Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Contact Angle Measurements on Lignite Surface

    Contact Angle Measurements on Lignite Surface

    Sep 13, 2010

  • AUSIMM
    Filtration of coal washery slurries using a horizontal belt filter

    By Slechta J. J

    An evaluation of a pilot scale Delkor horizontal belt filter at Bellambi's South Bulli Colliery showed high productivities and low moisture contents for a range of feed slurries. When treating fl

    Jan 1, 1986

  • AUSIMM
    The Dugald River Zinc-Lead Deposit, Northwest Queensland, Australia

    By Johnson I. R, Muir M. D

    The Dugald River zinc-lead deposit is located 60 km northwest of Cloncurry. It was discovered prior to 1881, and since 1937, has been the subject of several drilling programmcs which have outlined a r

    Jan 1, 1982

  • AUSIMM
    Milling Practice at the Central Mine, Broken Hill, N.S.W.

    CENTRAL mine ore consists mainly of galena and marmatite in a siliceous and rhodonitic gangue, the average assay values being approximately 11.5 oz. per ton Ag, 14.5% Pb, 14.5% Zn, 1.3% Ox Pb, 0.3% Ox

    Jan 1, 1931

  • AUSIMM
    Improving Coal Mining Production Performance Through the Application of Total Production Mangement

    This paper describes the application of the Total Productive Management (TPM) technique as a performance improvement initiative for a coal mining operation. It discusses the objectives of TPM, with th

    Jan 1, 1998

  • AUSIMM
    The Application of Geology to Mining at Bendigo

    In recent years it has been more and more recognised that applied geology can be of service to the mining industry, and many mining companies overseas now have permanent geological staff as part of th

    Jan 1, 1936

  • AUSIMM
    Proposals to Reopen the Sylvia Mine

    This paper describes a proposal to reopen the Sylvia gold mine for underground exploration and development for an initial production of 10 000 tpa. A combination of trackless mining equipment and rail

    Jan 1, 1987

  • AUSIMM
    Operations and Control of 32 Feet Diameter SAG Mills at Ok Tedi

    By Katom M

    Each of the two 32 feet diameter Semi Autogeneous Grinding (SAG) mills at Ok Tedi's copper and gold concentrator was treating at best 1500 tph at about 65 per cent mill availability in 1988. Th

    Jan 1, 1997

  • AUSIMM
    The Deformation of a Duplex Brass by Cold Drawing

    By McDonald G. G

    In the deformation of a metal or a single-phase alloy all the crystals composing the metal after their shape in a similar manner as the metal in bulk and to about· the same extent. This is not th

    Jan 1, 1941

  • AUSIMM
    Measurement of Phase Transformation Rates During the Reduction of Iron Oxides Using High-Temperature X-Ray Diffraction

    By Madsen I. C, Langberg D. E

    Recent advances in X-ray diffraction (XRD) technology have made it possible to conduct powder XRD measurements on samples at high temperatures during reaction. State-of-the-art detectors are now cap

    Jan 1, 1999

  • AUSIMM
    Mineralogical Assessment of a Churn-Drill Core form an Alluvial Tin Deposit

    Some of the problems associated with drill core evaluation of alluvial tin deposits and correlation with plant-scale recovery are discussed. Panning churn-drill cores on site tends to undervalue such

    Jan 1, 1970

  • AUSIMM
    Observations on the Zinc-Lead Lode at Rosebery, Tasmania

    The zinc-lead lode at Rosebery, on the West coast of Tasmania, has a total length of over 4000 ft. It consists of five elongated lenses parallel to the foliation planes of the quartz sericite schist,

    Jan 1, 1934

  • AUSIMM
    Geological Exploration at North Broken Hill Limited

    This paper summarizes the progress of geological exploration at North Broken Hill Ltd.The North Mine orebodies occur in knots of minor folds on a simple limb structure which is itself highly folded, g

    Jan 1, 1956

  • AUSIMM
    Mount Isa Cut and Fill (MICAF) Stoping

    ABSTRACTMechanised cut and fill stoping in the Racecourse orebodies between II and 9 levels was started in 1964.Five stopes are in progress over the two level interval, extracting the full strike leng

    Jan 1, 1968

  • AUSIMM
    The Water Flume Conveyors of the Mount Lyell Mining and Railway Company Limited

    THE power requirements of the Mount Lyell Mining and Railway Company at Queenstown, Tasmania, have, since the inception of smelting operations in June) 1896, been derived continuously from the extensi

    Jan 1, 1910

  • AUSIMM
    Flow Sheet Simulation of Municipal Waste Treatment Processes

    Flow Sheet Simulation of Municipal Waste Treatment Processes

    Sep 13, 2010

  • AUSIMM
    PanAust Limited’s approach to mine waste and tailings stewardship

    By L P. Trout, D G. Reid

    PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem

    Jul 23, 2018

  • AUSIMM
    Test Work on High Throughput Diamond Tracer Recovery from Alluvial Recovery Tailings with a Containerised Optical Sorter Under Real Production Conditions

    Test Work on High Throughput Diamond Tracer Recovery from Alluvial Recovery Tailings with a Containerised Optical Sorter Under Real Production Conditions Worldwide alluvial diamond deposits are tradi

    Sep 13, 2010

  • AUSIMM
    A Process for the Flotation of Chrysocolla

    A Process for the Flotation of Chrysocolla

    Sep 13, 2010

  • AUSIMM
    An Integrated Solid Waste Management Method for Western Macedonia, Greece

    An Integrated Solid Waste Management Method for Western Macedonia, Greece

    Sep 13, 2010