Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Economic Evaluation - It is Time we Cleaned-Out and Smartened-Up our Discipline

    Completion of a project requires two separate money-focused activities, namely economic evaluation of the cash flows underlying the project (before financing) and if the economics look promising, how

    Jan 1, 2009

  • AUSIMM
    Development Philosophy

    By Bruington T, Perkins J, Hutton R

    Natural resource developments are among the largest and most challenging projects taking place in the world. They involve capital intensive investment with long lead times and the management of geo

    Jan 1, 1997

  • AUSIMM
    An analysis of impact of weak rock formation on mining-induced deformation of rock slope

    By A Sainoki, D Fukuda, K Shioya, C Zhang, M Sharifzadeh, T Yamaguchi, S Saydam, J Kodama, C A. Amagu, Y Fuji

    In an open pit mining, ensuring stability of rock slope has been one of the major challenges. As the instability of rock slopes can results in slope failures; consequently, endanger the lives of worke

    Nov 29, 2022

  • AUSIMM
    Reversing the Trend in Open Pit Mining Equipment Output

    By T Trott, M Lewis, G Lumley

    The analysis of equipment trends in The AusIMMÆs revision of Monograph 19 - Australasian Mining and Metallurgical Operating Practices (AMMOP) (in prep) in the paper by Graham Lumley raised some intere

    Sep 18, 2012

  • AUSIMM
    Fuzzy Model of a Multigrade Structure for Support of Decision-Making and Management in Mineral Processing

    By M J. Pejovic, I Miljanovic, A Milutinovic4, T Benovic, A Petrovski

    The paper presents a model of a multigrade monitoring-management structure for support to decision making and management in real and extended time in mineral processing (MP). The model was created as

    Sep 26, 2011

  • AUSIMM
    Viscosity Controlled Production of High-Concentration Backfill Pastes (25c0bb81-3167-4f40-8bbb-0bad87ad79f2)

    By Mez W

    the German ruining industry uses different residues for hackfilling and stowing. A hydraulic pipe conveying technology for these materials has shown advantages for the transportation into the mine.

    Jan 1, 1998

  • AUSIMM
    SUSOP«: Embedding Sustainable Development Principles into the Design and Operation of Resource Extraction and Processing Operations

    Though many mining and mineral processing companies have embraced the principles of sustainable development (SD), there is still a significant challenge of applying these in a practical sense, either

    Jun 1, 2010

  • AUSIMM
    RISKGATE« - A Case Study in Application to Fires on Mobile Plant

    By J Harris, P Kirsch, D Cliff, M Spinks, S Goater, D Sprott

    Fires are a common and recurrent unwanted event in the operation of open pit mines. In most cases, the causes of events such as fires are already æknownÆ but are either overlooked or not fully address

    Sep 18, 2012

  • AUSIMM
    The Value of Geological Human Capital in the Improvement and Maximisation of Ore Deposit Value – The Kalgoorlie Consolidated Gold Mines Experience

    By D Cooke

    In 2010, Kalgoorlie Consolidated Gold Mines (KCGM) was Australia’s largest gold producer, with total annual production of 788 000 ounces. Of the gold produced by KCGM in 2010, 95 per cent was extracte

    Aug 22, 2011

  • AUSIMM
    Simulating Block Cave Secondary Breakage ù An Application of Information and Operations Management Tools in Mass Mining Systems

    By M Scoble, E Rubio

    The re-engineering of manufacturing production systems has demonstrated the benefits from using production information for optimising processes. This paper explores the techniques and issues in the ac

    Jan 1, 2000

  • AUSIMM
    Study on Mineral Processing of Refractory Copper-Nickel Ore

    Study on Mineral Processing of Refractory Copper-Nickel Ore

    Sep 13, 2010

  • AUSIMM
    The Approval of a Gold Mine in the Solomon Islands ù Environmental Planning Issues

    The Gold Ridge Mine is an open-cut gold mine in the Solomon Islands. The mine is owned and operated by Gold Ridge Mining Limited, a wholly owned subsidiary of Ross Mining NL. At the invitation of the

    Jan 1, 1999

  • AUSIMM
    Dense media separation – a valuable process for preconcentration

    By I Grewal, M Lundt

    Dense medium separation (DMS) is one of several preconcentration methods used for early waste rejection from run-of-mine ores at relatively coarse particle sizes prior to additional milling and benefi

    Sep 11, 2017

  • AUSIMM
    What Project Managers must Demand from an Economic Evaluation!

    By P Card

    Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de

    May 24, 2012

  • AUSIMM
    Cooling on demand – the next step in ventilation automation

    By F C. D Michelin

    As mines get deeper, the critical underground temperature limits will be exceeded, and an increasing number of mines will need to implement, expand or modify cooling systems. Surface cooling plants ha

    Oct 12, 2022

  • AUSIMM
    Separation of Nickel and Cobalt from Manganese, Magnesium and Calcium by Synergistic Solvent Extraction - From Batch Tests to Pilot Plant Operation

    Separation of Nickel and Cobalt from Manganese, Magnesium and Calcium by Synergistic Solvent Extraction - From Batch Tests to Pilot Plant Operation The synergistic solvent extraction system consistin

    Sep 13, 2010

  • AUSIMM
    Design and Commissioning of a 40 Tonne per Day Flotation Concentrate Bio-Oxidation Treatment Plant at the Harbour Lights Mine

    By Carter A. J, Miller D. M, Holder N. H M, Van Aswegen P C

    The Harbour Lights Mine situated at Leonora in Western Australia, mines a refractory sulphidic gold ore. The main sulphide minerals are pyrite and arsenopyrite. Due to the association of gold with the

    Jan 1, 1992

  • AUSIMM
    Alternative Underground Ore Transport Systems for the Jaguar Base Metal Deposit

    By W P. Darcey

    Jabiru Metals completed a feasibility study on the Jaguar Base Metal Project in July 2005. The study was based on conventional truck haulage via a decline. Conveyor haulage was considered but not in s

    Mar 21, 2011

  • AUSIMM
    Ore Characterisation for Mine to Mill Fragmentation

    By A Scott, S Kanchibotla, J Segui

    The æMine to MillÆ concept is not new. In fact, it is the underlying objective of every mine. Unfortunately, in many operations the management structure and reporting systems have created independent

    Jan 1, 2000

  • AUSIMM
    New Developments in Spirals and Spiral Plant Operations

    New Developments in Spirals and Spiral Plant Operations Records indicate that spiral separators have been utilised in mineral separation for over 100 years. The Spiral's predecessor, the sluice,

    Sep 13, 2010