Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Economic Evaluation - It is Time we Cleaned-Out and Smartened-Up our DisciplineCompletion of a project requires two separate money-focused activities, namely economic evaluation of the cash flows underlying the project (before financing) and if the economics look promising, how
Jan 1, 2009
-
Development PhilosophyBy Bruington T, Perkins J, Hutton R
Natural resource developments are among the largest and most challenging projects taking place in the world. They involve capital intensive investment with long lead times and the management of geo
Jan 1, 1997
-
An analysis of impact of weak rock formation on mining-induced deformation of rock slopeBy A Sainoki, D Fukuda, K Shioya, C Zhang, M Sharifzadeh, T Yamaguchi, S Saydam, J Kodama, C A. Amagu, Y Fuji
In an open pit mining, ensuring stability of rock slope has been one of the major challenges. As the instability of rock slopes can results in slope failures; consequently, endanger the lives of worke
Nov 29, 2022
-
Reversing the Trend in Open Pit Mining Equipment OutputBy T Trott, M Lewis, G Lumley
The analysis of equipment trends in The AusIMMÆs revision of Monograph 19 - Australasian Mining and Metallurgical Operating Practices (AMMOP) (in prep) in the paper by Graham Lumley raised some intere
Sep 18, 2012
-
Fuzzy Model of a Multigrade Structure for Support of Decision-Making and Management in Mineral ProcessingBy M J. Pejovic, I Miljanovic, A Milutinovic4, T Benovic, A Petrovski
The paper presents a model of a multigrade monitoring-management structure for support to decision making and management in real and extended time in mineral processing (MP). The model was created as
Sep 26, 2011
-
Viscosity Controlled Production of High-Concentration Backfill Pastes (25c0bb81-3167-4f40-8bbb-0bad87ad79f2)By Mez W
the German ruining industry uses different residues for hackfilling and stowing. A hydraulic pipe conveying technology for these materials has shown advantages for the transportation into the mine.
Jan 1, 1998
-
SUSOP«: Embedding Sustainable Development Principles into the Design and Operation of Resource Extraction and Processing OperationsThough many mining and mineral processing companies have embraced the principles of sustainable development (SD), there is still a significant challenge of applying these in a practical sense, either
Jun 1, 2010
-
RISKGATE« - A Case Study in Application to Fires on Mobile PlantBy J Harris, P Kirsch, D Cliff, M Spinks, S Goater, D Sprott
Fires are a common and recurrent unwanted event in the operation of open pit mines. In most cases, the causes of events such as fires are already æknownÆ but are either overlooked or not fully address
Sep 18, 2012
-
The Value of Geological Human Capital in the Improvement and Maximisation of Ore Deposit Value – The Kalgoorlie Consolidated Gold Mines ExperienceBy D Cooke
In 2010, Kalgoorlie Consolidated Gold Mines (KCGM) was Australia’s largest gold producer, with total annual production of 788 000 ounces. Of the gold produced by KCGM in 2010, 95 per cent was extracte
Aug 22, 2011
-
Simulating Block Cave Secondary Breakage ù An Application of Information and Operations Management Tools in Mass Mining SystemsBy M Scoble, E Rubio
The re-engineering of manufacturing production systems has demonstrated the benefits from using production information for optimising processes. This paper explores the techniques and issues in the ac
Jan 1, 2000
-
Study on Mineral Processing of Refractory Copper-Nickel OreStudy on Mineral Processing of Refractory Copper-Nickel Ore
Sep 13, 2010
-
The Approval of a Gold Mine in the Solomon Islands ù Environmental Planning IssuesThe Gold Ridge Mine is an open-cut gold mine in the Solomon Islands. The mine is owned and operated by Gold Ridge Mining Limited, a wholly owned subsidiary of Ross Mining NL. At the invitation of the
Jan 1, 1999
-
Dense media separation – a valuable process for preconcentrationBy I Grewal, M Lundt
Dense medium separation (DMS) is one of several preconcentration methods used for early waste rejection from run-of-mine ores at relatively coarse particle sizes prior to additional milling and benefi
Sep 11, 2017
-
What Project Managers must Demand from an Economic Evaluation!By P Card
Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de
May 24, 2012
-
Cooling on demand – the next step in ventilation automationBy F C. D Michelin
As mines get deeper, the critical underground temperature limits will be exceeded, and an increasing number of mines will need to implement, expand or modify cooling systems. Surface cooling plants ha
Oct 12, 2022
-
Separation of Nickel and Cobalt from Manganese, Magnesium and Calcium by Synergistic Solvent Extraction - From Batch Tests to Pilot Plant OperationSeparation of Nickel and Cobalt from Manganese, Magnesium and Calcium by Synergistic Solvent Extraction - From Batch Tests to Pilot Plant Operation The synergistic solvent extraction system consistin
Sep 13, 2010
-
Design and Commissioning of a 40 Tonne per Day Flotation Concentrate Bio-Oxidation Treatment Plant at the Harbour Lights MineBy Carter A. J, Miller D. M, Holder N. H M, Van Aswegen P C
The Harbour Lights Mine situated at Leonora in Western Australia, mines a refractory sulphidic gold ore. The main sulphide minerals are pyrite and arsenopyrite. Due to the association of gold with the
Jan 1, 1992
-
Alternative Underground Ore Transport Systems for the Jaguar Base Metal DepositBy W P. Darcey
Jabiru Metals completed a feasibility study on the Jaguar Base Metal Project in July 2005. The study was based on conventional truck haulage via a decline. Conveyor haulage was considered but not in s
Mar 21, 2011
-
Ore Characterisation for Mine to Mill FragmentationBy A Scott, S Kanchibotla, J Segui
The æMine to MillÆ concept is not new. In fact, it is the underlying objective of every mine. Unfortunately, in many operations the management structure and reporting systems have created independent
Jan 1, 2000
-
New Developments in Spirals and Spiral Plant OperationsNew Developments in Spirals and Spiral Plant Operations Records indicate that spiral separators have been utilised in mineral separation for over 100 years. The Spiral's predecessor, the sluice,
Sep 13, 2010