Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Water Management Issues for Mining Proposals at the Environmental Impact Assessment Stage

    An Environmental Impact Statement (EIS) for a major mining development typically has to address various aspects of surface water management, including some which generally tend to be the more contenti

    Jan 1, 2003

  • AUSIMM
    A Forgotten Legacy of Gold Mining: Archival Research Leads to the Location and Identification of Gold-Bearing Mining Residue

    Gold was discovered in the Bendigo area of Victoria in 1851 (Willman and Wilkinson, 1993), and all the early gold mining of any note involved washing (puddling) the gold out of the regolith or allu

    Jan 1, 1997

  • AUSIMM
    Weighing of Open Cut Machinery

    An improved technique for the quick and accurate measurement of the weight and centre of mass in the horizontal plane of large machines has been developed. On-site weighing of large plant such as bu

    Jan 1, 1989

  • AUSIMM
    Development of Design Criteria for Upgradeable Friction Hoists

    Future depth and production limitations of an ore hoisting system are fixed by its initial design criteria. There is little scope to extend these limitations once installation is completed. Depth and

    Jan 1, 2005

  • AUSIMM
    The Mt Kasi high sulphidation Au system, Fiji

    By Taylor GP

    Mt Kasi in Fiji is a high sulphidation style of gold deposit exposed at a high crustal level. Individual alteration centres are localised at the intersection of cross structures within a through-going

    Jan 1, 1994

  • AUSIMM
    Upgrading of Indonesia's Bauxite by Washing Method

    Upgrading of Indonesia's Bauxite by Washing Method There were eight bauxite samples used in this research, three samples from Kijang contain total SiO2 18.36 - 29.16 per cent, Al2O3 40

    Sep 13, 2010

  • AUSIMM
    A Study of Solid State Prereduction as a Precursor to Smelting for Transition Metal Production

    Traditional methods for the production of transition metals from their ores usually include the electric arc smelting of the ore or concentrate to produce a ferroalloy. This is subsequently refined

    Jan 1, 1997

  • AUSIMM
    Development of the North West Queensland Water Pipeline

    By M Ewart

    The securing of a reliable water supply for a prospective mine in the North West Queensland Mineral Province is usually one of the most influential factors in determining the mine's feasibility.

    Jan 1, 1998

  • AUSIMM
    Development of a Sustainable Rehabilitation Strategy for the Management of Acid Rock Drainage at the Historic Mount Morgan Gold and Copper Mine, Central Queensland

    By T Laurencont

    The Queensland Department of Natural Resources and Mines (NR&M) accepted the environmental liability for the Mount Morgan minesite in 1991. This gold and copper mine located 38 km southwest of Rockham

    Jan 1, 2003

  • AUSIMM
    Continuous Vacuum Treatments of Molten Metals and Alloys

    By Fitzgerald DE, Taverner MG

    The principles, fields of application and equipment design concepts of several new approaches to continuous vacuum treatments of molten metals and alloys are discussed. Partic- ular attention is pa

    Jan 1, 1972

  • AUSIMM
    Aluminosilicate Inorganic Polymers from Waste Materials

    By D S. Perera, P Wal, D C. Southam, J L. Lowe

    The Cooperative Research Centre for Sustainable Resource Processing (CSRP) is undertaking a large research project involving partners from industry, universities and government, which aims to develop

    Jan 1, 2006

  • AUSIMM
    Practical Conditional Simulation for Geologists and Mining Engineers

    By Coombes J, Richards W. L

    The objective of this paper is to illustrate, in a practical way, how both geologists and mining engineers can use conditional simulation to add value to their decisions. Inherent assumptions, requi

    Jan 1, 1998

  • AUSIMM
    Small Scale VAT Leaching

    Major exploration companies can have a problem with what to do with small precious metal ore bodies located through exploration programmes. Low tonnage, but high grade, ore bodies too small to justify

    Jan 1, 1990

  • AUSIMM
    Computer-Assisted Production Scheduling at Western Titanium Limited, Capel and Eneabba, Western Australia

    The geographical and geological situations of the two mineral sand deposits currently being mined by Western Titanium Limited and the mining methods in use are briefly described. Production schedul

    Jan 1, 1977

  • AUSIMM
    The Pima II: A New Technique for Field-based Alteration Mapping

    By Cocks T

    The 15-year long debate between the industry, Government and Aboriginal people about the rights and wrongs of Land Rights, the right of Aboriginal people to control development on their land and the

    Jan 1, 1994

  • AUSIMM
    Process developments at Bouganville Copper Limited

    The original design of the Bougainville Copper Limited (BCL) concentrator took cognisance of the constraints imposed by the topography, the need to minimise capital cost, and the need to allow for pla

    Jan 1, 1986

  • AUSIMM
    Sampling of the Perseverance Nickel Deposit

    By Allchurch P. D

    At Perseverance a reserve of 45 million tonnes at 2% Ni was indicated by drilling. Holes were drilled in trellis pattern on section lines 61m apart to assess shallow mineralization. To explore at

    Jan 1, 1976

  • AUSIMM
    Sinking No. 3 Elliptical Shaft at North Broken Hill Limited Broken Hill, N.S.W.

    This paper describes the operation involved in the sinking of a concrete-lined elliptical-shaped shaft at North Broken Hill Limited.Major factors such as geological features, future ventilation, ore h

    Jan 1, 1956

  • AUSIMM
    Recent Improvements to Operations and Control of Pasminco Metals - BHAS Zinc Plant

    By Nolan D. P, Balales M

    Over the last two years work has been undertaken within the Pasminco Metals - BHAS Zinc Plant to improve the efficiency and maintain the production capacity of the operation. The work has centred up

    Jan 1, 1993

  • AUSIMM
    Effects Of Induration Conditions On The Structures And Properties OF iron-Ore Pellets

    By Bowling K. McG, Hamilton J. D G

    The influence of three important para- meters which affect the induration of iron-ore pellets, viz temperature, time, and lime content, have been assessed in terms of internal pellet structure and

    Jan 1, 1974