Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Online Slurry Analysis for Process Control and Monitoring at Iron Ore Concentrators

    By M J. Kongas, K M. Saloheimo

    This paper presents the art of on-stream particle size and elemental analysis used at iron ore concentrators, followed by the results and experiences from several sites.Online particle size analysis i

    Aug 12, 2013

  • AUSIMM
    Roa Greymouth Coalfield - Geology and Mining

    By B Moynihan

    The Roa Opencast Coal Mine is situated at the north-eastern end of the Greymouth Coalfield. It lies on an eastern flank of the Paparoa Range, 16 km north-east of the town of Greymouth on the West Coas

    Jan 1, 1993

  • AUSIMM
    Performance of Model Predictive Control on the Crushing Circuit at Sishen Mine

    By E K. Leeka

    Process control limitations have led to suboptimal performance of the crushing section of Sishen MineÆs Jig Plant. The performance of the PID (proportional-integral-derivative) controller implemented

    Aug 12, 2013

  • AUSIMM
    Cave Tracker Flow Monitoring System Installation at Argyle Diamond Mine

    By M Wilson, D Whiteman, P Kuiper, S Talu, G Watt, A van As

    Once the draw process has begun in a block cave, it is very difficult to identify which regions of the cave have successfully propagated, where the caved material is flowing from and where it is flowi

    May 9, 2016

  • AUSIMM
    Stockton Mine Acid Rock Drainage Remediation û Part 2 - Treatment

    By P Lindsay, J B. Hughes

    Underground and opencast coal mining has been ongoing since 1896 on the Stockton Plateau, West Coast, New Zealand. Acid Rock Drainage (ARD) from historic and current mine workings has had an adverse e

    Jan 1, 2007

  • AUSIMM
    Geoscience input into blasting operations – let’s set a new standard

    By T N. Little

    The author contends that geoscience is presently under-utilised in the rock fragmentation by blasting process. Before we can set standards in this area, the following is required: mine geologists need

    Sep 20, 2017

  • AUSIMM
    Ore Localization by Preconsolidation Structures

    Some major mineral deposits in northern Australia are found in preconsolidation slump disturbances in the sediments.In the retransported marine sediments at Tennant Creek, breccia beds and disturbance

    Jan 1, 1960

  • AUSIMM
    Gravity Flow Full-scale Tests at Esmeralda Mine’s Block-2, El Teniente

    By D Garcés, M Meléndez, R Castro, E Viera

    Enhancing the understanding of gravity flow in caving operations is a key factor in the design, operation and success of caving methods. Consequently, much research has been performed to increase know

    May 9, 2016

  • AUSIMM
    Sub-Level Open Store Design on Northern Rhodesian Copperbelt

    The paper is a general review of practice in design of sub-level open stopes in Northern Rhodesian copper mines and gives examples of some interesting developments during the last five or six years. I

    Jan 1, 1954

  • AUSIMM
    Three Case Histories of the Self Potential Method of Base Metal Prospecting Within the Lachlan Geosyncline, New South Wales

    The results of self potential geophysical surveys conducted over base metal prospects near Orange, Goulburn, and Wellington, N.S.W., indicate that this rapid and inexpensive exploration procedure meri

    Jan 1, 1973

  • AUSIMM
    Technical Note on Recovery of Manganese from Low Manganese Content Ferromanganese Slag

    By Rao P. K, Sahoo P. K

    The main constituents of ferromanganese slags are silicates of Mn, Ca and AI. Factors affecting the recovery of manganese from a low manganese content ferromanganese slag (about 16 per cent MnO) durin

    Jan 1, 1979

  • AUSIMM
    X-Ray Diffraction Analysis of Broken Hill Dusts

    The problems of using comparatively simple x-ray diffraction equipment for quantitative analysis are examined. Internal standard and direct calibration procedures based upon the measurement of integra

    Jan 1, 1968

  • AUSIMM
    The Phased Metallurgical Upgrade Strategy at Gold Fields Limited South African Operations

    By A B. Phillips

    This paper details the approach adopted to upgrade the current metallurgical facilities at both the Driefontein and Kloof Gold Mines in the Republic of South Africa. Goldfields Ltd operates eight meta

    Jan 1, 2003

  • AUSIMM
    Crushing and Screening Operations at Mount Tom Price

    Mine ore, reduced to minus 71/2 in. by primary crushers, is stockpiled. Size reduction of the reclaimed material by secondary and tertiary crushers is achieved in a closed circuit crushing and screeni

    Jan 1, 1970

  • AUSIMM
    Zero Base Design and Risk Mitigation

    This paper examines the integration of risk management into the design philosophy of a project to produce a æzero baseÆ design, which targets a minimum capital cost without adversely impacting upon th

    Jan 1, 2004

  • AUSIMM
    Near real-time assay with downhole assay tool (FastGrade™ 100)

    By B Chi, A Mahanta, R A. M Maddever, O Dominguez

    BHP Billiton, in collaboration with Sodern and CSIRO, has developed a downhole logging tool for measuring geochemistry in situ. The FastGradeTM 100 (alternatively, FG100), exploits pulsed fast and the

    May 9, 2017

  • AUSIMM
    Alluvial Gold Deposits and Mining Opportunities on the West Coast, South Island

    By P M. Hancock

    The West Coast contains one of the world's giant placer gold deposits with production since the 1860s totalling some six million ounces (present day value NZ$ 3.6 billion). The deposits have been

    Jan 1, 1985

  • AUSIMM
    Presidential Address (c6bc4496-0254-49d2-8045-842af5b52d7d)

    The selection of Sydney and Port Kembla for the First Ordinary Meeting of the Institute for 1938 was, no doubt, a recognition of the celebrations marking the 150th Anniversary of the first settlement

    Jan 1, 1938

  • AUSIMM
    Features of the New Lead Refinery at Port Pirie

    A new lead refinery with a capacity of 230,000 tons per year commenced operation at Port Pirie in October, 1959. This plant superseded the refinery which had operated from 1933 with the advent of the

    Jan 1, 1963

  • AUSIMM
    Report on the Tin Field of the Blue Tier District, Tasmania

    THE area dealt with in this paper is included within a radius of about 3 miles of the Poimena township. Several thousand tons of tin have been won from this field, and probably £200,000 spent in

    Jan 1, 1912