Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mount Morgan Gold-Copper Deposit:: The 1992 Perspective

    By Dean J. A, Taube A, White A. H, Messenger P. R, Jones I. W O, Huston D. L

    The 50 million tonne Mount Morgan gold-copper deposit (4.99 g/t Au, 0.72 per cent Cu) was an irregular pipe-like body of quartz and pyrite, with subordinate chalcopyrite, magnetite and gold. Mineralis

    Jan 1, 1993

  • AUSIMM
    Fragmentation Optimisation – Adopting Mine to Mill for Reducing Costs and Increasing Productivity

    By V M. Silva, P A. A Martins, V O. Matthew, A L. S Fonseca, E B. Cunha, A J. D Ferrari, E M. S Silva, A C. Silva, D R. T Vilela

    The Anglo American phosphate mine is located in the Brazilian state of Goiás and possesses one of Brazil’s most important phosphate rock deposits, with the site being the country’s second largest

    Aug 24, 2015

  • AUSIMM
    Ilmenite Beneficiation by Roasting and Magnetic Separation

    By J P. van Dyk

    A new crude ilmenite beneficiation process was recently proposed that allowed for the preparation of a smelter grade ilmenite from ilmenite with elevated chromium content. Magnetising roasting was not

    Jan 1, 2001

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    Chromite Ore û Characterisation Through to Processing

    By M I. Pownceby, W J. Bruckard

    A South African chromite sample was subjected to characterisation and physical beneficiation testwork in order to assess its suitability to produce an upgraded chromite product with a silica level of

    Jan 1, 2008

  • AUSIMM
    CIP ù Who Needs It? A Combination Circuit of Gravity, Flotation and Intensive Leach May Provide the Optimal Environmental and Cost Outcome for Gold Plants ù Stage II ù Results

    By A McCallum, J Abols, G Patrick, G Johansen

    The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold proc

    Jan 1, 2004

  • AUSIMM
    Formulating and Solving Complex Minerals Industry Optimisation Problems û A Systems Approach to Complex Systems Problems

    The paper provides an overview of the development and content of APCOM symposia since their inception in 1961. This development is set within the context of the academic environment in which much of t

    Sep 26, 2011

  • AUSIMM
    Elastoplastic parameter change at claystone rock mass during sliding failure at Warukin Formation, Indonesia

    By G W. Swana

    Elastoplastic parameter is a parameter that describe how much materials behave elastically up to certain stress states and plastically thereafter (Hudson and Harrison, 1997). In the continuum analysis

    Nov 29, 2022

  • AUSIMM
    Influence of Iron Bearing Carbonates and Reactive Iron Sulfides on Acid Rock Drainage Static Predictive Testwork

    By J Thoma, W Skinner, W Stewart, R Smart

    The acid neutralisation capacity (ANC) of rock sample containing significant iron carbonates and/or reactive framboidal pyrite can be a difficult parameter to determine. Results indicated that negativ

    Jan 1, 2003

  • AUSIMM
    Flux smelting behaviour of pre-reduced Mn ore by hydrogen at elevated temperatures

    By P Kumar, J Safarian

    Understanding how ore interacts with flux particles at elevated temperatures to create molten slag is crucial since it governs the dynamics of a chemical reaction. This study explores the smelting beh

    Jun 19, 2024

  • AUSIMM
    Ultrasonic Extinction for High Resolution Particle Size and Concentration Analysis

    Ultrasonic Extinction for High Resolution Particle Size and Concentration Analysis

    Sep 13, 2010

  • AUSIMM
    Paiam - A Plan for a New Sustainable High Altitude Equatorial Town in Papua New Guinea

    Paiam is a new township in the high mountains of Papua New Guinea built in association with the Porgera Joint Venture mine, one of the world's largest and most remote open cut gold mines. The Pai

    Jun 1, 2010

  • AUSIMM
    Additional Attractive Force Between Alumina Particles Due to Low Solubility of Dicarboxylic Acids

    Additional Attractive Force Between Alumina Particles Due to Low Solubility of Dicarboxylic Acids

    Sep 13, 2010

  • AUSIMM
    Validation and Application of Filtration Theory to Plate and Frame Pressure Filtration - From Laboratory to Full Scale

    Validation and Application of Filtration Theory to Plate and Frame Pressure Filtration - From Laboratory to Full Scale

    Sep 13, 2010

  • AUSIMM
    Research on Universal Depressant of Talc and Serpentine

    Research on Universal Depressant of Talc and Serpentine

    Sep 13, 2010

  • AUSIMM
    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    Sep 13, 2010

  • AUSIMM
    Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field

    Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field

    Sep 13, 2010

  • AUSIMM
    Multicomponent modelling and simulation of the Minas Rio iron ore grinding circuit

    By T M. Campos, J Silva, L M. Tavares, J Lichter, L P. Alves, B K. N Rocha, H D. G Turrer

    The depletion of the richest ore deposits and the increase in number of mining projects involving deposits with complex mineralogy, higher competence and lower grade has led to an eminent need for imp

    Aug 24, 2022

  • AUSIMM
    Modelling metal recovery by co-kriging the feed and concentrate masses of metal

    By P Dowd, A Adeli, C Xu, X Emery

    Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining

    May 24, 2023

  • AUSIMM
    Boron removal through multistage refining treatment using CaO-SiO2- Al2O3 slag

    By K L. Avarmaa, M A. Rhamdhani, A D. P Putera, H T. B M Petrus, G A. Brooks

    Multistage slag treatment was carried out to investigate boron removal from metallurgical grade silicon. Boron is known to be one of the most difficult elements to remove from silicon. Depending on bo

    Aug 21, 2024