    Commissioning the Electrolytic Zinc Plant at Port Pirie

    Problems encountered in the design, construction, acceptance, commissioning and early operation of the electrolytic zinc plant at Port Pirie are reviewed. Recommendations based on the author's e

    Jan 1, 1971

  • AUSIMM
    Ore Sorting and Artificial Vision

    By Artieda JJ, Catalina JC

    - The aim of this paper is to analyse the possibilities of applying signal processing and artificial vision techniques to the ore sorting problem. In order to overcome the limitations imposed by the c

    Jan 1, 1985

  • AUSIMM
    Computer Simulation of the Control Systems for the Heavy Media Coal Preparation Process

    Computer simulation of the control systems for the heavy media coal washing process have been presented in this paper. The simulation model applies the Simulink module of the Matlab 5.1 software pac

    Jan 1, 1998

  • AUSIMM
    The Effect of Blast Design on the Lump:Fines Ration at Marandoo Iron Ore Operations

    By Chapman J, Kanchibolta S. S Poetschka N L

    A field study was undertaken at Marandoo iron ore operations to investigate the effect of blasting on the lump/fines ratio. Three blasts, each in a different ore domain were monitored and the blaste

    Jan 1, 1998

  • AUSIMM
    Shell-supported Grinding Mill for the Ernest Henry Project

    Tumbling mills have been used in the minerals indusu) for occr WO years, with the design changing little, but the size of the individual pieces of equipment increasing significantly with the lowerin

    Jan 1, 1997

  • AUSIMM
    A Model To Control Bins for Hydraulic Hoisting

    A model has been developed for the per iodical maintenance of bins used for hydraulic hoisting in mining of steeply inclining coal seams. This model gives a control plan for hoisting, bin switching

    Jan 1, 1977

  • AUSIMM
    Two South Australian Coastal Rehabilitation Programmes After Mining

    Two separate mine rehabilitation programmes carried out by Australian Consolidated Industries Limited (A.C.I.) in South Australia at Normanville and Port Lawler are discussed. Emphasis is given to

    Jan 1, 1976

  • AUSIMM
    A New Design of Pulp Lifter for Grate Discharge Mills

    By Morrell S

    As more and more autogenous and semi-autogenous mills are run in closed circuit with cyclones the limitations that can be imposed by poor grate and pulp lifter design are becoming increasingly appar

    Jan 1, 1997

  • AUSIMM
    Structure of the Integrated Mine Control System at Kemi Chrome Mine

    By Toivanen R-M, Leinonen O, Pekkarinen H

    This paper presents developments in designing an integrated mine control system at Kemi mine. The aim of this paper is to present the general structure of the system and to outline some features of

    Jan 1, 1998

  • AUSIMM
    Tracking Coal Fragmentation from Pit Face to Plant Feed

    By Thornton D, Firth B, Kojovic T, Brien G, O&apos

    Coal fragmentation is a function of coal type and mining process. Each unit step in the mining, handling and crushing chain of coal imparts energy to the material and impacts on size degradation and

    Jan 1, 1998

  • AUSIMM
    Economic Loss Fucnctions and Geostatistical Simulation for Grade Control Applications

    By Koppe J. C, Dimitrakopoulos R, Costa J. F

    Grade control and the delineation of ore/waste in open pit operations is traditionally based on the comparison of estimated grades with an economic cut-off. This paper deals with an alternative appr

    Jan 1, 1998

  • AUSIMM
    A New Method for Estimating the Full-Scale Grind Target for Flotation from Laboratory Batch Grinding and Flotation and Reference Full-Scale Tests

    By Liu Y, Campbell K. R

    The paper shows how breakage parameters may he extracted from laboratory batch grinding results and how they may used with reference full-scale hall mill circuit data to estimate the likely size dis

    Jan 1, 1997

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Full PSD rejects shear strength testing for co‐disposal and assisted tailings dewatering technique selection

    By G Burton, S Fityus, J Li, S Vaughan, D Payne

    Daunia and Caval Ridge coal mines, owned and operated by BHP, have been co-disposing rejects and dewatered tailings within spoil dumps from the beginning of their operations in 2013 and 2014, with the

    Jul 1, 2021

  • AUSIMM
    Analysis and Management of Loads on Paste Backfill Barricades

    By M Fahey, A B. Fourie

    Over the past ten years, the mining industry has witnessed the introduction of a new and innovative mine filling technique known as paste fill, which consists of placing full stream tailings with smal

    Jan 1, 2008

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    Optical and SEM-Based Microscopy Integration for Optimisation of Geometallurgical Modelling and Ore Deposit Characterisation

    By R Hartner

    Digital optical microscopy (DOM) and automated SEM-based (ASEM) mineralogy systems (MLA, QEMSCAN) have experienced significant developments within the last decade. However these developments have been

    Sep 5, 2011

  • AUSIMM
    Novel Use of Ice Thermal Storage for Energy Management on a Mine Refrigeration Plant

    By R W. Wilson, A R. Branch, T S. Pooe

    The original bulk air cooling system at this particular mine made use of two water chilling refrigeration machines to produce peak cooling of approximately 12 MWR with a downcast air temperature of ab

    Aug 31, 2015

  • AUSIMM
    Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo

    By M G. Millad, M Zammit

    The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa

    Aug 18, 2014

  • AUSIMM
    Physical modelling of tailings dam breach: exploring overtopping following shear failure

    By W A. Take, M McKellar, A Walsh, S McDougall, S G. Evans

    Recent tailings dam failures have heightened public awareness of the hazard posed by storage facilities for mining waste, illustrating the need for a more critical examination of tailings dam breach m

    Jul 1, 2021