Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel Concentrator

    The reasons for and the methods of inte- gration of the gold treatment plant with the existing nickel concentrator are discussed. The integration was accomplished in three stages commencing in May 1

    Jan 1, 1984

  • AUSIMM
    Reaping the First Fruits – Infrared Spectroscopy: the New Standard Tool in BHP Billiton Iron Ore Exploration

    By M Haest, O Dominguez, D Mittrup

    With the current focus in the mining industry on reducing costs, while simultaneously improving ore quality, infrared spectroscopy is a tool that can potentially assist companies to meet both challeng

    Jul 13, 2015

  • AUSIMM
    Applied Mineralogy of Refractory Copper Ores from the Nchanga Mine in the Copperbelt of Northern Zambia

    By A M. Hagni

    Certain copper ores from the Nchanga Copper Mine in the northern Zambia Copperbelt are refractory with respect to conventional beneficiation techniques. This paper reviews recent study of those ores t

    Jan 1, 2008

  • AUSIMM
    High-Speed Motion Picture Photography Analysis in 3D - A New Approach to Analyzing Full Scale Blasts

    By Vanderberg B

    A 3D, PC based computer program is currently under development by Blasting Analysis International, Inc., to analyze the kinetics of full scale blasts with two or more high-speed motion picture camer

    Jan 1, 1990

  • AUSIMM
    On the Application of the Method of Exhaustion in Seeking a Proper Formula for Discharge Estimation

    In order to do the discharge estimation better, it is valuable to find out appropriate formulas for estimating discharge in various pits, based on accumulating data, summarizing discharge patterns

    Jan 1, 1988

  • AUSIMM
    A Review of the Theory and Application of Multi-Criteria Decision Analysis Techniques in Mine Planning

    Mine planning includes equipment selection as a subprocess because aging equipment must be replaced to maintain or improve productivity levels. The criteria used for decision-making in mine planning a

    Dec 6, 2010

  • AUSIMM
    The Nature and Origin of the Ore-Forming Fluid in the Kidston Gold Deposit, North Queensland

    By Baker EM

    The Kidston orebody is a kilometre diameter breccia pipe of Permo-Carboniferous age' assoc- iated with rhyolitic dykes and hosted by Proterozoic granodiorite and metamorphic rocks. Mineralizat

    Jan 1, 1987

  • AUSIMM
    Paleoplacer Potential in the Mid-Proterozoic of the Northern Territory-A Study of the Westmoreland Conglomerate

    By Wygralk A, Hallenstein CP

    On a world scale, many Mid-Proterozoic fluvial sediments are prospective for low grade, large-tonnage gold deposits. A significant area of the Northern Territory is covered by such Mid-Proterozoic

    Jan 1, 1984

  • AUSIMM
    Environment Studies to Determine the Impacts of Re-opening Banksa Stiavnica-Hodrusa Ore District in Czechoslovakia

    By Skaviniak M

    Some better perspectives applying to the exploitation and dressing of polymetallic ores in the Banskfa. gtiavnica-Hod- rusea Ore District are supposed to be achieved after a suc- cessful investigatio

    Jan 1, 1988

  • AUSIMM
    Automated Sampling of Iron Ore for Analysis at the Saldanha Iron Ore Terminal in South Africa

    By P Hofmeyr, D Pretorius

    Iron ore, which is transported by rail from the iron ore mines at Sishen in the Northern Cape, to the Saldanha Iron Ore Terminal in the Western Cape, needs to be analysed while loading to be exported.

    Aug 21, 2012

  • AUSIMM
    Investigations into the Removal of Airborne Pollutants From Underground Ventilating Air in a Deep Hot Mine

    By T J. Sheer

    The removal of airborne pollutants from underground ventilating air is discussed. The work concentrates on the removal of CO, CO2, NOx, SO2, radon gas and respirable carbon particles. The investigatio

    Jan 1, 2005

  • AUSIMM
    Social Licence in Real-time – Using Dynamic Methods to Support a New Kind of Community Relationship

    By N Boughen, K Moffat, L Brooks, A Zhang

    In 2015, Ernst and Young (EY) ranked socio-political license to operate (SPLTO) as the fifth greatest challenge to the mining sector (EY, 2015). The EY report asserts that SPLTO will continue to prese

    Jun 28, 2016

  • AUSIMM
    Application of Inductive Methods in Determining Probable Location of Orebodies Where Surface Indications Have Become Obscured

    The geologist is often called upon to give judgment on the possibilities of reviving a former mining field presumably worked out as far as the evidence then available indicated. From time to time, sca

    Jan 1, 1950

  • AUSIMM
    Marra Mamba Iron Ore - A Case History in Exploration and Developments of a New Ore Type

    In 1972 the Marra Mamba Iron Formation in the Lower Proterozoic Hamersley Iron Province of Western Australia was recognised as a stratigraphic horizon with significant potential for high grade iro

    Jan 1, 1981

  • AUSIMM
    Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West Africa

    By G du Toit, P L. Gillot, M Swanepoel

    Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of

    Sep 1, 2014

  • AUSIMM
    Moving Towards Sustainable Development in the Mining and Minerals Industry - The Role of a Major Supplier

    By J Tsiklieris, O Turner

    Suppliers of products and services have a pivotal role in sustainable development in the mining and minerals industry. Reputable suppliers know their products and services, and the industry, and have

    Jan 1, 2004

  • AUSIMM
    Environmental Auditing as a Driver for Continuous Improvement in Environmental Performance (ede55e7e-c054-4fc6-ae90-dd762e66d692)

    Continuous improvement in environmental management assists in the achievement of sustainability goals for the mining and processing of minerals. The use of regular internal environmental audits (score

    Jan 1, 2004

  • AUSIMM
    Reporting Mineral Resources and Mineral Reserves in the United States of America -Technical and Regulatory Issues

    The Committee for Mineral Reserves International Reporting Standards (CRIRSCO) was formed in 1994 to promote development and adoption of international standards for estimation and reporting of explora

    Jan 1, 2006

  • AUSIMM
    Suitability Of Different Types Of Pellets For Use In Blast Furnaces Or Direct Reduction Shaft-Furnaces

    By de Lassar de Pressigny Y

    IRSID has in its laboratories two experi mental counter-current reduction furnaces allo- wing the simulation of the physico-chemical conditions of reduction in any gas-solid coun- ter-current process

    Jan 1, 1974

  • AUSIMM
    Golden Cross Mine - Gold Mining in a Sensitive New Zealand Environment (7e135577-c7a0-4219-a3fe-f7032e5b9261)

    The Golden Cross mine is situated in a sensitive environmental setting on the North Island of New Zealand, about 150 kilometres south-east of Auckland and about 8 kilometres NW of Waihi. The mine is

    Jan 1, 1995