Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Some Comments on How Mining Departments and Schools Can Survive a Cyclic Downturn

    By S Thomas, E Grimsey

    Mining education in Australia has undergone another cyclical downturn over the past five years and several departments have been discontinued while others are still teetering on the brink of destructi

    Jan 1, 2004

  • AUSIMM
    Drawbacks in Sluice box operating Practices in Papua New Guinea

    Sluice box operating practices in Papua New Guinea (PNG), and published work on sluice boxes are briefly reviewed. Some recent work on sediment entrainment mechanisms occurring in sluice boxes hav

    Jan 1, 1991

  • AUSIMM
    Industrial Strength Optical Image Analysis System - Mineral4/Recognition4

    By S Hapugoda, J R. Manuel, M J. Peterson, A Poliakov, E Donskoi

    ################

    Aug 12, 2013

  • AUSIMM
    The Geology of The Triton Gold Mine, Reedy, W.A.

    The method of investigation was to study the distribution of ore in great detail, to make a thorough structural study of the lode and the mine area, and then to compare the results of the two studies.

    Jan 1, 1943

  • AUSIMM
    Mining - The Environmentalists' Viewpoint

    The paper examines the difficulties encountered by objectors to mining privilege applications. It describes the various involvements of the environmental defence society in the mining controversy and

    Jan 1, 1981

  • AUSIMM
    Permitting, Construction and Commissioning of the Gosowong Gold Mine, Halmahera, Indonesia

    By D J. Corp

    The Halmahera Contract of Work is a sixth generation contract held 82.5 per cent by Newcrest Mining Limited and 17.5 per cent by PT Aneka Tambang and takes in the Gosowong Project area. In 1991 Newcre

    Jan 1, 1999

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • AUSIMM
    Indicator and Quartz Reefs

    During the past Two years in reef gold mining, "indicators" have received great attention at the hands at the Victorian gold seekers. Many years ago, what was caned the" indicator lode,

  • AUSIMM
    The Grande Côte Mineral Sands Project

    By M C. Ackland

    The Grande Côte Mineral Sands Deposit (GCMSP) is located on a coastal mobile dune system in Senegal on the west coast of Africa. Senegal is a stable, democratic republic, having gained its independenc

    Oct 5, 2011

  • AUSIMM
    Analysis of jig behaviour in coal preparation plants in China

    A wide-ranging base of jig data was collected from various types of commercial jigs in 9 coal preparation plants in China, and a complete data analysis was made. It was found that the sharpness ofsepa

    Jan 1, 1986

  • AUSIMM
    Science Technology and the Mineral Industry Mines and Universities û A Vital Link

    Engineering education has become a matter of national concern, at last, so I would like to talk about the links between the mining industry, the universities and technological developments. The Austra

    Jan 1, 1989

  • AUSIMM
    How Can You Justify Buying More Larger Equipment When Your Smaller Existing Equipment Isn't Worn Out?

    This paper discusses equipment replacement strategies and specifically addresses the upgrading of technologically superseded equipment. The process of equipment replacement evaluations is reviewed, an

    Jan 1, 1992

  • AUSIMM
    Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold Mine

    By S Graskoski, S Craig, C Myburgh

    Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora

    Sep 26, 2013

  • AUSIMM
    Mining Scenario Analysis and Mine Variable Value

    By B E. Hall, J Poniewierski, A J. Hills

    Following a review of life-of-asset work at MMG’s Rosebery mine in which a proposal to increase production from 0.8 Mt/a to 1.2 Mt/a was mooted, questions were raised as to the seemingly arbitrary rea

    Mar 24, 2014

  • AUSIMM
    Improvements to Blasting Practices at Ok Tedi

    By Beevers J

    The Ok Tedi Project is now a high production open-pit porphyry copper mine located in the Star Mountains of Papua New Guinea (PNG). At present, total daily production is 190 000t of ore and waste.

    Jan 1, 1991

  • AUSIMM
    Interactive Modelling and Visualisation of Large Deposits Using Linear Octrees

    Large deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod

    Sep 26, 2011

  • AUSIMM
    Opening Address at Annual Conference, 1973

    It is a pleasure and a privilege to be with you for the Annual Conference of The Australasian Institute of Mining and Metallurgy.The inaugural meeting of The Institute was held in Adelaide in April, 1

    Jan 1, 1973

  • AUSIMM
    Carmen Copper – A Sustainable Approach to Tailings Thickener Upgrades

    By C Maloloy-on, S Morgan, M Deiparine, H Mackie

    There is a strong focus in the mining industry to limit its impact on water quality and usage. This is even more evident in developing countries, where mining companies operate within local communitie

    Sep 7, 2015

  • AUSIMM
    Upgrading Low-grade Gold Ore Stockpiles by Preconcentration Using Ore Sorting – an Assessment of the Economic Impact and Viability

    By A N. Parry, G van Wyk

    "Sensor based automatic ore sorting technologies are used in the minerals industries to efficiently remove waste and submarginal grade material from crushed and screened run-of-mine (ROM) ore, produci

    Oct 10, 2016

  • AUSIMM
    Mount Isa Copper Mines ù Role of the Mining Engineer

    By B J. Andrew, M R. Daley

    Mount Isa Copper Mines is a world-class mining operation producing approximately six million tonnes of ore per annum. With over 50 years of mining history and over 76 million tonnes of underground res

    Jan 1, 2005