Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Non-Conventional Use of VoD Measurement Technology for the Quantification of Delay Performance

    By P Aguilera, C Guerrero, M Tucker

    With the advent of Electronic Detonator Systems in the global mining industry, as well as the development of high precision pyrotechnic delays, the measurement and analysis of delay performance (usual

    Jan 1, 2004

  • AUSIMM
    The Social Licence to Operate and Drivers for Change – Resource Reporting and Mine Material Characterisation

    By J Heyes, G A. Maddocks, R J. Stewart, G D. Corder

    Mining is an international business and vital contributor to national and global economies. It depends on the trust and confidence of investors and stakeholders for its financial and operational well-

    Jun 28, 2016

  • AUSIMM
    Quantifying the effect of climate and surface materials on post-mining landscape erosion – a risk approach using landscape evolution models

    By D C. Verdon-Kidd, G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard

    Designing post-mining landscapes requires quantifying the short and long-term risks. In recent years, computer based landscape evolution models (LEMs) have been used to provide insight into both erosi

    Jul 25, 2018

  • AUSIMM
    Notes on a Railway Tunnel Carried on Timber

    The timber township of Powelltown, Victoria lies N.E. of Yarra Junction, 60 miles east of Melbourne and in the site of the mill of the Victorian Hardwood Company Proprietary Ltd.A lift gauge railway o

    Jan 1, 1925

  • AUSIMM
    The Structural Evolution of the Hyde-Macraes Shear Zone at Round Hill, Otago, New Zealand

    The Hyde Macraes Shear Zone (HMSZ) is an extensive low angle semibrittle mineralised structure in the Otago Schist Belt, New Zealand. The shear zone is located on the lower limb of a late metamorphic

    Jan 1, 1992

  • AUSIMM
    Analysis and Modelling of the Fragmentation Process – Case Studies at El Teniente Mine

    By V Barrera, A Brzovic, M Gaete, L Burgos, E Arancibia

    Fragmentation is one of the most relevant parameters in the design and operation of a mine using the caving mining method. Fragmentation affects all subsequent operations, including extraction, commin

    May 9, 2016

  • AUSIMM
    Dirty goethite – a geochemical characterisation of some western Robe River channel iron deposits

    By C Placzek, E Beattie, K Blake

    Channel iron deposits (CID) consist of ferruginous chemical sediments, and are an unusual subset of Phanerozoic ooidal ironstone deposits almost unique to the Pilbara, where they constitute around 19

    Jul 24, 2017

  • AUSIMM
    The Proton Precession Magnetometer as a Prospecting Instrument

    By Haigh J. E

    An accurate measure of the earth's magnetic field can be made in a few seconds with the portable proton precession magnetometer. Such an instrument increases the applicability of the long success

    Jan 1, 1963

  • AUSIMM
    Paper No. 129. Description of The Reduction Plant And Processes of Reduction of Wyalong Ores.

    he Wyalong goldfields were discovered in September, 1893, Messrs. Neeld and Sons, owners of the principal mine, being the pioneer prospectors. During the earliest days of the field the ore was sent to

    Jan 1, 1903

  • AUSIMM
    Shaft Plumbing at Mount Isa (665f189f-b324-4bcc-8bad-ef37a0685173)

    MR. E. J. HORWOOD wrote: In view of the difficulty of obtaining accurate results when using plumb lines in shafts, owing to the effect of currents of air, the writer, over M years ago, devised a metho

    Jan 1, 1940

  • AUSIMM
    The Geophysical Properties of Zinc Deposits

    By Emerson D. W

    The search for economic mineral deposits is becoming more difficult as exploration goes deeper in the established mining camps and spread out to the surrounding covered areas, which may have an `ov

    Jan 1, 1993

  • AUSIMM
    Some Gold Bearing Rocks at Bingara, N.S.W.

    The locality from where these specimens come is distant about 12 miles due south from the township of Bingara New South Wales, and is known locally as Carney's Reef, Barrack's Creek, Top Bin

  • AUSIMM
    Closing Address

    The Illawarra Branch of the Australasian Institute of Mining and Metallurgy over recent years has established an enviable reputation for organising and conducting conferences, colloquia and sympos

    Jan 1, 1982

  • AUSIMM
    Precipitation of Cyanide as Cu<sub>2</sub> Fe(CN)<sub>6</sub> Compounds from Cyanidation and Detoxification Circuits

    By J H. Kyle

    Cyanide is a significant cost in gold processing, as well as an environmentally sensitive issue. It has been suggested that precipitation of cyanide from leach liquors as copper-iron-cyanide compounds

    Jan 1, 2000

  • AUSIMM
    Canadian and American Guidelines on Ore Reserve Reporting, and a Comparison with those Proposed for Australia

    By McCarthy J

    In both the U.S.A. and Canada regulations concerning the reporting on mineral resources and especially ore reserves have been established. The regulations are virtually identical for the two countri

    Jan 1, 1987

  • AUSIMM
    New Non-Cyanide Technology for Processing Massive Copper-Zinc Ores

    By T Ye Koltunova an, L A. Otrozhdyonnova

    This paper presents the results of studies on the development of an efficient non-cyanide technology for processing massive, finely disseminated, copper-zinc ores of the Urals deposits. Copper is main

    Jan 1, 2005

  • AUSIMM
    Long-Term Evaluation of Diesel Particulate Filter Systems at IncoÆs Stobie Mine

    By A D. Bugarski, B R. Conard, G H. Sc

    The objective, of the Diesel Emissions Evaluation Program (DEEP)-sponsored project at IncoÆs Stobie mine, was to conduct a long-term field evaluation of selected diesel particulate filter (DPF) system

    Jan 1, 2005

  • AUSIMM
    Electronic Detonators ù Banking the Benefits

    Electronic detonators bring a fundamental and radical change to the potential of rockbreaking operations. The immense technical challenge of safely merging electronic systems with explosives has been

    Jan 1, 2004

  • AUSIMM
    Reconciliation at the Musselwhite Mine - From Exploration to Production

    The Musselwhite mine, located in northwestern Ontario, Canada, has been an underground narrow-vein gold producer since the spring of 1997. As an exploration project at the feasibility stage, much effo

    Jan 1, 2002

  • AUSIMM
    Internalising Environmental Management - Bringing the Environment into Management

    The mining industry was one of the first industry groups to be confronted by and to respond to public and government pressure to improve its environmental management. Companies operating in New Zea

    Jan 1, 1991