Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Techniques Used and Problems Encountered in Normal and Reverse Circulation Drilling at the Mt Roseby Project, Cloncurry, North West QueenslandTechniques Used and Problems Encountered in Normal and Reverse Circulation Drilling at the Mt Roseby Project, Cloncurry, North West Queensland
Sep 13, 2010
-
Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising ValueBy G M. Taylor
The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past
Sep 17, 2014
-
Simulation Modelling of Mining SystemsThis paper discusses the requirements for a successful simulation modelling study, and the steps involved in the modelling process. Advantages and disadvantages of simulation are described, and a case
Jan 1, 2000
-
Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer ProjectsBy N Lewis
Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying
Mar 8, 2011
-
KEYNOTE: Back to the Future – Still on the Dark SideBy P D. Munro
"This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and
Oct 10, 2016
-
The Measurement of Rock Stress for TunnellingBy I Gray
While in some cases it is vitally important to measure the virgin stress in rock prior to tunnelling there are a number of cases where such stress measurement is really not required. The concept of ha
Sep 17, 2014
-
Waste Not, Want Not – Rethinking the Tailings and Mine Waste IssueBy S Joyce, Z Agioutantis, D van Zyl, D Shields
Over the past 15 years, the mining industry has begun to incorporate the concepts of sustainable development and sustainable mining practice across the life cycle of mineral operations. This requires
Jul 27, 2015
-
A Novel Approach to Estimate the Gap Between theáMiddle- and Short-Term PlansBy J Ortiz
In almost all copper mining companies, mine planning is done considering different time frames, leading to long-term (life-of-mine) (LOM), medium-term (first three years) and short-term (first year, m
Sep 26, 2011
-
Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal ReefsBy J J. Laas, A J. S Spearing
Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Vaal
Jan 1, 1998
-
Ballarat East-From Eureka to the 80'sThis paper puts the view that, for one gold deposit in Victoria at least, the Australasian Code for the Reporting of Identified Mineral Resources is severely deficient. The author questions whether
Jan 1, 1990
-
The Mineral Composition of Ore from the Hill 50 Gold Mine, Western AustraliaOre from the Hill 50 Gold Mine, consists essentially of pyrrhotite, with minor amounts of pyrite, chalcopyrite, galena and gold, replacing "jaspilite." The gold is associated with the sulphi
Jan 1, 1955
-
Keeping Projects on the RailsBy J Canterford
Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be
Aug 8, 2011
-
Dashboards, data sources and a modern data platformBy D Bruce
OZ Minerals’ Carrapateena mine is a Sublevel cave mine located in South Australia, approximately 160 km north of the regional centre of Port Augusta. Carrapateena commenced underground development in
Mar 29, 2023
-
The Application of Resource Control in A Mining OperationAccident control has been a pre occupation of progressive industrial and mining companies for many years but few have attempted more than direct injury control. In recent years, particularly in Nor
Jan 1, 1975
-
Bucket Wheel Excavator Mining System Experience at NZ Steel Mining Ltd's Ironsand OperationAt the Waikato North Head Ironsand operation, NZ Steel Mining Ltd is using a Bucket Wheel Excavator û shiftable conveyor mining system to excavate Titanomagnetite bearing sand and clay. The syst
Jan 1, 1986
-
Bulk Low-Grade Mining at Mount Charlotte MineBy M F. Lee
Although the Mt Charlotte gold resource was discovered in 1893, it was only in 1954 that geologists correctly interpreted drill data and defined a large low-grade orebody. The mine has been a large, l
Jan 1, 2000
-
Solid bowl decanter centrifuges – the alternative technologyBy M Player, R Klug, N Schwarz
There are several technologies available for thickening and dewatering of mining process slurries. The most commonly used are thickeners and filters, but technological developments have made solid bow
Jul 1, 2021
-
The Contribution of Diamond Drilling to the Geology and Development of the Ipswich CoalfieldDrilling at Ipswich during the last twelve years by the Queensland Department of Mines has proved large quantities of reserves which have assured the security of the field for many years to come. This
Jan 1, 1963
-
Designing Flotation Cells For Optimised Flow DynamicsBy T Niitti, J Turunen, P B, A Rinne
In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati
Jan 1, 2006
-
An evolution of drill hole spacing studies at Newmont CorporationBy A Jewbali, L Allen
At Newmont Corporation drill hole spacing studies are done to support the business in understanding the cost of collecting additional information (with a specific focus on drill hole sampling density)
May 24, 2023