Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013

  • AUSIMM
    Ranges of Validity of Some Distribution Functions for Blast-fragmented Rock

    By J A. Sanchidrián

    The general ranges of validity of some distribution functions are assessed from their behaviour with 119 sets of fragmentation data from bench blasting obtained by sieving. The emphasis is on determin

    Aug 24, 2015

  • AUSIMM
    Pillar Extraction at the Doe Run Company, 1991-1998 (82799d0e-2b30-4c7e-911c-ac1c973112a1)

    By Yanske TR, Lane WL

    The Doc Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaini

    Jan 1, 1998

  • AUSIMM
    Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western Australia

    The Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located

    Jan 1, 2006

  • AUSIMM
    Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold Concentrator

    By A Murphy, D Lauder, J Miranda

    Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro

    Jan 1, 2000

  • AUSIMM
    Cape Lambert Upgrade Project

    By S Russell

    The completion of the $1.1 B Cape Lambert Upgrade project is the second ‘pillar’ in Rio Tinto Iron Ore’s expansion program that has enabled Rio Tinto Iron Ore to effectively double iron ore shipping c

    Jul 11, 2011

  • AUSIMM
    The Effect of Delay Time on Fragmentation Distribution through Small- and Medium-scale Testing and Analysis

    By O Omidi, P D. Katsabanis

    The effect of delay time on fragmentation has been discussed for a long period but rarely in a satisfactory and unbiased way. Despite the efforts of many researchers, delay selection for fragmentation

    Aug 24, 2015

  • AUSIMM
    Fluorine Removal From Ok Tedi Copper/Gold Concentrates

    By J W. Glatthaar, M Mavotoi

    The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho

    Jan 1, 2003

  • AUSIMM
    Field Characterisation of Two Full-Scale Waste Rock Piles

    By D J. Williams, G W. Wilson, S, A B. Tran

    A comprehensive field program was implemented to evaluate the internal structure and hydrology of two full-scale waste rock piles. The excavation of waste rock dumps for in-pit disposal at the two min

    Jan 1, 2003

  • AUSIMM
    Practical Approaches to Managing Business Critical Water Risk

    By A Tang, K Ringwood

    "Water is increasingly being recognised as a material business risk that many companies are still not well-equipped to deal with. Despite a raft of water-risk focused initiatives, methodologies and gu

    Nov 26, 2013

  • AUSIMM
    A Geometallurgical Approach at Anglo American PlatinumÆs Mogalakwena Operation

    By T Muzondo, C Prins, D De Vaux, R Schouwstra

    The Mogalakwena Platinum Mine in the northern limb of the Bushveld Complex is Anglo American PlatinumÆs only open cast operation exploiting the Platreef. The Platreef, which extends along the basal co

    Sep 29, 2013

  • AUSIMM
    Considerations for the design and support of underground portals

    By M P. Sandy, R M. Stephenson

    Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu

    Mar 15, 2021

  • AUSIMM
    The Influence of Solar Radiation on Evaporation for Three-Dimensional Flux Boundary Modelling of Soil Cover Systems on Waste Rock Dumps

    By G W. Wilson

    Net solar radiation is one of the key factors affecting evaporation from soil covers on waste rock dumps. While net solar radiation is normally taken as a uniform parameter over a site for modelling p

    Jan 1, 2003

  • AUSIMM
    Implementation of a High Energy Dissipation Ground Support Scheme

    By E Villaescusa, A Kusui, R Talebi, R Hassell, C Arcaro

    Northern Star Resources (NSR) operates several seismically active mines as part of its Kalgoorlie Operations. In order to successfully continue mining at depth in increasing stress conditions, strateg

    Mar 15, 2021

  • AUSIMM
    Estimation of Resources and Conversion to Reserves ù Protocols for the Assessment, Reduction and Management of Risk

    By G Ferguson a, P Carrasco, P P. A Dowd

    International codes of practice offer broad definitions with respect to the classification of resources in terms of risk. Specific guidelines and protocols, to analyse sample data, carry out geostatis

    Jan 1, 2000

  • AUSIMM
    Glencore Mount Isa lead zinc flotation circuit – experiences from the implementation of model predictive control

    By A Price, D Okle, K Brooks

    The operation of flotation plants has been improved over the years by use of fundamentally based design techniques, a better understanding of reagent chemistry, online metal analysis and the use of di

    Aug 29, 2018

  • AUSIMM
    Use of Mineralogy to Interpret Laboratory-Scale Acid Rock Drainage Prediction Tests - A Gold Case Study

    By S T. L Harrison, J-P Franzidis, M Becker, N Dyantyi, J L. Broadhurst

    Gold mining is a major contributor to the South African economy, but is associated with several environmental issues such as acid rock drainage (ARD). ARD is due to the oxidation of sulfides in gold t

    Sep 26, 2013

  • AUSIMM
    Low-Grade Concentrator Regrind Circuit Upgrade at NewcrestÆs Cadia Valley Operations

    By B Clements, R Dunne, J Dioses, S Hart

    In April 2003 plant upgrades in the æLow GradeÆ Cadia Hill circuit were undertaken in order to improve concentrate quality and metal recoveries from the flotation circuit. The major changes involved:

    Jan 1, 2005

  • AUSIMM
    Rock Bolts for Permanent Tunnel Lining

    By J de Witte

    When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i

    Mar 8, 2011

  • AUSIMM
    Nova-Bollinger unfolding versus DA estimate

    By P M. Hetherington, M P. Murphy, K E. Crook, F Pym

    Resource characterisation is critical for informed decisions in both strategic and operational space. The sources of information for resource characterisation are limited by: direct measurement of res

    Mar 22, 2022