discussed as well as the source information, typical studies and potential limitations. Typical short comings including ‘show-
Sep 7, 2015
-
Studies on Extraction of Refractory Gold and Silver Through Thiourea LeachingBy Akerkar D. D, Dey M. L, Mathur S. B, Chowdhury S. K R
The extraction of gold and silver from chalcopyrite concentrates has been investigated. In view of the recent interest in non-cyanide leachants for gold and silver, one such alternative reagent, nam
Jan 1, 1992
-
Environmental Management of a Traditional Coal Mining SiteBy R Byrnes, P Hensley
The outstanding environmental management initiatives undertaken by Novacoal at its Western Main Site near Lithgow in
Jan 1, 1995
-
Bulk Density of CoalBy Yu A. B
An experimental study of the packing of a coal heap has been carried out. The bulk density of a coal heap is considered as a function of a number of variables, viz flow rate, conveyor belt speed, t
Jan 1, 1991
-
An Evaluation of Pricing and Allocation Methods Under the Crown Minerals Act 1991The Crown Minerals Act provides a new+framework for the management of Crown owned minerals and requires that regard be had for the principles of the Treaty of Waitangi. The Act requires the preparatio
Jan 1, 1992
-
Consolidated Rutle Limited Dredging Operations, North Stradbroke IslandConsolidated Rutile Limited's (CRL) operations incorporate the exploration, mining, processing, marketing and distribution of mineral sands. This paper outlines the current scope of CRL opera
Jan 1, 1986
-
Future Directions in Australian Contract MiningThe Australian underground contract mining industry has grown from almost nothing 25 years ago to the point today where half the countryÆs underground mines are using contractors to produce their ore
Jan 1, 2005
-
Roasting for antimony removal from Greenbushes materials-plant developmentsBy Floyd JM, Richardson P
The extension of theoretical and laboratory studies of the roasting of tantalite and cassiterite concentrates from Greenbushes Tin Limited to pilot and semi- commercial plant developments is detaile
Jan 1, 1986
-
The Development of an Ore Milling TraineeshipTraditionally mill operators have been employed with varying educational backgrounds with little if any formal training in aspects of mineral processing. Pasminco Mining-Rosebery, in line with other
Jan 1, 1991
-
The Use of Design of Experimentation Software in Applied Flotation TestingBy T S. Fayram
The successful application of flotation is now over one hundred years old. However in a practical industrial sense, it still remains predominantly an art rather than a quantifiable science. Moreover,
Jan 1, 2005
-
Optimisation of Flotation Circuit Configuration at PT Newmont Nusa TenggaraBy K McCaffery, R P. Halomoan
Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover
Jan 1, 2007
-
Cemented Rockfill OptimisationùThe Rock Attrition Model and Fill Raise Orientation EffectBy J Szymanski, S Planeta
In pursuit of optimising the cemented rockfill system fragmentation of the aggregate, while travelling through the surface-to-underground aggregate transport raise, was investigated and a æfines estim
Jan 1, 1998
-
Recovering RE with NH<sub>4</sub>Cl Roasting from Bastnasite OreBy Q Xin, X Shengming, C RuÆan, Z Zhigeng a
The optimum defluorinating conditions for Sichuan bastnasite crude ore were determined by orthogonal experiments. Over 95 per cent fluorine in the crude ore was stripped by roasting 30 minutes of the
Jan 1, 2000
-
Mass Transfer Studies for a Pulsed Disc and Doughnut Extraction ColumnBy H R. C Pratt, G W. Stevens
Hydrodynamic and mass transfer performance are presented for a 72.5 mm diameter pulsed disc and doughnut column of the type used by Western Mining Corporation, Olympic Dam Operation, for the extractio
Jan 1, 2000
-
Qualitative Simulation of Continuous-Flow Technology and Working Face Complexes for Underground Mining of Hard OresBy G A. Streltsova
In the paper the main concept of qualitative simulation is determined when computer-aided designing and forecasting of designs of robotised continuous-flow working face complexes for underground minin
Jan 1, 2003
-
Processing of Steelwork Slags for the Building and Construction IndustriesThe energy input requirement to produce the molten slag associated with iron production to the modern Australian blast furnace, is estimated to be 2.OMJ/kg. In converting blast furnace slag to pro
Jan 1, 1979
-
Banking Needs for Project Development Financing (591555b9-102c-4033-a3e1-dcf0b636a120)Some only types of bank finance are appropriate for mining development, with conventional fixed rate finance having significant limitations of flexibility. New, innovative and flexible instruments
Jan 1, 1983