Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Extraction of Tin-Problems and Developments

    The main features and recent developments in the processes of benefication and extractive treatments of tin ores are reviewed. The need for development of processes to recover fine tin, tin from low-g

    Jan 1, 1992

  • AUSIMM
    Geotechnical Studies for Open Pit Mines - West Australian Operating Experience

    Recent operating experience from West Australian open pit gold mines has shown that geotechnical input into initial design is rare. As a result, ground stability is poor - almost half the pits designe

    Jan 1, 1990

  • AUSIMM
    The Testing and Evaluation of Australian Placer Deposits

    Some important mineral fields are referred to in discussing the formation of placer deposits in Australia. Testing methods include boring hand, with percussion rigs; with auger and pit digging drills;

    Jan 1, 1964

  • AUSIMM
    Excavation Engineering - The Integration of Excavation Design, Blast Design and Reinforcement Design

    By Chitombo G. P, Thompson A. G

    Excavation engineering involves three key design processes; excavation design, blast design and reinforcement design. An excavation engineering methodology is proposed in an attempt to promote integ

    Jan 1, 1995

  • AUSIMM
    The Design of Ventilation and Refrigeration Systems and Engineering Controls for the Enterprise Mine

    By R Brake

    The Enterprise Mine Project (EMP) is being developed by Mount IsaMines Limited as the future source of copper ore at the Mt Isa miningand processing complex. Environmental engineering is one of the ma

    Jan 1, 1998

  • AUSIMM
    Mill Modelling Using an Extensible Station-Based Framework

    By E A. Gunn, J Zhou

    In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen

    Sep 26, 2011

  • AUSIMM
    The Economic Advantages of Detailed Geotechnical Assessments for Extraction Sequencing

    By A Bennett, S Arndt

    Minerals and Metals Group Pty Ltd (Golden Grove Mine) commissioned a comprehensive study of the life of mine using advanced 3D stress modelling. Essential input into the modelling was the proposed min

    Mar 24, 2014

  • AUSIMM
    A Case for Revision of Time-Honoured Mine Ventilation Design Parameters through Active Field Observations

    By B Belle

    "Mines around the world are inherently and operationally diverse. Current methodologies for the design of mine ventilation and cooling infrastructure involve controlling major safety and health hazard

    Jun 1, 2012

  • AUSIMM
    Razorback Iron Ore Project – A New Iron District to Meet the Growing Demand of an Iron Hungry World

    By M Flis

    The Razorback Iron Ore Project is a high tonnage, low-grade magnetite deposit that defines a new iron ore district in South Australia. Known since the 1960s, the deposit has come into its own as the i

    Jul 11, 2011

  • AUSIMM
    Alternative mineral processing strategies for copper-gold tailings management

    By C Antonio, R Narayan, A Scheuermann, S Quintero, M Edraki, M Ziemski

    Tailings are mostly loose material and can be classed as non-plastic sandy silts. They also tend to have low permeability, resulting in slow consolidation (settling) rates and low shear strength, even

    Aug 2, 2023

  • AUSIMM
    Fosterville gold mine – breaking the mould for Victorian gold

    By N Phillips

    Fosterville gold mine recently celebrated production of its one millionth ounce of gold based firmly within a history of refractory sulfide gold mining. Compared with other Victorian gold mines, the d

    Sep 20, 2017

  • AUSIMM
    Lower Lea Valley Cable Tunnels - A Case Study of a Program Critical Project

    The purpose of the Lower Lea Valley Cable Tunnel project is to relocate the overhead power lines circuits, which currently cross the proposed site for the 2012 London Olympics in East London. This was

    Jan 1, 2008

  • AUSIMM
    Summary (73770012-07fb-483a-a6ee-41eedab7b659)

    Industry has a very special request to make. Environmental issues must not be allowed to become a factor of competition so that nations or individual industries can gain economic advantages for them

    Jan 1, 1971

  • AUSIMM
    Exclusion Zone Calculation for Underground Explosives Storage

    By M B. Lovitt

    At present there exist few engineering calculations and principles to determine exclusion zones for personnel in the vicinity of underground explosive storage areas. This paper is written to encourage

    Mar 24, 2014

  • AUSIMM
    Successful Mineral Resource Development at the Ernest Henry Copper-Gold Mine, NW Queensland

    By J D. Bryant

    The Ernest Henry Copper-Gold mine, the third largest copper deposit in Australia, is located 35 km NE of Cloncurry in the Mt Isa-Cloncurry mineral district of NW Queensland. Ernest Henry Mining Pty Lt

    Jan 1, 2003

  • AUSIMM
    Review on the Ore Deposit Denudation Degree

    By S Q. Zhao, J H. Wei, Z X Zhao, S N. Liang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The degree of regional denudation is one of the most important factors for judging the pres

    Mar 18, 2015

  • AUSIMM
    Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass

    By B Chapman, R Nievergelt, J Hill

    A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume

    Sep 17, 2014

  • AUSIMM
    A Column Bioleaching Model for Chalcocite ù An Investigation of Oxygen Limitation and Bacterial Inoculation on Leaching

    By M R. Davidson, M P. Schwarz

    A model for column bioleaching is investigated to identify and understand aspects of bacteria in bioleaching applications, which have implications in heap bioleaching operations. The model is used to

    Jan 1, 2004

  • AUSIMM
    The Influence of Surface Geometry on the Load Transfer Mechanisms of Grouted Bolts - A Laboratory Study

    By B Indraratna, A Dey

    The surface geometry of a rock bolt plays a very important role in the rock/resin/bolt load transfer mechanism. Very little work has so far been reported on the influence of the bolt surface geometry

    Jan 1, 2000

  • AUSIMM
    A Fully Integrated Approach to Mine Planning for Proposed Mineral Sand Projects

    This paper examines the complex interplay of deposit characteristics, mining plans, tailings disposal techniques and rehabilitation requirements on planning for mineral sands operations. All component

    Jan 1, 2001