Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Round Hill Gold-Scheelite Deposit, Macraes Flat, Otago, New Zealand

    The Round Hill gold-scheelite deposit is located three kilometres from Macraes Flat and approximately 60 kilometres due north of Dunedin, New Zealand. A mining feasibility study is currently being und

    Jan 1, 1987

  • AUSIMM
    Treatment of a Thallium-Cadmium Concentrate

    Thallous chloride and cadmium metal were recovered from a thallium-cadmium concentrate by a method suited to the treatment of small batches. Differences in oxide solubility and control of pH were empl

    Jan 1, 1969

  • AUSIMM
    Rapid Reconnaissance Trench Sampling for the Exploration Industry

    The increasing use of Ditch Witch trenching to define gold ore bound- aries in supergeme enriched near surface open cut mines has led to the consideration of using this technique for other sampling p

    Jan 1, 1988

  • AUSIMM
    Deep Paste Thickening Systems

    By F Schoenbrunn, T Laros

    Deep paste thickeners have been proven capable of consistently producing medium to low slump material for disposal without the need for filters. However, proper design of the entire system is critical

    Jan 1, 1998

  • AUSIMM
    Crown Minerals - Where it is at, What it Does

    My topic for today is the Crown Minerals of the future. New work initiatives are underway and the organisational structure is being overhauled. These are not insignificant changes and in this paper br

    Jan 1, 2003

  • AUSIMM
    A Look at Environmental Risks to Mine Projects with Special Reference to the Role of Governments

    The types of risk to mining projects using environmental protection as justification are examined. In Australia, Governments, whether Federal or State, enforce environmental legislation. The way the

    Jan 1, 1994

  • AUSIMM
    Stability of Metal-Cyanide and Hydroxide Complexes

    The aim of the study was to determine the ranges of stability and instability of the metal hydroxides and metal cyanide species that may be formed during the gold extraction process, Merrill-Crowe gol

    Jan 1, 1997

  • AUSIMM
    The Management of Project Development

    By Conway KM

    The traditional role of Australian Consultants in project development has been until recently restricted to the provision of discrete packages for survey and engineering services during the feasib

    Jan 1, 1983

  • AUSIMM
    Development And Operation Of Tailings Dump Retreatment Facilities At ZC/NBHC

    By Bertrand D. L

    Although investigations into treatment of Mt. Keast (a hill of tailing) began as early as 1940, it was not until the Imperial Smelting Furnace (I.S.F.) was installed at Cockle Creek by Sulphide Co

    Jan 1, 1983

  • AUSIMM
    Determination of Noble Metals at Crustal Abundances

    By Ryan CG, Cousens DR, Suter GF, Griffin WL

    A novel method utilizing PIXE with microbeams following fire-assay has been developed to determine PGE and Au at sub-ppm levels suitable for application in exploration. Analyses of the prills from

    Jan 1, 1989

  • AUSIMM
    Metallurgical Process Development and Plant Design

    By Ritchie I, Fleay J

    The key issues in the conceptualisation and testing of treatment options for gold and base metals mineral processing projects are discussed. A prerequisite of this process is the need for close int

    Jan 1, 1997

  • AUSIMM
    Can Cross-Belt Cutters be Trusted?

    By P W. Cleary, M D. Sinnott

    Cross-belt cutters are commonly used for sampling coal. They are generally cheaper than falling-stream cutters, particularly when a cutter must be retrofitted. The major mechanisms thought most likely

    Jan 1, 2008

  • AUSIMM
    Gold Mill Expansion at Kambalda

    The design, construction and operation of a 500,000 tonne per year Carbon-In-Pulp (C.I.P.) plant at Kambalda embracing the period from 1980 to 1982 has been previously discussed (Sceresini, 1982).Sinc

    Jan 1, 1984

  • AUSIMM
    Computer-Aided Geomechanics

    The purpose, basic data requirements and various analysis/modelling tools employed for geomechanical evaluation of mine-site conditions are overviewed. The impact and application of computer techn

    Jan 1, 1983

  • AUSIMM
    The Options for Cooling Deep Mines

    By Van Rensburg C S J

    The options that are open to engineers for cooling mines are limited and are primarily dependent upon the thermophysical properties of coolants. These properties are carefully analysed in the cont

    Jan 1, 1988

  • AUSIMM
    Utilisation of Readings Wet High Intensity Magnetic Separators at Richards Bay Minerals

    By James D, Dawson N

    The alternate mineral dressing tech-niques for the production of ilmenite roaster feed from heavy mineral concentrate and the reasons for the selection of wet high intensity magnetic separation (WHIMS

    Jan 1, 1986

  • AUSIMM
    Footwall Mineralogy of the Old Waite Massive Sulphide Deposit, Noranda, Quebec: Hydrothermal, Prograde and Retrograde.

    The mined-out Old Waite volcanogenic Cu-Zn deposit lies in the Noranda mining district of northwestern Quebec. The deposit has a distinctive pipe-like zone of alteration beneath the massive ore, ex

    Jan 1, 1989

  • AUSIMM
    Discovery of the Hamersley Iron Deposits (Duck Creek - Mt.Pyrton - Mt. Turner Area)

    By Burks WG, Hughes FE, Muceniekas E, Whitcher IG

    The area containing the iron field, recognised by the writers, is part of an uplifted, portion of the 'Western Australian Plateau,' ranging in elevation from about 1,000 feet to about 30

    Jan 1, 1964

  • AUSIMM
    Resource and Reserve Calculations - The Experience at BHP-Utah Coal Limited

    The process of evaluating orebodies at the feasibility study stage is extremely important. In recent times many groups have indicated that they would like ore reserve estimation to be numeric and o

    Jan 1, 1990

  • AUSIMM
    Diversion Tunnels for the Magat River Multi-purpose Project-Geotechnical Aspects

    The paper describes the geotechnical as- pects of design and construction of two 12 m diameter concrete lined tunnels from the start of design to completion of construction. Prob- lems occurred due

    Jan 1, 1981