Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Reliability of Finite Element Analysis of Longwall Extraction in British Coal MinesBy OÆGrady P
Finite element analysis is becoming a routine component of design of longwall extractions, now superseding more traditional somewhat intuitive approaches. Finite element modelling is relatively inexpe
Jan 1, 1991
-
Microstructure in Predicting Waste Rock Degradation for Mining in the Hauraki GoldfieldBy D S. Clarke, W M. Prebble
Potential waste rock products from the mining of epithermal deposits in the Hauraki Goldfield are characterised to facilitate their management. Hydrothermally altered andesites and their weathered nea
Jan 1, 1991
-
Coalification - Deformation Relationships in the Upper Hunter Valley, New South WalesVitrinite reflectance forms the basis of a study of coal rank variation in two areas of the Upper Hunter Valley, New South Wales, on the northern margin of the Sydney Basin. A selective analysis proce
Jan 1, 1980
-
Potential for the Utilisation of Micro-Organisms in Gold ProcessingBy D C. McPhail, S L. Rogers, J Brugger
Using iron- and sulfur-oxidising bacteria to catalyse the breakdown of sulfides that host the gold is an important biological method for the pretreatment of refractory gold ores. Following this biolog
Jan 1, 2007
-
Use of Large Twin-Power Scrapers in Prestrip OperationsThe use of scrapers in mining and earthmoving operations is not new, in fact they are one of the earliest methods of bulk earthmoving. A single machine which can load, haul, and dump material with a m
Jan 1, 2003
-
Eh-pH measurement for problem solving in a zinc reverse flotation processBy Munro P. D
Eh-pH measurements were taken on an industrial zinc reverse flotation process at Brunswick Mining and Smelting Corporation Limited. Laboratory zinc reverse flotation testwork on samples of the feed to
Jan 1, 1988
-
Accreted Terranes and Porphyry Copper Deposits in the Central AndesThe Central Andes in Peru, Chile, Bolivia, and Argentina , contain two contiguous terranes which were accreted to Gon
Jan 1, 1995
-
Take 5 – hero or villainBy M Hassall, E Humphries
Personal risk assessment processes, also known as Take 5 or SLAM (Stop, Look, Assess, Manage) have been utilised in high hazard industries for over 30 years. However, there is limited research to unde
Apr 16, 2024
-
The Operation of the LAROX PF-50 Pressure Filter at 'Ellatzite-Med' Flotation Plant, BulgariaThe Operation of the LAROX PF-50 Pressure Filter at 'Ellatzite-Med' Flotation Plant, Bulgaria The implementation of Larox pressure belt filter, type Larox PF-50 provided within 6˜8% moistur
Sep 13, 2010
-
Seismic Response Prior to Spalling Failure in Highly Stressed Underground TunnelsBy E Villaescusa, A Kusui
The depth of underground mines has been increasing due to several factors, such as material demand growth and improving technology. It is a challenge to understand severe failure mechanisms such as sp
May 9, 2016
-
Importance of Strain to Fragment Strength in Blasting Induced Pre-ConditioningImportance of Strain to Fragment Strength in Blasting Induced Pre-Conditioning When a rock is blasted, cracks propagate through the rock causing the rock to fracture. This paper focuses on applying th
Sep 13, 2010
-
Geology of the Eastern Creek Volcanics in the Mount Isa DistrictThe Precambrian Eastern Creek Volcanics comprises spilitic basalts with interbedded sediments and tuffs which were extruded and deposited during Middle Proterozoic time. The rocks have undergone low-g
Jan 1, 1968
-
The Role of Cost Estimating in Mine Planning and Equipment SelectionThe objective of a mine planning exercise is to plan a safe mine that maximises net present value (NPV) for the project. Two primary elements are key to design of a mine plan optimised to maximise pro
Dec 6, 2010
-
Mineral Project Management - A Perspective from Four Decades in the IndustryBy J S. Dunlop
At its most basic level, minerals project management may be broken down into a series of logical chronological phases, described in this paper as: exploration, discovery; scoping and pre-feasibility;
Jul 15, 2013
-
Correcting Preferential Flow Problems in Long Orepass Systems at Henderson MineBy J Gresham, A Turichshev
Ore from Henderson’s 7700 Southwest panel cave is transported between the production and truck haulage levels through a series of orepasses. A typical orepass complex consolidates dump points from fou
May 9, 2016
-
Comparison of Ore Dressing Methods Used by Ilmenite Producers in Western AustraliaIlmenite production in Western Australia commenced in 1956. There are now five producers, all in the Bunbury-Capel district, and current total production capacity is about 450,000 t.p.a.The deposits o
Jan 1, 1965
-
Application of Reverse Flotation in Upgrading Western Australian Magnetite Iron OresBy Misra V. N
Upgrading of a Koolanooka magnetite iron ore sample provided by Kingstream Steel Ltd was investigated using low intensity magnetic separation (LIMS) and reverse flotation. The ore contained 38.6 per
Jan 1, 1999
-
Internalising Ecological Costs in Evaluating and Planning a Mining ProjectBy Q Wang
Net present value (NPV) has been the main criterion in mining project evaluation and production plan optimisation. It is a common practice in NPV calculations to take into account only the tangible co
Sep 26, 2011
-
New Developments in Spirals and Spiral Plant OperationsNew Developments in Spirals and Spiral Plant Operations Records indicate that spiral separators have been utilised in mineral separation for over 100 years. The Spiral's predecessor, the sluice,
Sep 13, 2010
-
Detachment of Particles from Bubbles in a Stirred CellDetachment of Particles from Bubbles in a Stirred Cell
Sep 13, 2010