Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Rapid Alteration Mapping Using Field Portable Infrared Spectrometers

    By S Pontual

    Compact and field portable infrared spectrometers have been increasingly used over the past few years by an exploration industry constantly searching for a technological edge and the ability to more a

    Jan 1, 1999

  • AUSIMM
    Computer Assisted Remote Control and Automation System for Longwall Shearers

    By De Janti VP

    The automation and centralized monitoring of longwall type underground mining is presently an important subject matter of research in France. The purposes are :to improve safety and working conditions

    Jan 1, 1985

  • AUSIMM
    Geology of the Ladolam Gold Deposit Lihir Island, Papua New Guinea

    By Ballantyne GH

    The Ladolam gold deposit on Lihir Island, in Papua New Guinea, is a large disseminated gold deposit hosted by hydrothermal breccias. The deposit occurs in the cupola zone of a 350,000 year old mon

    Jan 1, 1987

  • AUSIMM
    Rockmass Damage Induced by Transient Blast Stress Waves

    By Aguirre E, Chitombo G

    The magnitude of stress variations associated with a blast wave near production pillars is analysed by modelling blast vibrations measured in the surrounding rockmass. The results indicate a wide va

    Jan 1, 1995

  • AUSIMM
    Practical Experience with the Morgensen Sizer and Current Design Trends

    Evolutionary changes to the original sizer concept are mild when compared to those which have taken place in the engineering standards embodied in today's commercially available machines. Thi

    Jan 1, 1978

  • AUSIMM
    Opening Address (c74147d9-e807-4319-b483-6be99c947374)

    This is the seventh major symposium organised by Illawarra Branch over the past five years and the fifth dealing with various aspects of coal. It is clear that all of you here need no convincing that

    Jan 1, 1975

  • AUSIMM
    The Development of a Procedure for the Inspection of Unlined Rock Service Tunnels

    By D Lees, D Gilchrist

    Sydney has hundreds of kilometres of sewer tunnels. Many of these are over 50 years old and some have been in service for more than 100 years. The tunnels are predominantly constructed in Hawkesbury S

    Sep 17, 2014

  • AUSIMM
    Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG mill

    By N S. Weerasekara, S Town, E Lessing, J A. De Torres

    Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi

    Aug 29, 2018

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    Modelling of an Integrated Waste Storage Facility

    By P Edmondson, S Narendranathan, S Setchell

    The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s

    Jul 27, 2015

  • AUSIMM
    A Geochemical Study of Island Arc Volcanism

    The Northern Mariana archipelago in the W.Pacific forms a classic intra-oceanic island arc system far from the influences of continental crust. As such it offers an ideal location in which to stud

    Jan 1, 1987

  • AUSIMM
    Understanding the Structural Controls on Arsenic Mineralisation and Ore Distribution at the Miitel Nickel Mine,Widgiemooltha, Western Australia

    By A W. Bewsher, T C. McCu, D B. Mapleson

    The Miitel nickel sulfide deposit has been overprinted by a family of late stage structures that have acted as conduits for fluids that have contaminated the orebody with arsenic minerals. This has re

    Jan 1, 2003

  • AUSIMM
    Specific Gravity of Ores

    Every estimate of ore reserves necessarily contains an assumption in regard to the specific gravity of the ore. This assumed figure may be based on experimental data, on textbook data, or on a reconci

    Jan 1, 1940

  • AUSIMM
    Geology and Blasting Objectives - Starting at Both Ends

    A key premise to this paper is that most people involved in the design and implementation of drilling and blasting operations could benefit from a greater understanding of the geological materials, de

    Jan 1, 1999

  • AUSIMM
    Managing the Risk During Mine Closure and Beyond

    Placer Dome Asia Pacific operates eight mines in the region and has two closed operations that are either under rehabilitation or at the latter stage of care, monitoring and maintenance. All operating

    Jan 1, 2003

  • AUSIMM
    The Application of the Seismic Method and Seismic Timers to the Investigation of the Depth and Quality of Magnestic Deposits Near Young, N.S.W.

    The magnesite deposits near Young, N.S.W., occur in decomposed serpentine rock below a soil. and alluvial cover. They show considerable variation in both quality and depth which greatly hampers mining

    Jan 1, 1962

  • AUSIMM
    Stope Filling with Thickened Classified Flotation Tailings (8ea60644-b41a-4846-93fc-367236e8ddfb)

    Stope filling practice on the Great Boulder Mine was described in -a paper published in Aus.I.M.M., Proceedings No. 137, in 1945. When the paper was presented the process had emerged from the experime

    Jan 1, 1948

  • AUSIMM
    Reducing Operating Risk by Training

    By Hanley J

    Coal winning in the Latrobe Valley exceeds 45 mtpa uses a small number of Bucket Wheel Excavators and high speed conveyor systems. While this equipment offers many advantages in the production cycle

    Jan 1, 1994

  • AUSIMM
    Development of the Argo Mine

    Peko Mines, a Division of Peko-Wallsend Operations Limited (PWOL) has operated several small underground mines in the Tennant Creek district of the Northern Territory supplying ore to a central t

    Jan 1, 1986