Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improvement of Mechanical Tool Performance by Waterjet Assistance

    The problems arising in the excavation of hard rocks with the use of mechanical tools consist chiefly in a slow advance rate accompanied by an intensive wear due to the toughness and abrasiveness of t

    Dec 6, 2010

  • AUSIMM
    The Real Sample: Variations Between Dust, Chip and Core Drilling

    By R. A. Frith, M D. Goodz

    Ore-bearing minerals that are located along microfractures are always susceptible to loss during the breakage and sampling of the material. Further losses occur with on-site sample preparation and spl

    Jan 1, 1993

  • AUSIMM
    Atlas Copco Drill Rig Products for Mine Automation and Communication ù A Totally New Technology Platform for Advanced Mining Systems

    In mid-1998 Atlas Copco Rock Drills AB introduced the first member of a new family of drill rigs. This new family, Rocket Boomer L1C/L2C/L3C, is based on modern computer technology and also on what is

    Jan 1, 2003

  • AUSIMM
    The Geology of the Rum Jungle Uranium Deposits

    Three major and two minor uranium deposits 'have been worked by open out mining since the discovery of ,the Rum Jungle field in 1949. Total production has been about 9679000 tons of uranium ore

    Jan 1, 1968

  • AUSIMM
    Application of Fluidsied Bed Technology to Reduction of Australian Mangansse and Iron Ores

    By Brent A. D, Olsen a. H, Mayfield P. L J, Grazier P. E

    Concentrates produced from MnO2 and Fe203 ore fines have been targeted as potential feedstocks for direct metallurgical processing. Prereduction of pyrolusite-rich Mn02 sands to MnO has been investi

    Jan 1, 1995

  • AUSIMM
    Sampling and Sample Preparation Systems for Hamersley Iron Ore Products at the Port of Dampier

    Sampling and sample preparation systems at the Hamersley Iron Pty. Limited port of Dampier, W.A., were developed for two separate objectives. 1. The need for rapid determination of physical propert

    Jan 1, 1976

  • AUSIMM
    Two- and Three-Dimensional Numerical Analysis of the Interaction Between Open Pit Slope Stability and Remnant Underground Voids

    By M E. Pierce

    Recent advances in comminution and heap leach technology have resulted in the development of many large-scale, low-grade open pit mines that coincide with areas of historical underground workings. Two

    Jan 1, 2003

  • AUSIMM
    The Calculation of the Fragmentation of Rock from Cratering

    The fragmentation of whole rock by blasting has an influence on the subsequent loading, hauling and crushing operations. However, no method of calculating the frag- mentation has yet been developed

    Jan 1, 1977

  • AUSIMM
    Prediction of Precious Metal Heap Leach Behavior by use of Unsteady State Models

    By Hendrix J. L, Nelson J. H

    A model based on non-steady state has been developed for dissolution and diffusion in porous ore particles. Results from the particular model have been incorporated, as a rate term, into a global, h

    Jan 1, 1991

  • AUSIMM
    L & M Mining Limited - Twenty Years of Alluvial Gold

    Lime and Marble Limited was founded by the late T J McKee OBE and his family in 1935. The Company had its base in the high grade marble deposits on Takaka Hill, and was also shipping crushed limestone

    Jan 1, 1998

  • AUSIMM
    Observations on the Mineral Constitution of the Broken Hill Lode

    The occurence of high silver values in the oxidised zone of the main lode at Broken Hill is well known as a large factor in achieving the early fame of Broken Hill, and the minerals of this zone form

    Jan 1, 1926

  • AUSIMM
    Gas Utilisation

    APPIN AND TOWER METHANE ENERGY PROJECTA world first in energy innovationBHP has teamed with Energy Developments Limited and Lend Lease Infrastructure, to establish an electrical power generation facil

    Jan 1, 1998

  • AUSIMM
    Mount Isa Mines Limited Heavy Medium Preconcentration Plant- Six Years after Commisioning

    By Pease JD

    This paper reviews the changes in operating practices made in the heavy medium plant to meet the objectives of increased silver, lead and zinc production at lower operating cost. The effects of medi

    Jan 1, 1988

  • AUSIMM
    The South Australian Exploration Initiative - Benefits to Government and Industry (ba664968-7b43-4f1f-9c73-983334263249)

    Mining has long been an important activity for the people of Australia. The Aboriginals used rocks and minerals in their culture many thousand years before European settlement. It was not until 184

    Jan 1, 1995

  • AUSIMM
    Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings Impoundment

    By G W. Wilson

    Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b

    Jan 1, 2003

  • AUSIMM
    Data Mining Mining Data - Ordered Vector Quantisation and Examples of its Application to MIne Geotechnical Data Sets

    By B L. Dickson, E, M F. Lee, P A. Mikula

    Computational techniques are needed to assist in the analysis and interpretation of the increasing amounts of geoscientific and mining related data and information that are routinely gathered at mine

    Jan 1, 2006

  • AUSIMM
    Telfer Project ù Mine Dewatering ù Risk Assessment and Concept Optimisation

    The Telfer Gold Mine, owned and operated by Newcrest Mining and located in Western Australia, is currently being expanded. A new underground sublevel cave development is proposed along with an appreci

    Jan 1, 2003

  • AUSIMM
    Designing the Optimal Flotation Circuit - The Prominent Hill Case

    By P J. Colbert, P D. Munro

    OZ Minerals' Prominent Hill copper-gold concentrator in South Australia was built in 2008 with commercial production commencing in early 2009. In addition to recovery of valuable minerals, the fl

    Jan 1, 2009

  • AUSIMM
    Cover Design of a Backfilled Open Pit Based on a Systems Approach for a Uranium Mining Site

    By R Kahnt, S Jahn, D Baacke, M Eckart

    Relocation into the Lichtenberg open pit mine of about 110 million m3 of sulfide-bearing and ARD-generating waste rock piled up on the surface is the most important and cost-intensive single surface r

    Jan 1, 2003

  • AUSIMM
    On-Line Moisture Determination of Ore Concentrates ù A Review of Traditional Methods and Introduction of a Novel Solution

    By P Barrette

    The manual gravimetric drying moisture determination methods currently employed by most mineral processing plants fail to provide timely and accurate information required for automatic control. The co

    Jan 1, 2003