Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dealing With Demands of Technical Variability and Uncertainty Along the Mine Value ChainBy M Noppe, I Glacken
There are many critical nodes along the mine value chain, from orebody to mineral product, and inter-disciplinary input is required to analyse the variability and uncertainty at each node in order to
Jan 1, 2002
-
A Method to Design Efficient Mine Backfill Drainage Systems to Improve Safety and Stability of Backfill Bulkheads and FillsA simple method of designing effective fill drainage systems for slurry backfill is presented. By using the proposed method, it is easy to calculate and predict the expected fill drainage rates or to
Jan 1, 2002
-
The Treatment of South Alligator Valley Uranium OresBy Fisher WJ
The'treatment of the South Alligator valley uranium ores passed through three phases dictated by economic circumstances during the years 1956- 640 In the first phase high grade ores were treated
Jan 1, 1968
-
Paper No. 171. Some Air Compressor Tests.SINCE writing the above-mentioned paper, some further indicator cards have been taken from the No. 1 machine, and the writers believe that a reproduction of these cards will be interesting as illustra
Jan 1, 1909
-
Hej Hej Sweden, Tak Atlas Copco - The 2006 Atlas Copco Scholarship ExperienceBy J MacDiarmid
Atlas Copco is a leading provider of industrial productivity solutions (Atlas Copco, 2007) and one of the worldÆs largest suppliers of rock drilling equipment. The business division of Atlas Copco Con
Jan 1, 2007
-
Mine Planning and Scheduling at Ranger Uranium Mine-Environmental Requirements and EconomicsRanger Uranium Mines (RUM) operates an open cut located in the Top End of the North- ern Territory. Strict environmental controls govern all operations and the water management requirements have th
Jan 1, 1984
-
A Proposed Modification of The Square SetWhen the writer first saw the square-set timbering, he was at once impressed with the fact that the frames made by the sets, along the lode amI across it, were composed of panels with rectangular open
Jan 1, 1911
-
History of Mining and Metallurgy Along the Pacific RimBy Lacy JC
Human habitation of the Pacific Rim began when mankind began migrations out of its place of origin in the Rift Valley of Central Africa c. 4million years ago. This migration was erratic and largely co
Jan 1, 1990
-
Rainfall Patterns Rather than Climate Classification Control Cover Design for ClosureBy T Baumgartl, B Richards
Covers on waste rock and tailings remain the primary choice for closure planning where the purpose is to create an environment where water ingress into reactive material can be controlled and/or preve
Jun 28, 2016
-
Improving Efficiency of Sealing Off Water by PregroutingAND INTRODUCTION The Lochiel coal deposit, a large Tertiary soft brown coal deposit in the mid north of South Australia, is currently being investigated by the Electricity Trust of South Australia (
Jan 1, 1988
-
The Weipa Kaolin Project (37afd6f9-e7cd-4419-b3aa-f6892748e3dc)Comalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operations at Weipa. The plant will produce 100,000 tonnes p
Jan 1, 1988
-
Interdisciplinary Approach to the Analysis of Acid Mine Drainage at an Underground Lead Zinc MineBy Williams RE, Ralston DR
Acid mine drainage is a serious environmental and economic concern, resulting in regulation of the mining industry and significant water treatment costs. An interdisciplinary approach is needed to a
Jan 1, 1988
-
The Tolukuma Gold Silver-Vein System, Papua New Guinea (3cebb8ab-1142-46c7-bc74-b33c04791680)By Corbett GJ, Leach TM
A continued exploration programme has further defined the geology of the Tolukuma vein system, verified the resource indicated by Newmont, and identified potential for additional mineralisation. The
Jan 1, 1995
-
Design and Operation of the Dewatering System for the Lochiel Trial PitBy Sullivan TD, Redman PG
AND INTRODUCTION The Lochiel coal deposit, a large Tertiary soft brown coal deposit in the mid north of South Australia, is currently being investigated by the Electricity Trust of South Australia (
Jan 1, 1988
-
Sampling Surficial Sediments of a River Receiving Minewater DischargesBy Adeloju S, McQuade CV, Riley SJ
Metal contamination of sediments can be an issue for minesites discharging water. Water sampling of receiving waters is frequently undertaken. Sampling and analysis of sediment is less common. The var
Jan 1, 1998
-
Sinking No. 3 Elliptical Shaft at North Broken Hill Limited Broken Hill, N.S.W.This paper describes the operation involved in the sinking of a concrete-lined elliptical-shaped shaft at North Broken Hill Limited.Major factors such as geological features, future ventilation, ore h
Jan 1, 1956
-
The Toka Tindung Gold Project Northern Sulawesi, IndonesiaBy Tuckey SH, Wake BA, Ariti J
Astute exploration on the northern Minahasa Peninsula, North Sulawesi, resulted in the discovery of the Toka Tindung, Pajajaran, Blambagan and Araren low-sulphidation quartz-adularia vein and stockwor
Jan 1, 1997
-
The Tolukuma Au/Ag vein system, Papua New GuineaBy Semple DG, Leach TM
A continued exploration programme has further defined the geology of the Tolukuma vein system, verified the resource indicated by Newmont, and identified potential for additional mineralisation. The r
Jan 1, 1994
-
Three-Dimensional Combined Gravity and Magnetics Inversion Modelling as a Guide to Target Haematitic Iron Ores û An Example from the Koolanooka South (Western Australia) ProspectBy J Finlay, P Betts, D Milton, H Williams
The aim of this paper is to present an innovative method to help delineate potential target volumes for haematite-goethite mineralisation as opposed to more magnetic ores. This is achieved through int
Jan 1, 2009
-
Computer Control of Grinding and Flotation at the Zinc Corporation, Limited and New Broken Hill Consolidated LimitedThe philosophy of computer control of grinding and flotation at ZC/NBHC is presented. The performance and reliability of the in- stalled systems are discussed.
Jan 1, 1978