Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A New Future at HBMS - The 777 Project

    The paper describes the $US240 million expansion at Hudson Bay Mining and Smelting Co LimitedÆs operations in Canada. The company has been continuously producing copper and zinc from local area mines

    Jan 1, 2000

  • AUSIMM
    The Regulatory Environment for Expert Reports NCSC and ASX Requirements

    I stand here as a financial advisor who has been particularly close to the whole concept of reporting, independence and all the issues that are brought together in Release 149. However, I was asked

    Jan 1, 1989

  • AUSIMM
    Comminution Research - A Success Story that has not yet Ended

    Some fundamental aspects of recent single-particle fracture studies are reviewed. Findings from this research shed new light on the utilisation of energy during comminution operations and provide us

    Jan 1, 1993

  • AUSIMM
    Excavation Design and Ground Support of the Gyratory Crusher Installation at the DOZ Mine, PT Freeport Indonesia

    By A Mulyadi, J Barber, R Golden

    The Deep Ore Zone (DOZ) underground mine will be a 25 000 tpd mechanised block cave operation starting production in 2000. The ore handling system consists of a direct truck dumping 54 +74 gyratory cr

    Jan 1, 2000

  • AUSIMM
    Pelletisation of Coal Fines: An Experimental Study

    Modern mining and coal cleaning techniques lead to the generation of large quantities of fines which give rise to problems in their storage, handling, transportation and further processing. Pelletisat

    Jan 1, 2000

  • AUSIMM
    Adsorption of Organic Dye Depressants on Carbonaceous Sulphide Ores

    Organic dyes such as nigrosine and sun yellow act as depressants for carbonaceous particles in the, flotation of sulphide ores. Depression is achieved when initially hydrophobic organic surfaces are

    Jan 1, 1975

  • AUSIMM
    Process Control Developments at Queensland Alumina

    The completion of the 3rd expansion at Queensland Alumina added 725,000 t.p.y. capacity to what was already the world's largest alumina refinery. Rated design capacity is now 2.0 million t.p.

    Jan 1, 1974

  • AUSIMM
    Non-Ideal Explosive Performance Prediction Using the CPEX Model

    By Minchinton A

    CPeX is a non-ideal explosive performance prediction model. The model takes into account the rate of energy release, the extent of chemical reac- tion and the effect of confinement on energy release.

    Jan 1, 1988

  • AUSIMM
    An Expert Neural Network to Control a Mineral Flotation Process

    By Durao F

    A multi-layer feed-forward neural network was trained (using the error back-propagation algorithm) to learn a subset of rules designed to stabilise the performances of the copper flotation section o

    Jan 1, 1995

  • AUSIMM
    Monitoring Underground Diesel Emissions û Two Solutions

    Diesel-engine exhaust emissions represent a concern to the mining industry due to the poten- tially harmful health effects of the pollutants, as well as high costs associated with providing proper

    Jan 1, 1988

  • AUSIMM
    The Corex Process Hot Metal Production by Coal Reduction

    By Kepplinger W

    The COREX process is a technology for production of liquid hot metal on the basis of coal (without the use of a coking plant) developing by VOEST- ALPINE AG, Austria and its subsidiary company Kor

    Jan 1, 1987

  • AUSIMM
    Rock Bolt Testing

    Rock bolting provides a supplement or alternative to conventional timber and steel supports. The tensile strength of the bolts lies within a range established by manufacturing quality control. Rock

    Jan 1, 1971

  • AUSIMM
    Evaluation of a Dragline-Hopper-Truck Mining System

    By Dickerson A. W

    The most important mining problem facing many of the established surface coal mines in the Bowen Basin area of Queensland is the rising cost of overburden stripping associated with increasing depths t

    Jan 1, 1992

  • AUSIMM
    Financial Rewards for Innovators and Risk-Takers

    By Warren M

    Many Australian tunnelling and mining companies regularly investigate different methods or equipment in an attempt to keep ahead of their competition. Sometimes the result is a new approach or process

    Jan 1, 1993

  • AUSIMM
    The Imperial Smelting Furnace-Hearth and Raceway Considerations

    Consideration is given to the factors affecting raceway activity and the hearth design of a zinc-lead blast furnace. Results of measurements made on operating furnaces are given and comparisons ar

    Jan 1, 1981

  • AUSIMM
    Simple Prediction of the Processing Characteristics of Ores Using QEM*SEM

    By Johnson CR, Wilkie G

    The aim of the study was to use quantitative mineralogical measurements to predict the processing characteristics of an ore. Samples were taken from a wide range of concentrators processing ores of

    Jan 1, 1989

  • AUSIMM
    Modern Personal Computer Tools for Mining and the Environment

    This paper deals with innovative techniques that have enabled personal computers to be used on the mine site to define, develop and manage an ore body resource, while being aware of the consequences

    Jan 1, 1996

  • AUSIMM
    The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design Criteria

    By Mack JF

    A metallurgical evaluation of the Argyle Kimberlite No. 1 (AKl) orebody has been carried out using a 40 tonnes per hour pilot plant. Pilot plant results, together with laboratory investigations pro

    Jan 1, 1984

  • AUSIMM
    A Practical Test of Coal Spontaneous Combustion

    By Gillies A. D S

    A device has been developed for modelling the behaviour of coal under conditions which may lead to spontaneous combustion. It is designed to model the behaviour of a stockpile of large mass. The app

    Jan 1, 1995

  • AUSIMM
    The Ediacara Mineral Field

    This paper deals briefly with the geology and mineralisation of the Ediacara Mineral Field, which is located about 300 miles north of Adelaide in the Mount James Range.The field was discovered sane ti

    Jan 1, 1963