Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Engel Model-A Simulator for Optimizing Exploration Effort

    By Rowlands N. J, Zimmermann D. O

    The Engel Model search simulator is described with particular emphasis on preparation of input parameters. The computer has a "black box" role in the same way a telephone or radio is a "black box"

    Jan 1, 1974

  • AUSIMM
    US Bureau of Mines Coal Mining Automation Research

    By Bevan JE

    The US Bureau of Mines is conducting research to improve the health and safety for underground coal miners, and the efficiency of the mining systems that are used. In 1986, the Bureau began a major re

    Jan 1, 1991

  • AUSIMM
    Elasto-Plastic Finite Element Structural Stability Analysis of Room and Pillar Mine Workings

    By Porter I, Singh RN

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine struc

    Jan 1, 1992

  • AUSIMM
    History and Present Operation of the Heavy Medium Separation Plant at Renison Limited, Tasmania

    In 1972, metallurgical testwork on Renison ore indicated a significant proportion of low specific gravity, tin-barren material ideally suited to heavy medium separation (HMS). Further technical an

    Jan 1, 1978

  • AUSIMM
    Polypropylene Membrane Filters

    Filter Presses are used in a wide range of process industries where high quality filtration at elevated pressure is required. This is mainly due to the fact that modern presses are fitted with poly

    Jan 1, 1989

  • AUSIMM
    The Design and Construction of a Reinforced Concrete Headframe for the Haulage Shaft at the New Broken Hill Consolidated Limited Min, Broken Hill

    The construction of mine headframes of reinforced concrete is not a new departure as many structures have been built of this, material particularly in Canada and South Africa. This type of constructio

    Jan 1, 1956

  • AUSIMM
    A Detailed Assessment of Concentrator Performance at Broken Hill South Limited (a6fcafc6-c375-4bcb-a3c6-c657d3498196)

    By Restarick C. J & Stewart P S B, Kelsall D. P

    Over a four-hour period of steady plant operation samples were taken at regular intervals from points within the grinding and flotation circuits. Size fractions of each composite sample were analyse

    Jan 1, 1980

  • AUSIMM
    The Nickel Industry - A WMC Perspective

    By Hall S, Upton D

    WMC Resources Ltd nickel operations have expanded significantly over the last three years. Production capacity has increased at mine/concentrate, smelting and refinery processes to such an extent th

    Jan 1, 1996

  • AUSIMM
    Effect of Ore Type and Size Distribution on the Granulating Characteristics of Iron Ore

    By J Manuel, R Muddle

    The demand for iron ore has increased significantly in recent years, with new iron ore sources being mined to meet this demand. As the composition of sinter blends changes with the availability and co

    Jan 1, 2005

  • AUSIMM
    Blast Monitoring : From Detonation to Impact

    The intention of this paper is to examine the practical and technical aspects associated with the measurement of blasting related phenomena. The emphasis is directed towards the acquisition of quan

    Jan 1, 1990

  • AUSIMM
    On-Stream Analysis and Sensors for Mineral Processing

    By Mathew P. J

    The CSIRO Division of Mineral and Process Engineering in Melbourne has been developing on-stream analysis sensors based on neutron and gamma radiation for better control of quality and process opera

    Jan 1, 1991

  • AUSIMM
    Coking Coal and Iron Ore ù Comparisons and Contrasts

    The products from beneficiation present themselves at opposite ends of the spectrum, and yet numerous synergies exist in the preparation of coking coal and hematite iron ore products for their common

    Jan 1, 2005

  • AUSIMM
    Short Term Mine Management Systems û An Integrated Approach to Blast Design, Grade Control, Stockpile Management and Reconciliation

    An integrated computer system (the Short Term Mine Management System) has recently been developed by B.H.P. Steel Long Products Division in Whyalla, South Australia for use in their open pit iron ore

    Jan 1, 1990

  • AUSIMM
    Development of a Dynamic Simulator for CIP / CIL Plant Optimisation and Design

    By Napier-Munn T. J, Morrison R. D, Moloney M. J, Corrans I. J

    A dynamic simulator for CIP / CIL gold recovery plants has been developed at the Julius Kruttschnitt Mineral Research Centre within a collaborative, industrially - funded AMIRA project and with the

    Jan 1, 1991

  • AUSIMM
    LaModel – A Program for Coalmine Modelling

    By K A. Heasley

    The LaModel program was initially developed in 1993, and it is used to model the stresses and displacements in thin tabular deposits such as coal seams. It uses the displacement-discontinuity variatio

    Nov 5, 2014

  • AUSIMM
    Measurement of Residual Shear Strength Using a Modified Direct Shear Apparatus

    By L Tatnell, R Mackay, A Tolooiyan

    The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is

    Nov 5, 2014

  • AUSIMM
    The Development of Colloidal Mixer Base CRF Systems

    By A E Reschke

    The high-shear colloidal mixer is generally recognised as the most efficient method of mixing cement based grouts. Only recently however has this technology been applied to the production of cemente

    Jan 1, 1998

  • AUSIMM
    Conversion of hard-to-use wastes to new raw materials for low-energy glass/mineral-wool manufacturing

    By Z Li, Z Yan, T Htet, S Zhang

    During the pyrometallurgical processes, a substantial quantity of high-temperature ironmaking and steelmaking slags, generated at temperatures ranging from 1400 to 1600°C, is wasted, as the heat conta

    Aug 21, 2024

  • AUSIMM
    Effect of C/A ratio on the crystallisation behaviour and structure of calcium-aluminate based alternative mold fluxes for casting medium and high Mn/Al steels

    By A Nigam, K Biswas, R Sarkar

    Because of the problems with 1st and 2nd generations of Advanced High-Strength Steels (AHSS), a 3rd generation of AHSS steels has become prominent and these steels have properties in between the 1st a

    Aug 21, 2024

  • AUSIMM
    Impact testing of raise bore protection mesh

    By M Doran

    The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3

    Mar 29, 2023