Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Canadian Experience ù Disclosure Standards for Mineral ProjectsAfter considerable input from the mining industry, the Canadian Securities Administrators (CSA) finalised National Instrument 43-101: Standards of Disclosure for Mineral Projects. This Instrument, whi
Jan 1, 2002
-
Improving Pelletisation of Pyrite Cinder by High Pressure Roller GrindingImproving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding As an important secondary resource for ironmaking, pyrite cinder is characterised by coarse particle size, low specific surfa
Sep 13, 2010
-
Mechanisms on the impacts of basicity on hydrogen-rich gas-based direct reduction of pelletsBy J Pan, C M. Tang, D Q. Zhu, C C. Yang, S W. Li, Z Q. Guo
The short process of electric furnace steelmaking with direct reduction iron (DRI) as raw material is an important process for smelting high-quality and special steels. In order to prepare high-qualit
Sep 18, 2023
-
Sustainable Flood Management ù A Case StudyBy I F. Wood
Planning for flooding and assessment of flood impacts are important requirements for mining projects, as they are also for other types of development. With more intense development and concern from th
Jan 1, 2003
-
The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging ConditionsBy V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard
This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil
Sep 18, 2012
-
LaModel – A Program for Coalmine ModellingBy K A. Heasley
The LaModel program was initially developed in 1993, and it is used to model the stresses and displacements in thin tabular deposits such as coal seams. It uses the displacement-discontinuity variatio
Nov 5, 2014
-
Never Touch a Running System - Longwall Cutting Sequences and their PotentialThe optimisation and validation of shearer cutting methods is a time consuming engineering task. Many different parameters, of which not all can be controlled, can vary. The easiest solution, to incre
Dec 6, 2010
-
Investigation of the Classification Operation in a Coal Pulverising Vertical Spindle MillInvestigation of the Classification Operation in a Coal Pulverising Vertical Spindle Mill Coal pulverisation in power plants is a major electrical energy consumer. In 2006 more than 41 per cent of wo
Sep 13, 2010
-
The Ventilation and Refrigeration Design for Australia's Deepest and Hottest Underground Operation ù the Enterprise MineBy R Brake
The Enterprise Mine (EM) is located at Mount Isa and is wholly owned by Mount Isa Mines Limited (MIM). This high-grade copper mine extends from about 1000 m below surface to almost 2000 m below surfac
Jan 1, 2000
-
Port Hedland Harbour TunnelBy A Bennett, A Peck
BHP has recently constructed a Hot Briquetted Iron Plant at Port Hedland in the Pilbara region of Western Australia. Supply of iron ore fines to the plant is by conveyor from the companyÆs existing Ne
Jan 1, 1999
-
Using a Coal Mine Safety Regime Approach to the Management of High-Voltage Electrical IsolationBy J Joy, D Griffiths, A Bye, G V. Kizil
Poor standards of electrical installation and maintenance continue to contribute to electrical related fatalities and injury risk in the mining industry. Electrical isolation has the potential to init
Nov 20, 2012
-
The future is electrifying – introduction of a battery electric loader to CSA MineBy M Ireland
Extensive use of diesel-powered mobile equipment in modern mines for materials handling, such as load-haul-dump machines, constitute a significant source of heat, exhaust gases and diesel particulate
Mar 29, 2023
-
Maldon to Dombarton Rail Link – Design Development of the Avon TunnelBy A Bagis, T Baker
In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct
Sep 17, 2014
-
Why is the Mineral Processing Field Behind in the Application of New Technology?Mineral processing is at the hub of the exploration-mining-metals production system. Because of the large volumes of material processed, incremental technology investments can pay off better than fo
Jan 1, 1993
-
Application of the Legal Concept of 'Balance of Probabilities' to Mineral Resource Grade EstimatesGetting it right is a very profitable outcome. Shareholders would ideally like to see their directors get it right all the time on the major economic decisions. But it is very difficult for mining d
Jan 1, 1994
-
Murrin Murrin Heap Leaching ProjectBy N Meadows, M Rodriguez
A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto
Jan 1, 2006
-
Utilising Electronic Detonators at Hail Creek Mine for ‘Dynamic Buffering’By A Baker
Hail Creek Mine is an open cut coal operation owned by Rio Tinto. It is located 120 km south west of Mackay in the Bowen Basin region of central Queensland. Opened in late 2003, the mine produces two
Nov 8, 2011
-
Trends in Test Filtration to Respond to Decreasing Sample SizeTrends in Test Filtration to Respond to Decreasing Sample Size There has been a steady decline in the quantity of samples available for testwork when developing new mining processes due to the maturi
Sep 13, 2010
-
Mine Shafts – Planning, Optimising and ConstructingBy D J. Kilkenny
Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq
Mar 21, 2011
-
Copper Recovery from Printed Circuit Board by CarbonisationCopper Recovery from Printed Circuit Board by Carbonisation
Sep 13, 2010