Not for the Faint-HeartedBy J Whittle
This paper describes what is involved in carrying out a comprehensive optimisation of a long-term operating schedule for a mining complex. It details the data that must be assembled and discusses the
Nov 24, 2014
-
Installations of the Computer at Mount IsaMount Isa Mines Limited first installed electronic data processing equipment in 1959. The decision to replace this equipment with a computer was motivated by the need for greater processing power and
Jan 1, 1968
-
Construction of Reinforced Concrete Chimney at Yallourn Briquetting WorksThe principal dirnensions of the chimney were fixed as follows: Height from formation to coping, 328 ft. 8 in.; inside diameter concrete shell, 13 ft. Gin.; inside diameter of the 4~-in. brick lining.
Jan 1, 1924
-
Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in ConcentrateBy M Spagnolo, M Ashley, D, L Reemeyer
PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in
Jan 1, 2003
-
Engaging Society about a Potential Mining Future – Concerns and ExpectationsBy N Boughen
This paper synthesises the findings of five studies undertaken by the CSIRO Wealth from Oceans Flagship in 2009-10. This research explores the concerns, expectations, and information needs of a range
Nov 22, 2011
-
Agglomeration for Copper Heap LeachingAgglomeration for Copper Heap Leaching Agglomeration of ore is a method which can be used to eliminate the migration of fine grained particles throughout a leach heap. Without agglomeration, fine ore
Sep 13, 2010
-
The Influence of Alluvial Gold Shape and Density on Discrepancies Between Prospecting and Mining Gold Grades: Implications for Plant Efficiency, Plant Design, and Mine ProfitsBy S Adamson
Morphological analysis of alluvial gold recovered from the same segment of a placer by four common commercial methods indicates that gold shape and the presence of quartz intergrowths or sulphide over
Jan 1, 2001
-
Presentation of Certificate of Honorary Membership to Sir Ian McLennan, K.C.M.G., K.B.E.By W. M. LONIE
Address by the President of the Institute (Mr W M Lonie) in making the presentation of the Certificate of Honorary Membership to Sir Ian McLellan, K.C.G.M, K.B.E. Address by Sir Ian McLellan after acc
Jan 1, 1979
-
Treatment of Wolfram, Bismuth, and Molybdenite Ores at Burma Queensland Corporation Mill, Wolfram, N.Q.THE old mill erected by the .Irvinebank Company consisted of 10 heads of stamps (850 lb.), rock-breaker, Hartz jig, two Krupp tables, two Luhrig vanners, three sand-pumps, one mixer; six flotation ves
Jan 1, 1920
-
Project Evaluation Due Diligence--Lessons from the Busang SagaThe general principles of technical due diligence best practice that are involved in assessing a mineral property in the early stages of its development are described and a bibliography of relevant pa
Jan 1, 1997
-
The successful deployment of a fatal risk system, designed for the front-lineBy C J. Pitzer
The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine
Mar 29, 2023
-
Professional Development for Metallurgists – Improving Technical SkillsBy D Drinkwater
In 2009, Peter Munro and Peter Tilyard examined the “human capital” in the mineral processing sector in a paper entitled Back to the Future (Munro and Tilyard, 2009). One of their major concerns was
Aug 8, 2011
-
Boring a Slime DamBy Met B
IN the followmg paper an account is given of work performed by the author for the purpose of sampling a slime dam on the leases of the North Mount Farrell Co. N.L., at Tullah, Tasmania, during the sum
Jan 1, 1928
-
Mine Shafts – Planning, Optimising and ConstructingBy D J. Kilkenny
Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq
Mar 21, 2011
-
Examples of Mine TimberingSo many emergencies that crop up in mining necessitate a departure from ordinary methods that the writer has been led to illustrate a few of the examples that have come under his notice during a somew
Jan 1, 1902
-
Kopanang Mine Rail Haulage Tramming SystemWith the theme of û æUnderground Ore Handling SystemÆ, Kopanang Mine completed an extensive project on a specific system with technologies for the handling of ore from a dedicated drawpoint to the sha
Jan 1, 2005
-
Underground Mines of TomorrowBy P Hatherly, H Gurgenci
With the depletion of the mineral reserves that can be mined by surface mining, demand for highly productive and safe underground mines will increase. Underground drill and blast techniques continue t
Jan 1, 1998
-
"Development of a Real-Time Fleet Cost Tool as Part of an Integrated Remote Mine Control Centre of an Integrated Remote Mine Control Centre"By S D. Dessureault
In large coal strip mines, there are many different processes at work: stripping, overburden removal using trucks/shovels, cast blasting, slot dozer pushing, more fragmentation and further truck/shove
Sep 26, 2011
-
Who is Responsible for Grade? – An Evaluation of the Value Chain at Mt Magnet Gold Project, Western AustraliaBy A Weeks, W J. Shaw, A Kuk
Grade control is a process that requires the interaction between many components of the mining operation and successful grade control is only realised through good data, robust systems, and a well-tra
Aug 18, 2014
-
From Voluntary Codes to CertificationMore than in any other way, the community judges the minerals industry by its environmental performance. Minerals Council of Australia web site www.minerals.org.au/media/code Time is overtaking us. Wh