Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Gold Financing and the Title to Gold: Gold Loans, Gold Coins and Goldcorp

    The principal source of funding the working capital requirements of gold miners has traditionally been equity. However in the 1980s, with a substantial increase in activity in the exploration for, and

    Jan 1, 1994

  • AUSIMM
    Geology, Geochemistry and Geochronology of the Midas Epithermal Gold System, Nevada

    By G B. Arehart

    The Midas epithermal system is one of the larger low-sulfidation epithermal vein systems discovered in the western US in recent years, containing in excess of 3 Moz of gold (premining). The deposit is

    Jan 1, 2005

  • AUSIMM
    Budget Estimation and Contingency Allocation of Block Cave Construction Using Least-squares Monte Carlo Real Options

    By H M. Ahmed, W S. Dunbar

    Construction of cave mining systems requires significant capital expenditure and long-term commitment of human, equipment and material resources before production commences. Risks and uncertainties of

    May 9, 2016

  • AUSIMM
    East-Dipping Strike Faults on The Boulder Belt, Kalgoorlie

    (Published by courtesy of the Great Boulder Pty. Gold Mines, Limited)1. INTRODUCTIONThe faults described in the following paper are of a somewhat unusual character, and have presented a serious proble

    Jan 1, 1941

  • AUSIMM
    Gold Plant Cyanide Safety

    By B Vernon, M Whiteley, T Robinson

    The Western Australian gold industry has approximately 100 operating plahts, mainly CIP/CIL. The nature of the State's rapidly expanding gold industry gave rise to concerns over management of the

    Jan 1, 1990

  • AUSIMM
    An Application of Trend Surface Analysis to the Preparation of Cover Isopach Maps for Coal Seams

    Conventional hand drawn isopach maps of the cover of the Bulli Seam are too eomplex for use in the delineation of large domains of similar cover. Isopach maps prepared from trend surfaces fitted to th

    Jan 1, 1968

  • AUSIMM
    Technical Note on Recovery of Manganese from Low Manganese Content Ferromanganese Slag

    By Rao P. K, Sahoo P. K

    The main constituents of ferromanganese slags are silicates of Mn, Ca and AI. Factors affecting the recovery of manganese from a low manganese content ferromanganese slag (about 16 per cent MnO) durin

    Jan 1, 1979

  • AUSIMM
    Optmization of Copper Electrowinning at High Current Densities

    A detailed study of the capital investment and production cost for copper electrowinning plants shows that significant savings in both can be achieved by increasing the current density. From the econo

    Jan 1, 1972

  • AUSIMM
    Stacking and Reclaiming Facilities at South Blackwater Coal Mine, Queensland

    By Hoskings R

    Conceptual studies of the run of mine stockpiling and reclaiming requirements at Thiess Bros Pty Ltd South Blackwater coal mine commenced in 1975.Final selection of equipment was made in 1978 and the

    Jan 1, 1981

  • AUSIMM
    The Air Comparison Pycnometer for Rapid Iron Determinations

    The Beckman Air Comparison Pycnometer is as accurate as the specific gravity bottle for the determination of the volume of fine powders, or particles, up to 50 c.c. in volume. The determination using

    Jan 1, 1963

  • AUSIMM
    Presidential Address, 1970 Men for Minerals

    This evening I would like to speak about men for the mineral industry.It is trite to say that the mining industry is expanding rapidly and that technically trained men are in short supply. How short i

    Jan 1, 1970

  • AUSIMM
    The Relationship of Structure and Ore Deposition at Stawell Goldfield, Victoria

    The Stawell Goldfield, the westernmost of the main Victorian fields, has produced over a million and a quarter ounces of gold from one and three-quarter million tons of ore. The lodes are quartz reefs

    Jan 1, 1960

  • AUSIMM
    Development and Benefits of Interactive Learning Systems on Atlas Copco Equipment

    Atlas Copco Construction and Mining Australia identified a number of issues in regard to the skill levels, labour turnover and productivity of our service technicians. In 1994 we were experiencing a l

    Jan 1, 1998

  • AUSIMM
    Pilot-Scale Kiln Processing of New Zealand Ilmenite

    By Mills R, Shannon W. T, Finch J

    As an extension to investigations into methods of upgrading the Iitania content of ilmenite concentrate from beach sands using 100 g/day, a small pilot plant treating 23 kg/ day of ilmenite was used.I

    Jan 1, 1977

  • AUSIMM
    A Magnetic Hydrocyclone

    The concept of a magnetic hydro-cyclone is undeveloped, possibly because studies by Bragard (1965) and the Royal School of Mines in London (Robinson, 1965) were not encouraging. Its role for the conce

    Jan 1, 1984

  • AUSIMM
    What is the Matter with Australian Mining?

    THERE are certain facts that the mining industry in Australia is faced with at the present moment which may be accepted as axioms. The industry is at a low ebb, as evidenced by statistics. Metals form

    Jan 1, 1919

  • AUSIMM
    The Porgera Gold Deposit Structure, Alteration and Mineralisation

    By T Leach, B Fulton, R Stewart

    Gold mineralisation at Porgera is inferred to have been derived from a deep differentiated magmatic source which is capped by a series of (now tilted) inward dipping sills and stocks, which comprise t

    Jan 1, 1995

  • AUSIMM
    Metallurgical Effects Associated with the use of Cemented Backfill at the Zinc Corporation, Limited and New Broken Hill Consolidated Limited

    The addition of cement to underground backfill at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill commenced in 1967. A deterioration in metallurgical performance at

    Jan 1, 1971

  • AUSIMM
    Removal of Iron Oxides from Bauxitic Ores

    A process was developed, on a laboratory scale, for the removal of iron oxides from Weipa pisolitic bauxite. The technique involves the chemical reduction ofthe iron oxides by carbon, followed by sele

    Jan 1, 1971

  • AUSIMM
    Dynamic influences of optimisation on emissions

    By P J. Bangerter, J Pan

    Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such

    Aug 2, 2023